NBS Source
I'm a manufacturer

"above ground foul drainage systems"

705 results found

Sort by:

Showing 1-36 of 58

Sponsored
Versatile 52mm Drainage Cell

Versatile 52mm Drainage Cell

Atlantis

The 52mm drainage cell has been used as normally in two guises. Firstly as a TurfcellTM grass reinforcement such as at Natural Designer Homes , a display home in Casuarina NSW. The photograph of the driveway is from about 1year ago, some 4 years from installation. As there are several cars in the family as well as work trucks the installation looks quite good.Secondly as a Gravel cellTM gravel retainer, such as that used at Leaf and Limb Nursery in Kin Kin Qld., where they use the 52mm cell in the walkways as this makes it easier for them to run the trolley through the gravel.However there is a third use for the 52mm drainage cell. That is as walk ways in mining camps. Traymark Industrial Caravans make the vans for accommodation for the workers and Atlantis® 52mm cells are supplied with each van to be used as a walk way to keep workers out of the mud and dirt when at their accommodation..Secondly as a Gravel cellTM gravel retainer, such as that used at Leaf and Limb Nursery in Kin Kin Qld., where they use the 52mm cell in the walkways as this makes it easier for them to run the trolley through the gravel.Now for another use: a client already was successfully using our 52mm drainage cell as reinforcement for parking bays beside a river and in August 2011, it occurred to him that he could extend the parking area into a boat ramp. Our 52mm drainage cell is made from recycled polypropylene with U. V. protection, in sheets being 480mm x 260mm x 52mm.Two tracks, being 0.96m in width were connected to the 52mm drainage cell in the parking area and also were secured by metal hook pegs to the drainage cell of the parking area. The tracks lead to a full width ramp (2.88m in width) into the water.To prevent the ramp from sinking fully into the silt, the ramp and adjacent section of the two tracks are formed by two layers of 52mm drainage cell connected to each other by cable ties. Metal hook pegs were also used to assist in holding the ramp in position.We contacted our client in August 2017 and he is very happy with the boat ramp which is still in use despite several floods, and constant exposure to the elements.Thus the high load bearing of approximately 4000t/sq. M and the long useful life of the 52mm drainage cell has permitted the 52mm drainage cell to be used and still being used in many ways.
Sponsored
Wall Panels for Seeping Walls

Wall Panels for Seeping Walls

Atlantis

APPLICATION: 30mm Wall PanelsPROJECT LOCATION: Redland Bay QldPROJECT DETAILS: Seeping WallsPROJECT COMPLETION: Jun 2011Atlantis fixing old water seepage problemsA property in Redland Bay Qld was having water seeping through the walls of the lower part of the property, which was below ground level.A trench was excavated to expose the walls which were below ground level, and the walls were allowed to dry out.A waterproof membrane was affixed to the wall and Atlantis® Flo- pipe® geotextile wrapped perforated pipes were clicked together and laid on top of the lower fold of the water proof membrane.A run of Atlantis® Flo-cell® drainage cells was sat on the perforated pipes and taped to the waterproof membrane, to extend along the length of the trench. The run of drainage cells was covered in hydrophilic geotextile and the trench filled in with compacted gravel.The water proof membrane formed a barrier to prevent water from contacting the walls of the property, while the 30mm drainage cell formed an air gap to relieve any hydrostatic pressure on the water proof membrane. Any water entering the drainage cell falls into the perforated pipe where it is taken away. This arrangement has been used, literally, thousands of time to overcome or prevent this seepage problem.
Sponsored
Silkstone State School Parking Bays

Silkstone State School Parking Bays

Atlantis

APPLICATION: 52mm Drainage Cell.PROJECT LOCATION: Silkstone Qld.PROJECT DETAILS: Parking Bays at the Silkstone Primary School.PROJECT COMPLETION: Sep 2013.Atlantis system saves big old tree.At Silkstone State school Qld. a contentious issue arose. The school required car parking and a sealed one at that. But, in the proposed car park was a huge old tree. The tree could be cut down and the roots dug out or the tree couldbe left, with open soil above the root system to allow for infiltration to keep the tree healthy; but this would lose atleast six car spaces. What was to be done?The answer turned out to be simple – keep the tree, but surround the tree with Atlantis® Gravel Cell™ 52mm cells.Hence while the rest of the car park was sealed, the areaaround the tree was prepared and the 52mm cells werelaid and clipped together there and filled with 10mmgravel. This area was of sufficient size to provide 3 carplaces on each side of the tree and a driveway in frontof the tree, while at the same time allowing rainfall toinfiltrate through the gravel into the root system.Thus we had a win-win situation. Not only was the treesaved, and money saved on not having to remove it, butthe root system of the tree was protected by the GravelCell™ system, and six extra car spaces were created.
Sponsored
Dubai Metro Station, Dubai

Dubai Metro Station, Dubai

Rondo Building Services Pty Ltd

Rondo has supplied an external soffit ceiling frame for the Dubai Metro Station project. The Green Line of the Dubai Metro is the second Dubai Metro light rail line in Dubai. The route starts in Al Ghusais, and runs along Al Nahda Rd and Salahuddin Rd above ground. The Green line runs through Deira and Bur Dubai and generally runs parallel to Dubai Creek.
Sponsored
Wave Apartments, NSW

