NBS Source
I'm a manufacturer

"北京西城区资源(上门服务)[威信:█192-1818-9072█】提供上门服务快速选照片快速安排不收定金面到付款30分钟可到达-(snsm12332)💯YRbS"

124 results found

Sort by:

Showing 1-13 of 13

Sponsored
Span+ (rafter-mounted platform): Multi-level Shopping Complex, ACT

Span+ (rafter-mounted platform): Multi-level Shopping Complex, ACT

Con-form Group

THE CHALLENGE: House 30+ new HVAC&R mechanical plant equipment and vents. Retrofitted to the roof of a large, multi-level shopping centre without interrupting regular retail operations.THE SOLUTION: We supplied over 30 EasyMech MR (purlin mount) and Span+ (rafter mount), HVACR platforms in Kit form.Our Span+ (rafter-mount) system, was designed to be 100% penetration-free and installed on the surface of the roof over the rafters.We also supplied walkways, up & overs, and ladders – all in Kit form! Providing savings in cost and time.
Sponsored
Kodo Apartments, Adelaide SA

Kodo Apartments, Adelaide SA

Alspec

This 30-storey new apartment building with panoramic views from brightly coloured balconies is the latest addition to Adelaide’s growing city skyline.
Sponsored
Uno Apartments, Adelaide, SA

Uno Apartments, Adelaide, SA

Caroma

This innovative, multi-level residential building in central Adelaide is fitted with water and energy efficient fixtures and fittings by GWA Bathrooms & Kitchens, in partnership with DFC/Housing. Located at 102 Waymouth Street, the building consists of 146 apartments for Housing SA and 30 youth service apartments.
Sponsored
Latitude On Leighton, WA

Latitude On Leighton, WA

Rondo Building Services Pty Ltd

The project recently won Best Multi-Unit Development at the Master Builders-Bankwest Excellence in Construction Awards. This is a great achievement, especially considering that when Rondo were approached by contractor, Metrex, to assist with Latitude’s wall and ceiling design, it was only 70% design ready leaving Rondo the task to finish the remaining 30% requirements.
Sponsored
Burj Khalifa, Dubai

Burj Khalifa, Dubai

Rondo Building Services Pty Ltd

Construction started on Burj Khalifa in 2004 before the building was officially opened in January 2010, although ceiling systems are still being supplied to the office areas on level 160. At the peak of construction, over 12,000 workers were onsite every day from 30 contracting companies, representing more than 100 different nationalities.
Sponsored
Upper Yarra Secondary College

Upper Yarra Secondary College

BRITEX Metal Products

Britex are proud to be involved in another successful VSBA School Upgrade Project at Upper Yarra Secondary College in Yarra Junction, Victoria. The completion of Stage One of the College’s Upgrade and Modernisation Project saw the inclusion of almost 30 Grade 316 SS Acid Resistant Britex Laboratory Bowls for their state of the art science and technology facilities throughout. A floor mounted 3.5m Vandal Resistant Sanistep Urinal was also installed in the Male Bathrooms complete with Smart Saniflush Sensor Flushing System, a water efficient and hygienic choice ideal for education projects.
Sponsored
Uni of Queensland Emmanual College

Uni of Queensland Emmanual College

RBA Group

The Uni of Queensland Emmanual College features the following RBA products:The 2011 Brisbane floods initiated the refurbishment of parts of University of Queensland’s Emmanuel College and created an opportunity to upgrade student amenities. The Facilities Managers decided to control water usage by using RBA’s Time-Trol shower controller. At the same time, they chose to replace out-dated twin element ‘boiler’ water heaters with instantaneous gas. The results were astonishing. “The university estimates it is now saving $60-$70K per year in water and energy savings.”The Time-Trol Shower unit allows maintenance staff to nominate run-time and lock-out parameters. These can be selected from, and changed to, any one of 12 options. No special coding required, just the flick of a dial by staff. It was ultimately decided to offer students a 5 minutes shower with a 30 second lockout. According to university staff ‘…the students have adapted to the usage restrictions seamlessly. There hasn’t been a complaint uttered…’
Sponsored
Universal Store Driving Sustainability - Industrial market Segment

