NBS Source
I'm a manufacturer

"electrical systems"

645 results found

Sort by:

Showing 109-121 of 121

Sponsored
ABC Melbourne Office, VIC

ABC Melbourne Office, VIC

Capral Aluminium

The ABC project in Melbourne’s Southbank precinct represents a bold union of the national broadcaster’s multiple aims and responsibilities. With its bold style, internal and external openness and highly innovative use of technology, the ABC’s Victorian headquarters embodies socially responsible design. The central design theme of transparency is perfectly suited to the Capral curtain wall, window and door systems throughout. The building, which designer Cox Architecture characterise as fostering a ‘dynamic, integrated and visually transparent environment which promotes interaction across program teams’, also invites ‘greater public interest and participation’.
Sponsored
RMIT Swanston Street Campus, VIC

RMIT Swanston Street Campus, VIC

Rondo Building Services Pty Ltd

Expoconti and Rondo, along with the project architects, Lysons Architects and builder, Brookfield Multiplex, combined their expertise to ensure the design and construction of the RMIT Swanston Academic Building (SAB) offers a higher quality and innovative learning experience for students. To achieve this, the newly launched Rondo MAXIframe External Wall Framing System was specified, with Rondo MAXIjamb designed for installation around door jambs and internal window openings. This meant Expoconti could save time on site as MAXIjamb replaces the necessity for multiple stud configurations, as well as offering greater performance capacities than traditional wall stud framing.
Sponsored
Rosewood Aged Care

Rosewood Aged Care

Markham Global PTY LTD

There were two sets of challenges involved in the Rosewood Aged Care.Firstly, waterproofing the basement. The basement was excavated around a heritage-listed building, which had to stay undamaged for the duration of the works. Piles and shotcrete were implemented for the construction, but there was no scope to install a membrane due to space and other limitations. The Markham BASE-TECT system was ideal for this situation.Second were the requirements for moisture control and permanent hygiene protection for the interior floor slabs of the residential parts of the building. This is a more routine challenge, faced by aged care facilities with concrete floor slabs. AQURON 2000 MEDI+ was selected for concrete curing enhancement and permanent hygiene sealing.
Sponsored
Deakin University - Waterfront Student Accommodation

Deakin University - Waterfront Student Accommodation

ECOCLEAN

COLLABORATIONArchitect: ThomsonAdsett in collaboration with nettletontribeBuilder: L.U.SimonDeveloper: Deakin UniversityBRIEFThe Waterfront campus for Deakin University at Geelong celebrates the “individual” student through the prominent white precast concrete. The client on this project wanted to ensure that over time the white concrete stayed pristine – looking as good as new – without expensive cleaning and maintenance costs.MATERIAL & APPLICATIONECOCLEAN Porosity SealerECOCLEAN Self-Cleaning CoatingOUTCOMEOur ECOCLEAN Self-Cleaning system has been applied to the concrete to preserve the appearance of this building’s prominent facade. This significantly reduces cleaning and maintenance costs making this a cost-effective and net positive environmental solution.
Sponsored
Prima Pearl Apartments, VIC

Prima Pearl Apartments, VIC

Rondo Building Services Pty Ltd

Rondo has delivered exceptional expertise and technical assistance during the design and construction of Melbourne’s Prima Pearl, residential skyscraper. This prestigious 667 apartment landmark boasts unparalleled amenities across 72 levels, some of which include a private cinema, virtual golf driving range and Level 67 Sky Lounge. By assisting Brookfield Multiplex Constructions’ architects at the design stage, Rondo has ensured our products are readily accessible on site, resulting in less design enquiries during construction. Rondo will be supplying the project with Stud and Track in 64mm, 76mm and 92mm sizes, KEY-LOCK Concealed Suspended Ceiling System and PANTHER Access Panels.
Sponsored
Dublin Airport