Wave Apartments, NSW

Bent & Curved Glass

Designed by Benson McCormack Architects and built by Hone Constructions. The curved glass elements seen at the ground level entry shopfronts and in the feature penthouse facades are key to the undulating design which becomes the signature for the “Wave” Apartments building. In particular the projecting curved façade at each end of the penthouse roof level is a major element of the architectural design and a feature that can be seen from afar. The sweep of the concrete rood appears to float above the skin of curved glass creating a dramatic visual effect.
Sponsored
Preserving a World Heritage Site

Preserving a World Heritage Site

Atlantis

APPLICATION: Road CellPROJECT LOCATION: Chan Chan PeruPROJECT DETAILS: Protecting Walkways and Preventing erosionPROJECT COMPLETION: Sep 2016Chan Chan, the largest City of the pre-Columbian era in South America is now an archaeological site in La Libertad Region, 5 kilometres west of Trujillo Peru. Chan Chan is located in the mouth of the Moche Valley and was the capital of the historical empire of the Chimor from 900 to1470, when they were defeated and incorporated into the Inca Empire. The city Chan Chan spanned 20km2 and had a dense urban centre of 6 km2.The increasing popularity of the site forced the authorities to consider how to protect the walkways and to provide drainage, to remove rain water from the site to prevent erosion. The solution was to use the Atlantis® Road CellTM 53mm drainage cell. This installation made Chan Chan the second World Heritage site in all of Peru to have a highly technical system of protection of the original pavement installed and it covered almost the entire tourist circuit with the exception of the funeral zone.A layer of water proof membrane was laid down on the walkway and the the Atlantis® Road CellTM 53mm drainage cells were clipped together on the water proof membrane and filled with gravel. Thus providing protection for the walkway and also providing a drain for directing rain water away from the archaeological site to ameliorate erosion. Also it facilitated the access of visitors, especially those with disabilities, by providing a firm stable walk way.In all 1,700 m2 of the Atlantis® Road CellTM 53mm drainage cell were laid, and filled with gravel.
Sponsored
Ferrari World, Abu Dhabi

Ferrari World, Abu Dhabi

Rondo Building Services Pty Ltd

Rondo supplied the Drywall Framing System in the construction of Ferrari World in Abu Dhabi, which is the world’s largest indoor theme park ­– including wall heights that ranged from 9 meters and above.
Sponsored
Rainwater harvesting for a government facility

Rainwater harvesting for a government facility

Atlantis

Project Location: Amberley, Queensland, AUSTRALIA.In Amberley is one of the largest base facilities in Australia. The redevelopment works are valued at AU$331.5 million. New construction and refurbishment works to be undertaken include newliving-in accommodation, maintenance facilities, storage, working and training accommodation, a combined mess and a new physical fitness centre.The site is owned by an Australian Government Department. The Atlantis® Turf Cell® was supplied by Atlantis and was installed by Kennedy Projects Group in April 2009. The system is located at the playing fields on the south-western corner of Gannet St and Rosewood Road, Amberley, QLD.A vegetated swale surrounds the playing field. The swale is an open, shallow channel designed to slow runoff, filter it, and promote infiltration into the ground. Excess water moving through the soil profile is captured by Atlantis® Matrix® Tank – Single modules. The use of a swale to collected water results in smaller runoff volumes, lower peak discharge rates and cleaner runoff. The vegetation in swales, usually thick grass, helps to trap pollutants such as suspended solids and trace metals. The Atlantis Matrix modules extend 3m (10ft) wide under the swale for 110m (360ft).Water collected by the swale is collected in a stormwater harvesting tank located adjacent to the north-western corner of the playing field. Perforated corrugated plastic pipes used as subsurface drainage pipes extend for 1560m (5110ft) is also collected by the stormwater harvesting tank.The stormwater harvesting tank is located subsurface and is constructed of a heavy duty low density polyethylene liner and non woven geotextile surrounding Atlantis® Matrix® Tank - Double modules. The Atlantis stormwater tank has a 4,100m3 (144,80 ft3) capacity. Water collected by the swale and stormwater tank system is used for irrigation of the sports field.The Atlantis stormwater tank has eight (8) cleanout / inspection ports placed through the systems. A 1200mm (4ft) dia. wet well with bolt down lids has been installed adjacent to the tank serves as a pump out pit. The overflow from the tank has a 15m (50ft) long x 400mm (1.3ft) deep spill way with scour protection into an adjacent creek.
Sponsored
BMI EVERGUARD TPO EXTREME NEW ROOFS  & TPO EXTREME RETROFIT OVER EXISTING METAL ROOFS