Universal Store Driving Sustainability - Industrial market Segment

HOLCIM (AUSTRALIA) PTY LTD

How does it work?ECOPact uses alternative materials to reduce the environmental footprint of the concrete mix.ECOPact alone reduces embodied carbon emissions by 30-60% without the use of offsetsSimilar technical qualities of conventional concreteECOPact zero goes one step further buy offsetting the residual emissions of ECOPact concrete to achieve 100 emissions reduction.The issueThe built environment is responsible for 39% of global energy-related emissions. Over a quarter of these emissions arise from running existing buildings, whilst 11% is attributable to the embodied emissions from the construction of new buildings. Did you know – concrete is the most widely used building material in the world? The production of concrete is highly energy intensive and generates significant emissions.Business GrowthAs we continue to grow and expand our store footprint nationally, in 2022 we are building a new home for Universal Store. Our objective is to accelerate our journey to a sustainable future, so we have made it a priority to integrate environmentally sustainable features in the design of this exciting new project. This also entails considering the climate impacts of this project. EcoPact - Zero ConcreteWe will need tons of concrete and other materials for the structure of our new Universal Store home. But the good news is that some pioneers are investing in research and development to deliver carbon neutral concrete.We are working closely with our construction partners - developer TradeCoast Central, and builder McNab to deliver a sustainable building. The Universal Store new purpose-built facility will make use of carbon neutral concrete supplied locally by Holcim. Their EcoPact concrete can be made carbon neutral by compensating for residual carbon emissions. In fact this product is so much better for the planet, it has just won the Best of the Best 2021 Sustainability Awards from Architecture and Design.We chose this product to achieve the following benefits:·Conserve natural resources - the product uses alternative materials (fly ash, blast furnace slag or silica fume) instead of virgin raw materials (mainly limestone and silica). ·Reduce the carbon footprint of the project - this product achieves a reduction of 30-100% of embodied emissions related to concrete usage in comparison to standard concrete. ·Use our influence and leadership to support the transition to a low carbon economy·Demonstrate that a sustainable future is within reach.
Sponsored
Hotel Jakarta, Amsterdam

Hotel Jakarta, Amsterdam

Boon Edam Australia Pty Ltd

Imagine waking up in this 4-star luxury hotel with panoramic view of the IJ and the city of Amsterdam. Hotel Jakarta: a BREEAM Excellent certified energy-neutral hotel in Amsterdam. Designed with sustainability in mind. Unique for the Netherlands is the 30-meter-high timber structure of the hotel. All columns, ceilings and frames are made from natural, FSC or PEFC certified wood. The south and east façades are covered with 700 m2 of building-integrated solar energy panels (BIPV panels). The glass roof that covers the atrium also contains BIPV cells that, in addition to collecting energy, also function as sun blinds for the subtropical inner garden. The atrium is the center of the hotel and works as a temperature controller in both summer and winter. On each side of the building, rooms have their own covered outdoor space that functions as a structural awning. A custom made revolving door provides access to the hotel where there is a dynamic public area with various bars, restaurants, coffee corners and a wellness center. This transparent revolving door is almost 6 meters high and fits perfectly with the appearance of the facade. In addition, this type of entrance solution is in line with the sustainability requirements of the building.
Sponsored
One Microsoft Place, Ireland

One Microsoft Place, Ireland

SAS International Australia

International technology firm Microsoft have recently moved into their brand-new office located in Leopardstown. SAS International designed and manufactured a range of metal ceilings and bespoke metalwork installed in the multi award-winning innovation hub. This modern office signifies the celebration of an extensive 30-year history Microsoft share with Ireland. SAS500 linear baffles were supplied in either RAL 9016 (Black) or in a pre-coat timber effect to enhance the natural, organic character of this project. Installed in the main office areas, galvanised SAS130 T-Grid in RAL 9016 was chosen for its industrial demeanour and sharp appearance. SAS330 C-Profiles have also been supplied in a pre-coat timber effect, achieving the popular timber natural impression while still providing the longevity and benefits of metal. Installed in a unique triangular grid pattern, this ceiling adheres to the contemporary aesthetic of an exposed ceiling. The new building has been designed with the 2,000 Microsoft employees needs in mind creating large open spaces with the aim to promote engagement amongst colleagues. SAS International achieved the artistic vision of RKD architects through the collaboration with BAM and Platt & Reilly.
Sponsored
Manly Beach Below Grade Project

