NBS Source
I'm a manufacturer

"electrical mains and standby supply"

312 results found

Sort by:

Showing 73-104 of 104

Sponsored
Sir Edward Weary Dunlop Retirement Village, VIC

Sir Edward Weary Dunlop Retirement Village, VIC

Rondo Building Services Pty Ltd

The Sir Edward Weary Dunlop Retirement Village has been completed with the help of architect, builder and contractor Ryman Healthcare. The 134-unit age care facility will house serviced care units and independent living units for the elderly with resort-style facilities. Rondo assisted in the development of this project, supplying a number of products including Stud and Track (64mm and 92mm x 0.55BMT), KEY-LOCK Suspended Ceiling Systems and MAXIjamb Systems for the large window and door openings leading onto balconies.
Sponsored
Cockburn Central Complex, WA

Cockburn Central Complex, WA

Rondo Building Services Pty Ltd

Mixed-use residential/commercial complexes take the saying ‘home away from home’ to a whole new level. Rondo has provided ongoing technical support with weekly site visits, as well as coordinating with long time Rondo users AN West Contractors. Supplying this unique project with Rondo Steel Stud and Track and KEY-LOCK Systems, Rondo have ensured that any onsite issues have been successfully addressed with the support of Rondo’s technical and design team.
Sponsored
Tele2 - Headquarters, Sweden

Tele2 - Headquarters, Sweden

Boon Edam Australia Pty Ltd

European telecommunications operator, Tele2 were moving into new offices in Kista Science City - Stockholm as their headquarters. It had been decided that they were going in an Activity - Based Workplace direction, featuring large, open work areas where people could move freely throughout most of the building. From a security perspective, this work concept came with a few challenges. The Business Challenge Tele2 were moving into a new building with an “Open Office” design. The challenge was to create a transparent, inviting atmosphere while still maintaining a high level of security. Furthermore, an emergency exit was also required through the gates. Together with Tele2 and BAU architects, Boon Edam started sketching and researching, to find the perfect solution for the main entrance to the building. The original plan to make the building as open as possible, changed slightly to accommodate important security needs, both around the entrance and throughout the whole building itself.
Sponsored
Barangaroo Tower, NSW

Barangaroo Tower, NSW

Bent & Curved Glass

Designed by Woods Bagot Pty Ltd and built by Lend Lease Group, BCG manufactured curved heat strengthened laminated glass panels for the feature stair to the entry lobby of the first completed commercial tower at Barangaroo – International Towers Sydney (ITS) 2. Working closely with Woods Bagot Architects and fabricators F & D Normoyle Engineering, BCG assisted with the fine tuning of the detail design. BCG’s precision bending and laminating processes provided the quality of finish and timely supply required to ensure the successful completion of the project.
Sponsored
The University of Western Australia, WA

The University of Western Australia, WA

Dyson (Australia)

The University is open every day to thousands of people and its bathrooms in particular have an extremely high footfall. Paper towels, in combination with a few hand dryers, led to considerable unwanted mess and complaints, which in turn also incurred a high, ongoing cost to supply hand towels to all campus bathrooms. Ferguson Architects, who were tasked to refurbish the UWA upgrade suggested the Dyson Airblade Tap hand dryers as the preferred product to install across the 60 bathrooms, due to its combined water tap and hand dryer capabilities. Architect: Ferguson Architects.
Sponsored
Iconic Maison de l’Ordre des Avocats fire-protected by Hempafire Pro 315

Iconic Maison de l’Ordre des Avocats fire-protected by Hempafire Pro 315

Hempel

With a glass façade symbolising the transparency of justice and a glossy metal exoskeleton, the new Maison de l’Ordre des Avocats (House of the Paris Bar Association) is a stunning addition to the French capital’s new Batignolles judicial city. For the building owner, safety is a top priority. Therefore, the exoskeleton needed a proven passive fire protection coating that would enable the steel to maintain its load-bearing capacity for up to 60 minutes during a fire, giving those inside valuable extra time to evacuate.The challenge Specialist paint application and surface treatment company ROTH & Cie was contracted to apply the passive fire protection coating system. ROTH & Cie has worked with Hempel for many years and was keen to work with us on this project. However, due to the project schedule, the tubular exoskeleton framework was delivered to the construction site with a competitor’s epoxy primer already applied. ROTH & Cie therefore wanted a Hempel passive fire protection system that would work with the existing primer. Also, as building aesthetics are important in the overall design, the exoskeleton needed a high-quality matt satin finish. The solution Our solution was to specify a system of Hempafire Pro 315 and Hempathane 55750. A single component intumescent coating, Hempafire Pro 315 complies with the EN 13501-2 standard for the fire classification of construction products. It is optimised to provide 60 minutes of passive fire protection, as well as partial protection up to 90 minutes. In addition, thanks to its exceptionally low loadings, Hempafire Pro 315 requires significantly lower dry film thicknesses than competitor products. As a result, ROTH & Cie could apply the coating in a thinner coat, significantly reducing paint consumption, application time and project costs. The full system was completed with Hempathane 55750, a polyurethane topcoat with quick crosslinking properties that provides the matt satin appearance required by the specifications. Our dedicated passive fire protection R&D Centre in Barcelona, Spain verified that Hempafire Pro 315 could be applied on top of the existing primer. The entire system was spray applied using an electric airless pump, which is ideal for construction sites as it does not require an air compressor. The project is just another in a long line of successful collaborations with ROTH & Cie, which also include previous passive fire protection coating projects, most notably La Halle Secrétan covered market and La Samaritaine department store, both in Paris.At a glance Project Name: Maison de l’Ordre des Avocats (House of the Paris Bar Association) Customer: ROTH & Cie System: Hempafire Pro 315 + Hempathane 55750 Volume: 4,080 litres
Sponsored
Supercar, Super Finish - Porsche Showroom Germany