BMI EVERGUARD TPO EXTREME NEW ROOFS & TPO EXTREME RETROFIT OVER EXISTING METAL ROOFS

BMI Flat Roofing Australia

CASE STUDYS LISTED ABOVE IN PICTURE 4
Sponsored
45 Clarence Street

45 Clarence Street

Construction Specialties

45 Clarence St, is a striking office tower located in the busy western corridor of Sydney’s commercial district, with extensive views of Darling Harbour and Barangaroo, it is a prestigious building with various companies operating inside this office building, such as Business Sydney and CBRE.As part of the refurbishment, which included the lobby upgrade, CS worked extensively with the property management team, architect, builder, and installer to deliver the architectural grilles for this project. There was a unique vision to use the Econoline indoors in a commercial building instead of using it as an outdoor vision barrier grille. The focus of this refurbishment was to provide a bespoke architectural grille to line the ceiling and vertical walls of the lobby and modernise the building.The Econoline is typically used in locations such as parking garages, concealing mechanical equipment and for many refacing applications. Having the Econoline installed in a commercial building is a unique opportunity that will result in more products being used for aesthetic purposes. The challenge that was faced with the Econoline being used indoors was that the tapered vertical walls on two sides as grilles needed to be a certain distance above ground level and to be structurally sound.On completion, the lobby at 45 Clarence St Sydney is unique from your typical office building. This is also exciting for CS, to be part of a project that has been transformative and elegant in design.
Sponsored
Family Connections, VIC

Family Connections, VIC

Capral Aluminium

Steve Domoney Architecture took on the challenge of designing a home for clients with children. This project came with a clear vision of a spacious family home, contemporary in line and warm in tone. The dining room has Capral AGS windows opening at exterior ground level to a fernery, while high-level Capral AGS 419 Flushline Framing System beyond the kitchen provides views to distant trees in the south-east. The formal lounge opens to a generous decking and garden behind.
Sponsored
One Melbourne Quarter

One Melbourne Quarter

Sculptform

The first stage of a two hectare urban regeneration development in Docklands opened in 2018 and introduced the city of Melbourne’s first elevated public park. Floating 10 metres above open public space, a spectacular Tongue & Groove Cladding Soffit overhangs 90 metres, providing natural warmth and texture and remaining consistent with the design of the project. Installed by our partner installer Casello, the project is an example of how our expert installers can complete a project on time and on budget. Green space in the CBD Biophilic design principles were a key to the design of One Melbourne Quarter, bringing the warmth and beauty of natural materials to the workplace. The most prominent inclusion is the spectacular Skypark, located directly above the entrance of the building, on the second floor. The Skypark is a perfect ‘suspended oasis’, bringing the uniquely relaxing aspects of a local park to the inner city. A statement through a soffit With the Skypark suspended above street level, the underside presented a perfect opportunity for the architects Denton Corker Marshall to create a unique feature which was consistent with the design ambitions of the project. Behind the look Sculptform Tongue & Groove Cladding provided a beautiful natural aesthetic in spotted gum. The combination of visual features and colour variation contrasts the greys of the Melbourne CBD and contributes to the overall identity of the project. PEFC certified timber was required to meet Green Star Rating, which was then sourced by Sculptform.
Sponsored
Permeable Car & Trailer Park

Permeable Car & Trailer Park

Atlantis

Snapper Creek Car Park was developed as an environmentally friendly permeable car park. As such the Atlantis® Turf CellTM and Atlantis® Gravel CellTM systems were chosen, to provide gravel driveways and grass parking areas, thus preventing compaction of the soil and to protect the grass and to stabilize the gravel and provide a permeable car park.The parking areas were divided into car only parking and car & trailer parking.The area, consisting of natural sandy material, was excavated to a depth of 300mm, and a tensar grid was placed into the excavation and the excavated material placed back on top of the tensar grid and compacted.A layer of 100mm of gravel was then place on the areas where the Atlantis® Gravel CellTM modules were to be used and the Atlantis® Gravel cellTM modules positioned thereon and filled with gravel.The Atlantis® Turf CellTM modules were installed and filled with soil and then the area was grass seeded; no turf was used. The project was completed in mid 2014 and was at that stage semi grassed and in use.The project required 4,300sq. m of Atlantis® 52mm drainage cell, which are 480mm x 260mm x 52mm panels and have a rigid interlocking clipping system and are made from recycled polypropylene.In August 2017, the operators of the car park, which is still operating, were contacted and they stated that they were extremely happy with the condition of the car park, even though it has heavy traffic as there is a boat ramp there, and some areas have been flooded by Snapper Creek.The Atlantis® Turf CellTM & Atlantis® Gravel CellTM systems are specifically suited for car parks, access roads, aircraft taxiways and helicopter landing pads as it has the following features:a high load bearing of approximately 4000t/sq. M;protects the root system from compaction, while allow for vigorous horizontal and vertical root growth;permits surface water absorption and infiltration; andhave a long use life.
Sponsored
The Grand Hôtel-Dieu, France

The Grand Hôtel-Dieu, France

Guardian Glass (Australia)

Didier Repellin, from the architectural firm RL & Associés, oversaw the project. As honorary Chief Architect of Historical Monuments and a member of the French Heritage Society (among other titles), he was the perfect choice for the renovation of the buildings and the grounds. His vision was to make use of the history of the city to embellish the ancient buildings and has done so by respecting the history of the Hôtel-Dieu while giving back the grounds to the inhabitants of Lyon.
Sponsored
Abian Apartments, QLD