Dublin Airport

SAS International Australia

SAS International designed and manufactured a range of solutions for the new 75,000 square metres Terminal 2 at Dublin Airport, Ireland. According to Dublin Airport the new second terminal will be capable of comfortably handling up to 15 million passengers per year. Specification demanded that durability, ease of maintenance and acoustics were considered. SAS International worked with architects Pascall + Watson to design the ceiling solution answering the architect’s brief to factor in ongoing maintenance conducted by Facilities Management teams in the future. The design of these large sized ceiling panels required careful consideration at design stage to ensure they would be manageable when working at a height. Designed and developed specifically for Dublin Airport was 35,000 square metres of ceiling systems, installed in the main departure area, walkways and baggage handling areas. This solution looks like any other suspended metal ceiling system as it provides an aesthetically pleasing flush finish. But where this product differs is its ingenious way of allowing access to the ceiling void and services for ongoing essential maintenance. This is of particular benefit in high traffic areas such as Dublin airport as it enables a corridor to remain in use rather than having to close off the entire route. SAS International manufactured the 20,000m2 of large aluminium frames for the fabric ceilings which creates a striking central feature. Working closely with SAS International were local installers Platt and Reilly who applied the stretched fabric to the frames on-site and hoisted them into position. Creating a comfortable environment for traveller and worker was helped with the use of acoustic floating rafts and perforated metal ceiling solutions (with integrated acoustic pads) to provide the necessary acoustic control for this project. Lighting was suspended neatly between the rafts to also provide a modern finish to the corridors. In addition Perimeter heating and air handling grilles also enhance the experience.
Sponsored
Margaret Whitlam Grandstand – Waverly Oval

Margaret Whitlam Grandstand – Waverly Oval

Tremco

​About the ProjectThe sporting history of Waverly Oval dates from the 1880s when the Waverley Cricket Club gained approval to construct a pitch. Football codes also began using the park at this time. In 1890, the oval was created, and in 1898 the Waverley District Baseball club was founded at the oval.The first pavilion was built by the Waverley Cricket Club in the 1890s and Council built a second pavilion in 1908 with expanded facilities for the benefit of the cricketers and the public. This Pavilion was replaced in 1939 with an Inter War Functionalist style building. In April 2012 the new Waverley Park Pavilion was named the Margaret Whitlam Recreation Centre, in honour of the long association the late Margaret Whitlam (AO) had with the Waverley area. The pavilion was chosen because of its civic, community and recreational facilities incorporating several important aspects of Margaret Whitlam’s life.ProblemRemediation of the pedestrian areas of Margaret Whitlam Grandstand was completed 5 years ago but unfortunately was not successful due to product failure (not Tremco). Council contacted Tremco to provide an acceptable solution with the requirements that the new system needed to come with a 15 year warranty.The challenge of this project was not the 15 year warranty period, but the need for a low odour solution due to the area being in a Public/Government venue. Not all membranes have Low VOC properties.SolutionTremco recommended Vulkem 350/951NF/951NF for the job, which is not only low odour but also offers a 15 year warranty period as required from the council. Tremco offering onsite support throughout the project gave the council confidence in our product.Vulkem 350/951NF/951NF, is a composite waterproofing system comprised of tough-curing liquid polyurethane. It cures to form a durable rubber membrane surface that provides a lasting and easy-to-clean waterproof and trafficable coating. Textured surfaces for traffic will use an aggregate-laden top membrane to aid in wear and slip resistance.
Sponsored
Columbia College, USA.

Columbia College, USA.