Manly Beach Below Grade Project

Tremco

About the ProjectThis Child Health and Learning facility in Manly, deliversspecialist child healthcare for up to 15,000 families a yearfrom rural, regional and remote New South Wales andbeyond.The new facility will integrate a state-of-the-art child schooland health service that will accommodate regional childrenand families nationwide.This six storey building includes school classrooms,consultant and observation rooms, a paediatric oral healthunit with a dental and orthodontics room, ophthalmology,occupational therapy, sensory rooms and a telecare centre.ChallengeOver 80% of construction litigation and defect claims are a result of water ingress, of that 80%, almost 30% of those are below grade issues. (City Futures Research Centre UNSW).The two biggest waterproofing challenges for this build were:1) Below Grade - Non structural Blinding Slab, 4 metres below sea level and less then 50 metres from Manly Beach. This build had decanters pumping over 1.3 million litres of water per day awayfrom the site during the construction phase.2) The creation of a waterproofing solution which would not fail if the membrane was penetrated, be it in the pre or post construction phase.Due to the proximity to the beach and the build having a raft slab in the basement, a standard cookie cutter below-grade waterproofing solution was not an option for this build.Tremco SolutionTremco were asked to provide a solution for this complex build. The biggest and most demanding waterproofing areas within the build that needed attention were:1) Below Grade - 50 metres from the ocean and 4 metres below sea level, we needed a reliable waterproofing solution, that would also be robust enough to withstand any punishment tradesdelivered post installation, we recommended and used Paraseal SW (Saltwater). Paraseal SW is a multi-layer sheet membrane waterproofing system consisting of a self-sealing, expandable layer of bentonite laminated to an impermeable, high density polyethylene (HDPE).2) iAuditor reporting- iAuditor is an onsite quality assurance program Tremco conduct for the builder and applicator to ensure our products are being installed correctly and to specification. This gives the builder the confidence that there will be no waterproofing defects within the build.Overall, both the builder and developer were happy with the end result, which provided the warranty and quality required of such a development.
Sponsored
Burj Khalifa

Burj Khalifa

Boon Edam Australia Pty Ltd

The Burj Khalifa – formerly the Burj Dubai – is a legendary building that can only be described in superlatives. At 828 metres high, it is the tallest building in the world. The Burj Khalifa has 160 floors, more than any building in the world. The building also has the highest floor, the highest façade made of aluminium and glass, the highest nightclub and the highest restaurant, the highest service lift and the lift with the longest travel distance. Finally, the building has the highest positioned revolving doors ever installed in a façade worldwide. In less than 30 years, Dubai has become the leading city in the Middle East and is known for its architectural and technical excellence. The Burj Khalifa has become the symbol of this progress. The Burj Khalifa also takes the title of the highest structure in the world back to the Middle East; the Great Pyramid of Giza used to hold the title 4 millennia ago. International Collaboration The tower was designed by architectural firm Skidmore, Owings & Merril, known for their designs for the Willis Tower (formerly the Sears Tower) and the new One World Trade Center in New York. The three-pronged design is based on the spider lily desert flower and consists of three elements around a central core, with the elements spiralling upwards. It can rightly be called an international project: the construction team consisted of Samsung Engineering & Construction employees from South Korea in collaboration with Besix from Belgium and Arabtec from the United Arab Emirates. The UK consultancy Hyder Consulting was responsible for overseeing construction of the building. In total, companies from more than 30 different countries contributed to the construction of the Burj Khalifa. A Windy Challenge The wind is quite a challenge when building a skyscraper of this size. Without additional measures, the top of the building would move so much from side to side due to the wind that people would become seasick. Dubai is also regularly tested by the shamals: sandstorms that can last for days. As the outer façade of the Burj Khalifa contains an enormous amount of glass, these weather conditions presented a considerable challenge. The three-part design proved to be the solution because the spiral floors break the wind currents around the building, resulting in a stable structure. The World's Highest Revolving Doors Skidmore, Owings & Merril's design includes an observation platform on the 124th floor of the building. Two glass revolving doors provide access to this room. At 442 metres above the ground, these are the highest positioned revolving doors ever installed in the façade of a building. The revolving doors must also be able to withstand an extremely high wind load of at least 3000 Pascal, which corresponds to an F3 class tornado. The Burj Khalifa required two automatic revolving doors with a diameter of 3,000 mm and a total height of 2,700 mm; the cover could only be 300 mm high with the motor installed. Generally speaking, a revolving door with these specifications would only be able to withstand wind loads of up to 689 Pascal. It was clear, then, that not every revolving door manufacturer could supply an entrance that met these requirements. Challenge Accepted Koninklijke Boon Edam was one of only two companies invited to devise a system for this challenge. There were two main problems that had to be solved: the round sides of the revolving door had to be strong enough to resist the wind, and the door set had to be properly fixed so the door wings could not be blown off during a storm. Boon Edam worked closely with Mace, the Hyder Consulting Group, Samsung Engineering and Construction and Turner Construction, the subcontractor, to develop a system that met all these requirements. During the first phase of the process, the second company invited to tender had to give up because their design did not meet the challenging conditions on the 124th floor. Boon Edam persisted in its efforts, and after conducting various wind load and glass tests, it became possible to adapt the construction of the Tourniket to the requirements of the Burj Dubai. A Tornado-Proof Revolving Door at the Burj Khalifa Our proposal for the Burj Khalifa consisted of a Tourniket with specially reinforced door frames twice the width and thickness of a normal revolving door. These were securely anchored with special bolts under the floor to guarantee the structure's rigidity. Although most revolving doors are installed on the top of the subfloor, this door was installed under the top finish layer of the concrete floor. To guarantee the stability of the door set, an extra-thick steel frame was added to the structure. This allows the door wings to easily withstand the wind pressure. Expansion on the 148th Floor in 2014 Boon Edam installed the same specially designed Tourniket revolving door on the 148th floor as on the 124th floor. However, the new project brought an extra challenge: transporting all of the materials from the basement of the building to the 148th floor. First, the materials had to be transported in one lift to the 111th floor. They were then transferred to a second lift, from where everything had to be moved manually from the 149th floor to the 148th floor, to the door's location. Special Projects Based on Standard Solutions The revolving doors we created for the Burj Khalifa were an extreme challenge. The experience and expertise of our technicians combined with the tried and tested technology of the Tourniket enabled us to develop a successful solution. Both revolving doors are now used daily and give visitors a spectacular view of Dubai. The glass design beautifully complements the modern façade of the observation platform and puts Dubai's beautiful skyline in the spotlight.
Sponsored
The Icon - St Kilda