Abian Apartments, QLD

Rondo Building Services Pty Ltd

To set the internal aesthetics apart from other similar projects being built in Brisbane, Wood Marsh Architects designed some jaw-dropping gold ribbon ceilings that hover above the modern curved walls, which elegantly wrap around the lobby floor. In saying this, achieving perfection is not a simple task and none of this could have been accomplished without Rondo’s technical designs and NAC’s expertise in making them come to life.
Sponsored
University Hospital Geelong Expansion, VIC

University Hospital Geelong Expansion, VIC

Capral Aluminium

Designed by Silver Thomas Hanley (STH) Architects, the structural additions provide four extra levels of useable space above the existing emergency department. As a construction-managed project, the design and construction teams were able to work in concert to ensure all specifications were correct and appropriate at every stage of the work. Having considered the project challenges, including site constraints, access and speed in which the project needed to be completed, CW175 was chosen for its flexibility, engineering and structural integrity.
Sponsored
West Side Place - Stage 1, Towers 1 & 2

West Side Place - Stage 1, Towers 1 & 2

Bostik Australia Pty Ltd

At Bostik, innovation comes in many forms.Ultraset® 3 in 1 is Bostik Australia's premium timber floor adhesive incorporating Thickness Control™ Spacer Technology, a proprietary feature consisting of recycled, ground-up car tyres mixed throughout the adhesive.When applied, the Thickness Control™ Spacers act like tiny rubber pillars, suspending the timber and maintaining optimal adhesive thickness to ensure superior performance as a moisture and impact sound reduction membrane.For West Side Place, Ultraset® 3 in 1 presented significant time and cost savings vs conventional multi-layer acoustic systems by eliminating the need to install a separate moisture barrier, acoustic underlay and additional layers of adhesive. Efficiencies that flowed directly onto the construction team, supporting trades and ultimately the developer, delivering a high performance solution within budget, ahead of schedule all the while guaranteeing a compliant and comfortable environment.
Sponsored
Star City Casino, NSW

Star City Casino, NSW

Rondo Building Services Pty Ltd

Rondo partnered with contractors ‘Sydney Projects’ once again, along with architects ‘The Buchan Group – Sydney’ to develop and execute the proposal for this project which involved the re-development of the retail arcade through the ground floor level, along with the eastern portion of the casino to contain additional commercial/tourist facilities, external works to the existing tower building and landscaping and public domain works
Sponsored
Colour by Design - Eden View Apartments

Colour by Design - Eden View Apartments

ECOTONE

Collaboration Architect: PB&A ArchitectsBuilder: Ganellen ConstructionPrecaster: ConcretecDeveloper: Young & PartnersMaterial & ApplicationWe created and applied various tones of ECOTONE Matt and ECOTONE Sharp to grey brick moulded precast concrete to replicate natural brickwork. Application completed within the Concretec precast yard with final finishing onsiteOutcomeAll ECOTONE colours were customised in consultation with the client to deliver a realistic aesthetic in line with the architect’s vision.TestimonialThanks for the really great job your team have done on the project. It looks bloody fantastic.The detail and effort you have put into the brick authenticity really lifts the entire project above where even we had hoped it would be. We are extremely pleased with the result, and I hope we get to work again on a future projectPeter Allison, PB&A Architects
Sponsored
Gurner Apartments, QLD

Gurner Apartments, QLD

Rondo Building Services Pty Ltd

Located in Fortitude Valley in the heart of Brisbane. Builder, Multiplex began Stage 1 of this $200m project in May 2015 and completed it in July this year. Subcontractor, Precision Interior Walls & Ceilings enlisted Rondo’s expertise in designing the internal ceilings and partitions, external walls and soffit framing. Designed by Architect’s Elenberg Fraser, Stage 1 of the development consisted of 32 levels with 910 luxury apartments sprawled across two towers. This will eventually form part of three residential towers incorporating ground floor retail areas, cafés, restaurants and over 1000 apartments in total.
Sponsored
Termimesh - Protecting Historical Landmarks – Norwood Oval Adelaide