Boon Edam Australia Pty Ltd

The new Student Center at Columbia College Chicago, located at 754 South Wabash Avenue in Chicago, opened its doors in the fall of 2019. This brand-new building offers five spectacular stories of spaces for students including music and film-screening rooms, dining options, a fitness centre, a reflection room for meditation and prayer, and event spaces for meetings, performances, and receptions. Columbia College Chicago has a closed campus. In order to enter any building on campus students and staff must have a Columbia ID or visitors must have a valid appointment. The main entrance at the Student Centre is the Tourniket manual revolving door that leads to a public foyer that includes a coffee shop and lounge. Since the speed gates are just past the security desk at the boundary of this area, they serve as a visual and physical indicator of where the public area terminates. Next to the Speedlane Open speed gates, which are notable because they do not have any closing barriers, guards watch as people pass through them to ensure that everyone is scanning their IDs and that the IDs are valid, in which case the speed gate shows a green light. In a situation where a red light shows and the gate alarms, the guard will check the person’s credentials and can try to troubleshoot the ID card. “The decision was really about what creates the least barrier to those entering and exiting the building,” said Dutil. “We don't really want our students to feel like they are overly policed or that our buildings are not accessible to them. So the design of the Open speed gates provided the best solution in terms of controlling access without being obtrusive." Swift Passage While Maintaining Accountability Before the Student Center was built, students entering any campus building would just show their ID to the security officer as they walked past. The administration realised that while this does provide some level of security, it is not foolproof – particularly when many people are entering at the same time for a class. The College’s head of security made the suggestion to install a system that would allow for swift passage of authorised people while maintaining accountability around who enters and exits the building. As anticipated, there was a brief learning curve for the students using the new system. “This was the first system like this on our campus,” said Dutil. “And the first few days that the new Centre was open were also the first few days of school. There were a lot of people new to the campus who required a bit of coaching from guards and our student staff in terms of where to place your card, and to not walk through before you place your card.” Coming Out Ahead of Swinging Doors Dutil confirms that the access systems placed at Boon Edam speed gates are actually outperforming those placed at swing doors across the campus for convenience and adoption. Across the campus, there is a card reader at every swing door entrance of a building where you present your card and a light turns red or green. But oftentimes the card reader is missed, or depending on the placement of the lights and placement of the guard, it can be kind of hit or miss with students walking right by it. “But with the Open speed gates, they're very visible and although they're not a total barrier to entry, they are something that's right in front of you. Because it's very noticable and not easily overlooked, the students have learned pretty quickly to get their ID out. In fact, this was meant to be a test run for the campus to ensure it would be viable and worthwhile for other buildings as well.” Advanced Features Add Value and Flexibility The speed gates have delivered additional benefits beyond basic campus security, according to Dutil. “One of the nice things about a system like this is that we can count visitors to the Student Centre because we get the data of everybody that scans in. So on a busy day for us it's about 2500 people throughout the day. That can range depending on what's going on and what time of year it is. On weekends we're very slow, since there are no classes – maybe 900 to 1200.” “We are a rental venue as well, so we have times where the building is open to non-Columbia College Chicago people for events or other functions. There's a really convenient touch panel right at the security desk called the BoonTouch, where the officer can turn off the turnstiles during those times and then attendees can move through freely without any alarms going off at all.” A New Revolving Door Adds Comfort and Peace of Mind Finally, the Tourniket manual revolving door delivers one additional benefit to the Student Centre, located in a city known for harsh weather. “Revolving doors are always preferred at a building like this that gets a lot of traffic going in and out. We have cold, drafty weather that blows right into our main space at that first floor entry. The revolving door helps to keep the building warm and saves energy and utility costs as well,” said Dutil. “Students feel safe and comfortable entering the building at night,” he concludes. “Our building has a lot of nooks and crannies, and someone can end up alone in a space. And so I think knowing that the only people that are in that building are the ones that are supposed to be there is helpful. Overall, our students appreciate the effort to try to keep them safer.”
Sponsored
DNV GL Energy Office

DNV GL Energy Office

Boon Edam Australia Pty Ltd

TenneT's former head office at the Arnhems Buiten business park has been renovated and converted into one of the most sustainable office buildings in the Netherlands. It is now the head office of DNV GL's energy branch, which employs 2,500 energy experts worldwide. It is DNV GL's largest office building in the Netherlands. The site accommodates about 400 DNV GL employees and covers about 10,000 m2 of office and lab space. The building has achieved an A energy label thanks to innovations such as the use of seasonal thermal energy storage, solar panels, HR +++ glass and a highly efficient heating and cooling system. Boon Edam installed a sliding door at the main entrance, and three Speedlane Slide access gates and two Winglock 900 swing barrier gates in the central hall behind the main entrance to prevent unauthorised entry.
Sponsored
West Side Place - Stage 1, Towers 1 & 2

West Side Place - Stage 1, Towers 1 & 2

Bostik Australia Pty Ltd

At Bostik, innovation comes in many forms.Ultraset® 3 in 1 is Bostik Australia's premium timber floor adhesive incorporating Thickness Control™ Spacer Technology, a proprietary feature consisting of recycled, ground-up car tyres mixed throughout the adhesive.When applied, the Thickness Control™ Spacers act like tiny rubber pillars, suspending the timber and maintaining optimal adhesive thickness to ensure superior performance as a moisture and impact sound reduction membrane.For West Side Place, Ultraset® 3 in 1 presented significant time and cost savings vs conventional multi-layer acoustic systems by eliminating the need to install a separate moisture barrier, acoustic underlay and additional layers of adhesive. Efficiencies that flowed directly onto the construction team, supporting trades and ultimately the developer, delivering a high performance solution within budget, ahead of schedule all the while guaranteeing a compliant and comfortable environment.
Sponsored
Folia Apartments.

Folia Apartments.