The Icon - St Kilda

Interpon Powder Coatings

A bold and significant new development has emerged in St Kilda as a ‘liveable Lego tower’, rising in tiered rainbow cubes that appear to balance like building blocks. Aptly named The Icon, the distinctive new building is wrapped in expanded aluminium mesh that changes colour as sunlight moves.The inspiration of artist Matthew Johnson, who worked with Jackson Clements Burrows Architects to conceptualise the distinctive complex, was achieved with Interpon Powder Coating on board as a collaborative partner.“My vision for the project was for people look up and see something interesting, to see something that is in a sense iconographic – as a marker or reference point,” explains Matthew.Interpon were involved with the project “right from the start”, explains Gareth Connell, Regional Specification, Interpon. Their association began after they were introduced to Pace Developments to discuss colour and product selection for the external façade.“We work closely with Interpon, and Pace asked us to quote with the product already powder coated,” says Ian Dunstan, southern regional sales manager at Locker Group, who manufacture perforated and expanded metal. Interpon were able to step in and develop the colour range separately, to meet the design brief and provide an ultra-durable coating system that meet the expectations of all parties.“The team at Interpon were very accommodating, engaged and professional in taking the concept on board,” says Matthew. “We were able to manifest unique colours based on the ratios I created with their chemist, inventing a whole new series of colours. This was crucial, as each level is depicted in different colour hue variations from earth to sky, which cross reference the nature of the geographical and environmental stratums. This flux of seasonal change is portrayed through subtle tonal gradation. Working with Interpon was a very fluid operation.”Interpon has collaborated on several high profile property developments and high rises over the years – although perhaps none quite as unique or with as many distinct characteristics as The Icon. “The nature of expanded aluminium mesh is such that it is formed by shearing and expanding aluminium sheet to create the ‘3D form’ effect. A visually appealing system for a façade, the shearing of the metal can present issues with very sharp edges, particularly in aggressive coastal environments,” Gareth explains.“Part of understanding this project was to comprehend as many elements as possible. Given the location was in St Kilda, with the bay just over 1.5km away, environmental considerations such as UV degradation, exposure to corrosive sea salts and prevailing winds needed to be considered.”After reviewing available data, such as Bureau of Meteorology weather patterns and local geography and topography maps, a specific duplex or two-layer powder finishing system was specified.“This consisted of a controlled preparation process for the expanded aluminium sheets. An epoxy barrier primer (was specified) to provide enhanced protection and to build the sharp edges in order to minimise issues associated with filiform corrosion. And the ultra-durability polyester powder top coat was developed in 34 distinct colours,” Gareth says.After the colour range was developed, it was applied by powder coating specialists Mansutti Bros. Lead by managing director Claude Mansutti, the team refinished hundreds of mesh panels over a period of nine months.“It was a major benefit to be using powder coating because, unlike liquid paints, powder is cured once it comes out of the oven and it’s ready to go once it’s cooled down. If they were painted, the drying phase could delay the process from refinish to installation by up to two weeks. It meant we were able to keep to a very strict schedule,” Claude says.“The project involved a lot of large spreadsheet work. There were 17 floors and over 30 colours, with panels in 15 sizes; it was quite a matrix to work with. But the end result is so different and so unique. It’s an interesting design and I’m sure it’s going to be a talking point for the area for many years.”

Showing 1-13 of 13

Feedback