Termimesh - Protecting Historical Landmarks – Norwood Oval Adelaide

Termimesh

Termi Home & Commercial (SA) were proud to be a part of the historic Norwood Oval Redevelopment project in Adelaide, South Australia. As one of the most iconic football grounds in Adelaide only a non chemical termite management solution would do. We designed and installed the Termimesh System keeping in mind both the historical significance and the new facilities.The suitability of the Termimesh system for this project is based on its flexibility, which was necessary due to complex external geometry of the new construction and integration with the existing buildings. This presented challenges in performing remedial work. For example the Sir Edwin Smith Grandstand is heritage listed meaning minimal work was allowed to the external façade. This is where the strength of our termite management system lies. It can be customised for each individual project. Our estimating and design team will work alongside the architect, marking up plans and explaining how the system is applied to the design. Which in the case of the Norwood Oval was extremely important. We are on hand during the construction phase to iron out any challenges that may arise ensuring the installation process is simple, smooth and straightforward.Termimesh has maintained our position as market leader in termite protection in the South Australian construction industry for over 25 years, with a strong domestic and commercial portfolio. We are one of few companies that are triple certified to AS48001, ISO9001 and ISO14001 which delivers additional peace of mind for our clients.CONSTRUCTION TEAMSchiavello ConstructionOur team has a good relationship with the lead contractor, Schiavello, having worked on past projects together. They knew our capability and after a detailed review of the construction programme, we were sure we could meet their requirements. As a supporter and sponsor of the Norwood Football Club, Schiavello recognised the significance of the project for the community.  PROJECT DETAILSClient                          City of Norwood, Payneham & St Peters. Specifying Architects                                    Tridente ArchitectsInstallation Year                                              2019Installation Duration                                      7 monthsProject Value                                                    $9 mil TECHNICAL DETAILSInstallation Type                                             NumberService penetrations                                     200Column blockouts                                          7.5 LM                 Cluster penetrations                                     4Control joints                                                   315 LMConstruction joints                                        73 LMSaw cut service penetrations                    147 LMConcrete slab pours                                      NumerousPerimeter                                                          147 LMKey Termimesh Personnel                          Drew Wilson- Account Development ManagerShane Waye, Senior EstimatorAnthony Bennett- Operations Field Manager
Sponsored
ABN Group Headquarters car park, Leederville Square

ABN Group Headquarters car park, Leederville Square

Markham Global PTY LTD

ABN Group chose a site in Leederville, WA, for a new state-of-the-art headquarters building. This included a multi-level office, ground floor commercial tenancies, end-of trip facilities, and parking for approximately 160 cars.The project demanded high standards for quality, had a construction time frame of 87 weeks, and was to be five-star Green Star rated.These considerations had an impact on the selection of finish for the car park floors, which is where MARKHAM became involved in the project.AQURON 1000 was selected for enhanced concrete curing, permanent sealing, and deep anti-dust hardening.
Sponsored
Hudson’s Bay

Hudson’s Bay

Boon Edam Australia Pty Ltd

Two high-end department stores Rokin 21 and Rokin 49 are rented by the Canadian Hudson's Bay Company (HBC), making this their Dutch headquarters. Both buildings have a new façade, which has been designed to blend in with their historic location. Authenticity is achieved with 3D curved aluminum façades and curtain walls housing enormous windows. The storefront display windows on the ground floor are 4.5 by 3 meters. A collaboration between Boon Edam and Stackdoor has resulted in an impressively tall entrance through a glass Tourniket original revolving door with a height of 4.3 meters.
Sponsored
Amazon Virginia Headquarters

Amazon Virginia Headquarters

CarbonCure

Amazon HQ2 is part of the Metropolitan Park site, an existingurban renewal and development project in National Landing.The first phase of our “ground-up” construction will see theredevelopment of a block of vacant warehouses into two newLEED Platinum-certified buildings, new retail space for areabusinesses, and plenty of open space for the community toenjoy. These buildings are the first step to creating an urbancampus where Amazon’s future 25,000 employees and thelocal community can live, work and play.Miller & Long delivered an estimated 106,555 cubic yards(81,467 cubic metres) of concrete made with CarbonCure, whichwill save approximately 2,522,000 pounds (1,144 tonnes) of CO2.
Sponsored
Sea Temple Apartments

Sea Temple Apartments

Tremco

About the ProjectSea Temple is unrivalled as THE 5-star resort in Port Douglas. The beautifully manicured grounds, stylish accommodation, world class facilities and spectacular 3000m2 central swimming lagoon, places Sea Temple in another league when compared with other resorts in the region. Sea Temple Luxury Apartments is a collection of 6 stunning 2 and 3 bedroom Swim-out and Penthouse apartments within the Pullman Sea Temple resort complex. The apartments have been selected for their ideal positions within the resort, relaxed atmosphere and unparralled quality facilities set the scene for pure enjoyment.The ChallengeWhen you are working with one of the most prestigious resorts in Port Douglas where the highest quality of facilities, services and experiences are expected, you need to provide unparalled results. Also when your guests are paying a premium price, your solution needs to be low odour so as to not disrupt the experience of paying guests whilst the work is being completed. The harsh North Queensland conditions demand a high quality product strong enough to withstand all types of weathering. So when Sea Temple Apartments discovered a problem with their waterproofing a high quality but aesthetically pleasing solution was the only option.Tremco SolutionWith the contractor previously using liquid membranes, a more robust and durable solution was needed which would also provide the warranty, demanded of a high quality building such as Sea Temple.Having previously completed many other successful projects with Tremco Systems, the applicator had trust in the Tremco solution, and a dual layer of Tremproof Torch 3000 seemed the logical choice for this end high development. The low VOC and odour levels of Tremproof Torch 3000 helped seal the deal in the built up 5 star accommodation to reduce neighbourhood discomfort.
Sponsored
One New Change, London