Sculptform

The word Folia in Greek means nest, and this is precisely what Folia apartments by Mirvac have delivered. Foliage adorns the many balconies, rooftop conservatory and kitchen garden, contributing greatly to the tranquil ambience which feels wholeheartedly organic. The residences are an inviting place to call home for their new occupants. Able to be seen from below are the prominent soffits on floors 5 and 6, lined with our aluminium Click-on Cladding in a strikingly realistic Blackbutt wood finish. The wood finish on the cladding appears abundantly realistic, cleverly achieving the look of real timber in both tone and texture. Our wood finish wrapping is produced in Japan using a state of the art system to ensure that there is no repetitive wood grain pattern present, helping it to achieve the aesthetic variation of real timber. It also features an embossed texture further replicating that of real timber along with the shadow lines which imitate traditional timber cladding.
Sponsored
Cork County Council Office, Cork

Cork County Council Office, Cork

SAS International Australia

SAS International provided an unusual feature perforation to a metal ceiling solution for Cork County Council’s redevelopment of their MOT office. The refurbishment of Cork County Council has created an outstanding open plan office for their upgraded MOT Office. Included in the redevelopment is the installation of 240 meters squared of acoustic SAS500, with a unique OB50 perforation, installed within the open plan office, meeting rooms and cellular offices. Conserving the original architectural features was significant when embarking on the reconstruction of the building. SAS500 was chosen to accommodate the spacing of existing structural beams, the system hung on secondary grids to adhere to specific architectural requirements. To adhere to the recent popularity in open soffit trends, SAS500 offers a solution in addition to providing acoustic absorption. A unique OB50 perforation was specified in the design of the baffles for this project. SAS International worked in collaboration with Cork County Council Architects and CField Construction to provide bespoke design solutions for this project.
Sponsored
Polaris Data Centre

Polaris Data Centre

Construction Specialties

To protect the priceless infrastructure and mission-critical IT information in Australia’s first custom built, high-tech data centre, Polaris, Project Manager Thiess turned to the leading manufacturer of specialist building products, Construction Specialties.Integral to the $121 million construction was the regulation of airflow to safeguard the computer hardware; Construction Specialties’ customised performance louvres were the only product in Australia able to meet this construction challenge.Boasting 14,000m2 of floor space on 5 storeys with 7000m2 of raised floor over three data centre levels, the project, based in Springfield, Queensland, is the largest of its kind in Australia and will be Queensland’s only Tier 3+ data collection point.So important were the Construction Specialties performance louvres to the development, much of the building design was driven by the positioning, material specifications and design of the louvres.Lawrence Issa, Project Manager for Construction Specialties, and project partners Darryl Wright and Steve Emery of Project Sales worked closely with the Polaris construction team from project inception to completion to devise the most effective weatherproofing and airflow option for the building which also matched the intended aesthetic.“In-depth collaboration with the Polaris team led to the selection of our Architectural Line Louvres, of which two types were used – our RS7305a and LSM louvre models,” Lawrence said. “Unlike other louvres on the market, this range prevents up to 99% water penetration and maximises airflow, while also complementing the building facade as the horizontal louvre frames selected are hidden from view.“Our performance louvres cover 345m2 of the exterior building and are specifically customised in terms of size, shape and colour for the data centre,” Lawrence said.Miguel Thievent, Senior Project Engineer at Thiess, remarks that the CS Louvres perform to the highest standard, which was essential in meeting the building specifications.“It was vital we didn’t compromise on weather proofing and airflow,” Miguel said. “For example, we have six generators integral to maintaining the whole IT system in case of power failure which would not run if the airflow was affected or they were damaged by rain.“The Construction Specialties performance louvres were the only ones on the market that could guarantee damage would not occur as a result of bad weather conditions,” Miguel said.Construction Specialties’ performance louvres are at the leading edge of louvre design and are tested under real world conditions to meet the maximum standards demanded.Construction Specialties offers a broad selection of louvres under 3 main categories:Storm Resistant/Performance Louvres – The main objective of Performance Louvres is to allow the passage of air, whilst providing the area beyond the room with protection from rain penetration.Standard Louvres – A standard louvre will provide the maxiumum airflow required, but with minimal rain defence.Screening Louvres – Screening louvres, are low cost solutions that hide plant or other equipment from view.CS Louvre systems are available in a comprehensive range of finishes and colours, ensuring there is a Construction Specialties Louvre system to suit most aesthetic and performance needs.Louvre panels are factory assembled in a controlled and quality assured environment and provided to site in a fully finished modular form; thus, allowing for trouble-free and fast installation.A comprehensive range of accessories including insect/bird mesh and blanking panels in various materials and finishes is available to complete the application.

Showing 109-121 of 121

Feedback