One New Change, London

SAS International Australia

One New Change features SAS International bespoke metal ceiling panels with an expanded metal mesh, finished in silver, red and black. The ground-breaking, bold and perceptive £300 million One New Change mixed-use development project won the MIPIM AR Future Project Award 2010. Now complete, the building has become known as the ‘Stealth Bomber’ after the radar-proof combat plane that inspired its faceted form and has also won a RIBA 2011 Award for London and LDSA Building Excellence Award. The design incorporates pedestrian arcades converging at the core of the building, reinstating a historic north-south pedestrian route and allowing new panoramas of London’s landmark St Paul’s Cathedral. SAS International supplied the ceiling solution for the retail corridors of the development with a concealed suspension system, working closely with the architects to create a result where no visible fixings can be seen through the ceiling plane. To complement this, bespoke metal ceiling panels were produced with an expanded metal mesh, finished in silver, red and black. A challenging material to work with, to ensure the mesh held a uniform shape and corners for the panels could be formed accurately, SAS International’s solution was to create a ‘picture frame’ behind each panel. This also helped to provide support for the concealed attachment bolts. Design challenges at One New Change included the building grid size and shape (it was termed the most difficult site in Europe), the complex geometry of the structure (including some tight ceiling to structural beam heights), and a shared fire strategy between retail and office storeys. Requirements to achieve an environmentally-friendly building, complying with Part L and BREEAM ratings, were also critical and the design uses a materials palette of limestone, metal, mirror and a new method of fritted glass on the exterior to help shield the interior from glare.
Sponsored
Mother Teresa Catholic College, WA

Mother Teresa Catholic College, WA

Termimesh

Mother Teresa Catholic College, WALocation – Baldivis, Perth, Western Australia      Installation Duration - 3 monthsInstallation Year – 2019                             Project Value - $15-20 millionSpecifying Architects – Parry and Rosenthal Architects TECHNICAL DETAILInstallation Type                                             NumberService penetrations                                     150Cluster penetrations                                      11Control joints                                                   700 LMConcrete slab pours                                       Grid pattern - numerousPerimeter                                                           500 LM  BACKGROUNDMother Teresa Catholic College is a progressive co- educational facility in the fast-growing suburb of Baldivis, 60 kilometres south of Perth in the City of Rockingham.The school opened in 2013 and in 2018/19 a Stage 3 Capital Development Program called for the construction of junior-secondary class-rooms and associated facilities, playing fields, courts, grounds, and extended parking. REQUIREMENTThe College’s ongoing plans for facility enhancements represents a significant investment and is worth protecting with the most effective pre-construction termite management system.The College caters for students from pre-kindergarten to Year 12. Chemical termite controls were not an option because of toxicity issues, making a clean and environmentally safe physical termite barrier the correct solution.APPROACHA typical WA site, the college’s location is predominantly flat, with sandy soils and substrates. In general, this type of environment poses a high risk for termite attack common to this region of Western Australia. SOLUTIONThe main challenge with the installation came from the rammed earth exterior walls. Their natural composition can chip easily, so nailing or sealing the termite barrier onto the wall was not practical.Our solution was to install Termimesh cold joint /paver trays to the perimeter of the concrete slab edge. These protected the concealed entry point between the slab and wall. They also engaged into the external pavement instead of against the rammed earth wall itself.BENEFITSThe Termimesh System which comprises of our 725 grade stainless steel mesh, Termiparge bonding cement and high grade stainless steel clamps not only met their strict requirement of no chemicals it will also continue to provide them with reassurance and peace of mind the comes with our market leading Pledge Guarantee. The Pledge Guarantee provides the client with a 10 year guarantee that requires no annual inspections during that initial period. The client then has the option to extend this on an ongoing basis by having an approved annual inspection.
Sponsored
Burj Khalifa

Burj Khalifa

Boon Edam Australia Pty Ltd

The Burj Khalifa – formerly the Burj Dubai – is a legendary building that can only be described in superlatives. At 828 metres high, it is the tallest building in the world. The Burj Khalifa has 160 floors, more than any building in the world. The building also has the highest floor, the highest façade made of aluminium and glass, the highest nightclub and the highest restaurant, the highest service lift and the lift with the longest travel distance. Finally, the building has the highest positioned revolving doors ever installed in a façade worldwide. In less than 30 years, Dubai has become the leading city in the Middle East and is known for its architectural and technical excellence. The Burj Khalifa has become the symbol of this progress. The Burj Khalifa also takes the title of the highest structure in the world back to the Middle East; the Great Pyramid of Giza used to hold the title 4 millennia ago. International Collaboration The tower was designed by architectural firm Skidmore, Owings & Merril, known for their designs for the Willis Tower (formerly the Sears Tower) and the new One World Trade Center in New York. The three-pronged design is based on the spider lily desert flower and consists of three elements around a central core, with the elements spiralling upwards. It can rightly be called an international project: the construction team consisted of Samsung Engineering & Construction employees from South Korea in collaboration with Besix from Belgium and Arabtec from the United Arab Emirates. The UK consultancy Hyder Consulting was responsible for overseeing construction of the building. In total, companies from more than 30 different countries contributed to the construction of the Burj Khalifa. A Windy Challenge The wind is quite a challenge when building a skyscraper of this size. Without additional measures, the top of the building would move so much from side to side due to the wind that people would become seasick. Dubai is also regularly tested by the shamals: sandstorms that can last for days. As the outer façade of the Burj Khalifa contains an enormous amount of glass, these weather conditions presented a considerable challenge. The three-part design proved to be the solution because the spiral floors break the wind currents around the building, resulting in a stable structure. The World's Highest Revolving Doors Skidmore, Owings & Merril's design includes an observation platform on the 124th floor of the building. Two glass revolving doors provide access to this room. At 442 metres above the ground, these are the highest positioned revolving doors ever installed in the façade of a building. The revolving doors must also be able to withstand an extremely high wind load of at least 3000 Pascal, which corresponds to an F3 class tornado. The Burj Khalifa required two automatic revolving doors with a diameter of 3,000 mm and a total height of 2,700 mm; the cover could only be 300 mm high with the motor installed. Generally speaking, a revolving door with these specifications would only be able to withstand wind loads of up to 689 Pascal. It was clear, then, that not every revolving door manufacturer could supply an entrance that met these requirements. Challenge Accepted Koninklijke Boon Edam was one of only two companies invited to devise a system for this challenge. There were two main problems that had to be solved: the round sides of the revolving door had to be strong enough to resist the wind, and the door set had to be properly fixed so the door wings could not be blown off during a storm. Boon Edam worked closely with Mace, the Hyder Consulting Group, Samsung Engineering and Construction and Turner Construction, the subcontractor, to develop a system that met all these requirements. During the first phase of the process, the second company invited to tender had to give up because their design did not meet the challenging conditions on the 124th floor. Boon Edam persisted in its efforts, and after conducting various wind load and glass tests, it became possible to adapt the construction of the Tourniket to the requirements of the Burj Dubai. A Tornado-Proof Revolving Door at the Burj Khalifa Our proposal for the Burj Khalifa consisted of a Tourniket with specially reinforced door frames twice the width and thickness of a normal revolving door. These were securely anchored with special bolts under the floor to guarantee the structure's rigidity. Although most revolving doors are installed on the top of the subfloor, this door was installed under the top finish layer of the concrete floor. To guarantee the stability of the door set, an extra-thick steel frame was added to the structure. This allows the door wings to easily withstand the wind pressure. Expansion on the 148th Floor in 2014 Boon Edam installed the same specially designed Tourniket revolving door on the 148th floor as on the 124th floor. However, the new project brought an extra challenge: transporting all of the materials from the basement of the building to the 148th floor. First, the materials had to be transported in one lift to the 111th floor. They were then transferred to a second lift, from where everything had to be moved manually from the 149th floor to the 148th floor, to the door's location. Special Projects Based on Standard Solutions The revolving doors we created for the Burj Khalifa were an extreme challenge. The experience and expertise of our technicians combined with the tried and tested technology of the Tourniket enabled us to develop a successful solution. Both revolving doors are now used daily and give visitors a spectacular view of Dubai. The glass design beautifully complements the modern façade of the observation platform and puts Dubai's beautiful skyline in the spotlight.
Sponsored
Monash University

Monash University

Interpon Powder Coatings

Monash University’s Clayton campus was recently awarded three major architecture awards by the Australian Institute of Architects for the second year running.The precinct consists of four new residential buildings with associated retail and informal learning spaces, with each of the buildings having its own individual architectural style.The project includes designs from four different architects including Hayball, Jackson Clements Burrows Architects (JCB), Richard Middleton Architects and McBride Charles Ryan, with master planning from MGS Architects and partners.Central to the design are the powder coated aluminium elements featured across each of the buildings, ranging from sharp blacks and silvers on one building through to bright and exuberant colours on another, driving home the individuality of each designer.Among the award winning designs, the Logan Hall residency, designed by McBride Charles Ryan was recognised by the judges for its excellence in architectural skill and merit of design. Interpon Black Ink was used for the shading devices and window frames, with Interpon Eternal Silver Satin specified for the weather panels above the ground floor retail.“As we were conscious of long term maintenance as well as creating an ongoing pleasing presence, the products used on the project were chosen for their intrinsic beauty and longevity,” says Debbie Ryan of McBride Charles Ryan.“The pattern is intentionally complex. We have used honest and time proven Interpon products which have all come together in a really joyful way through composition.”Having previously worked on the colourful The Icon apartment complex in St Kilda designed by JCB, Interpon’s Specification Expert Gareth Connell understands the importance of tailored palette when vibrancy and colour are central to a project.“We knew the design brief called for a exuberant range of colours for a wide range of building elements and performance of this aesthetic. We knew we’d have a proven high performance finishing solution that would maintain the performance requirements for such a high profile project, which is why Interpon D2525 Super Durable polyester powder coat was specified.”In contrast to the more ‘simple’ colour scheme used for Logan Hall, the Turner Hall building, designed by JCB, is defined by its bright colours, using a rainbow of ten different colours from the Interpon colour palette to create a vibrant and refreshing appearance that has revitalised the University as a whole, traditionally known for its dull brown buildings.A coloured ‘hood’ at the window of each sole occupant studio glows at night, enhancing the colour spectrum. Custom colours from the Interpon Ultriva™ collection were used for aluminium elements including extrusions, sheets, flashings, cladding, trims and fins.The complexities of the ambitious project required careful consideration and planning between the architects and powder coating supplier. The vibrant design brief lent itself to Interpon’s unique small batching facilities in Sunshine, Melbourne, that cater for such striking colour schemes in a cost effective and timely manner.Throughout the project, specialists from Interpon Powder Coatings worked closely with the multiple architectural teams involved in the project to ensure the perfect colour palette was developed for the best results both in individual building design and the project as a whole.In specifying the Interpon D2525 series, the designers were ensured significantly higher gloss retention and resistance to colour change along with maximum film integrity guaranteeing long term cosmetic and functional protection. Interpon D2525 offers 25 year film integrity and gloss retention with 15 year colour retention and chalking resistance.The Interpon D2525 range exceeds American Architectural Manufacturers Association Standards for High Performance Organic Coatings on Aluminium Extrusions and Panels as well as exceeding the performance criteria of AS 3715 Metal finishing – Thermoset powder coating for architectural applications of aluminium
Sponsored
Townsville Hospital, QLD

Townsville Hospital, QLD

Rondo Building Services Pty Ltd

Rondo has so far provided over 10,000lm of various wall and ceiling systems, including Rondo Steel Stud Drywall Framing System, KEY-LOCK Suspended Ceiling System and DUO Exposed Grid Ceiling System. More complicated designs arose when it was discovered that the high cyclonic winds would affect the facade of the building.
Sponsored
EasyMech MR (purlin mount platform): Mixed-use Project, NSW

EasyMech MR (purlin mount platform): Mixed-use Project, NSW

Con-form Group

his project saw a number of our systems installed including six of our EasyMech MR platforms in varying sizes, ScreentoRoof MR system, ClassicScreen Walls and our Acoustic+ screen wall system.We consulted with the team from design to install to ensure a smooth and seamless experience.For more information on our systems, contact our Customer Care Team today.
Sponsored
Ivanhoe Apartments

Ivanhoe Apartments

Sculptform

Ivanhoe’s newest building is a landmark you can’t miss. The facade components of light bricks, dark cladding and luminous aluminium Click-on Battens perfectly complement each other, creating a contemporary finish. The interior also features our battens, which seamlessly connects to the exterior. The building comprises a three-level basement, ground floor retail outlets, two levels of offices and multiple fully appointed apartments among the two upper levels. The building is bordered on three sides by busy public roads which posed logistical challenges with its construction. However, the speed and ease of installing Click-on Battens alleviated this issue on the upper levels. The curved facade is wrapped in Sculptform aluminium Click-on Battens. They were installed upon standard and curved tracks which were delivered to site in a flexible state so that they’re able to be wrapped around the substrate and hug the exterior. Batten clips are factory fixed to the tracks at the spacing sequence that is specified. Helping to save time installing on-site. Battens are simply push-clicked onto mounting tracks that are positioned behind the battens in a concealed manner.
Sponsored
Skycity Casino & Hotel, SA

Skycity Casino & Hotel, SA

Rondo Building Services Pty Ltd

The KEYLOCK Concealed Suspended Ceiling System, Steel Stud and Track Wall Framing System, and XPRESS Drywall Grid Ceiling System have been integrated throughout the project. Rondo’s long-term relationship with Ceiling & Wall Contractors enables the project to run smoothly and the onsite coordination is exemplary.
Sponsored
Parramatta Square, NSW

Parramatta Square, NSW

Rondo Building Services Pty Ltd

Rondo provided a range of market leading wall and ceiling systems for both buildings 3 and 4. Our KEYLOCK Concealed Suspended Ceiling System and Steel Stud and Track Wall Framing System were used for the internal fit out, completed by AUSTRAL Interiors. SMTM Projects used our 1.15 BMT Stud and Track with top hats.
Sponsored
Royal Hobart Hospital, TAS

Royal Hobart Hospital, TAS

Rondo Building Services Pty Ltd

As the project was located in Hobart, it required the project team including Rondo to work together to be organised and keep a clear path of communication. This resulted in the full specification being completed early in the process, the specification included Rondo Wall Stud, KEY LOCK Ceiling Systems, DUO Ceiling Systems, External Soffit Systems and our extensive knowledge on seismic design.
Sponsored
Old Treasury Building, WA

Old Treasury Building, WA

Rondo Building Services Pty Ltd

The entire building also featured ceilings acoustically isolated from the old structure where heavy duty isolators were required to be incorporated into the Rondo KEY-LOCK Concealed Suspension System. Similarly Rondo had to design a supplementary suspension system beneath these ceilings to accept a secondary system to support some services and particularly architectural feature ceiling beneath.

Showing 1-36 of 58

Feedback