Supercar, Super Finish - Porsche Showroom Germany

Hempel

Supercar, Super FinishThe new Porsche dealership in central Hamburg provides customers with the high-level comfort, convenience and safety associated with the brand. A striking new complex is being erected in Hamburg city centre, which includes the Porsche Center Hamburg Alstergate, due to open this spring. Hamburg is a leading Porsche stronghold, reputed to have the highest density of Porsche owners in the world, with a 0.8% quota of the city’s car population and nearly 1,000 vehicles a year sold regionally since 2014. Covering almost 8,000m2 of land, the Alstergate plot has over 200 parking spaces, including an underground car park with valet parking service. Attending to the growing Porsche model range, the building will have four new charging points for electric and hybrid vehicles and will be one of the few German competence centres for the 918 Spyder supercar and Carrera GT. Along with the new building, Porsche’s workforce in the region is set to grow to 115 employees.Such a prominent Porsche dealership in northern Germany’s foremost metropolis demands extraordinary standards from the construction and décor contractors entrusted with the project. Applicators Strahl, Reinigungs & Anstrichtechnik of Kiel, with whom Hempel already has long-standing commercial relations, were required to produce the extra smooth surface finishes sought by thedesigners. Furthermore, public safety is an inherent factor that has to be considered in all aspects of construction, so applicators chose to apply Hempacore One as the intermediate coat on ready-primed steelworks, prior to finishing with a topcoat of our Hempathane 87481 enamel.Both Hempacore One 43600 and its fast-drying 43601 version provide up to 120 minutes retardation in the event of fire, a factor of great importance in buildings designed for public access. Significantly on this occasion, Hempacore One does not just offer excellent passive fire protection but also certain additional features of great value to designers and applicators alike. The fact that its full fire retardant properties can be achieved with much lowerlayer thicknesses makes for speedier work and also more natural aesthetics on visible steelwork. Lower layer thickness naturally means less paint consumption, thus allowing project managers to make significant savings.Porsche’s new state-of-the-art centre in Hamburg underlines the company’s values of Tradition & Innovation; Performance & Practicality; Design & Functionality; and Exclusiveness & Social Acceptance and the professional application of Hempel coatings help to uphold and enhance those same values.
Sponsored
Prima Pearl Apartments, VIC

Prima Pearl Apartments, VIC

Rondo Building Services Pty Ltd

Rondo has delivered exceptional expertise and technical assistance during the design and construction of Melbourne’s Prima Pearl, residential skyscraper. This prestigious 667 apartment landmark boasts unparalleled amenities across 72 levels, some of which include a private cinema, virtual golf driving range and Level 67 Sky Lounge. By assisting Brookfield Multiplex Constructions’ architects at the design stage, Rondo has ensured our products are readily accessible on site, resulting in less design enquiries during construction. Rondo will be supplying the project with Stud and Track in 64mm, 76mm and 92mm sizes, KEY-LOCK Concealed Suspended Ceiling System and PANTHER Access Panels.
Sponsored
Santiago Airport, Spain

Santiago Airport, Spain

SAS International Australia

A Tricell system was designed by SAS International to fit the "Y" shaped departure lounge at Santiago Airport. SAS International has designed, manufactured and installed metal ceiling solutions for both interior and exterior areas of the new 74,000m² terminal of the Aeropuerto de Santiago, Spain. SAS810 tricell has been installed to create a triangular aesthetic in the departure lounges. This open cell system provides a geometric form that can easily be repeated for a striking finish. The flexible approach in SAS International’s design process enabled this unique solution to fit within the ‘Y’ shaped designed departure lounge. Installed in the main terminal and baggage hall, as well as exterior ceiling areas, is the linear profile system SAS710. The linear slat ceiling, designed so that each slat lines up neatly with the next, forms a perfect row resulting in clean and simple architectural lines. SAS710 was also chosen for the exterior of the building to provide continuity of design. Using specially designed slat retaining angles, the system has been adapted for strength and durability to prevent slats from being dislodged in high wind.
Sponsored
RMS Parramatta, New South Wales

RMS Parramatta, New South Wales

SAS International Australia

The Roads & Maritime Services (RMS) now benefit from a highly progressive workspace in their newly refurbished head office on Parramatta Street. The main aim of the refurbishment project was to improve facilities and collaborative spaces for staff and visitors. However, a significant challenge for the contractors was to keep all existing communications rooms fully operational throughout the project. Achieving the Aim: SAS800 Trucell ceilings were installed in the open plan lounges and stairwells of the renovation. Creating a grid of squares, strong lines stretch the length and breadth of the collaborative space. The system gives a decorative feature to the fit-out with the illusion of a much larger space for activity-based working. Comfortable lounge furniture and bright colours have also been chosen to encourage communication and create a flexible working space. Meeting the Challenge: Specified with a lay-in exposed grid, each tile slots in place without the need for gaskets or cutting. With the building in constant use, installation was quick and easy keeping the project on schedule with minimal disruption. Popular in Australian CBD property markets, the refit considers occupant well-being with Grade A ‘end of trip’ facilities. An upgraded lobby area also contributes to the value-added space with an improved experience for employees and visitors alike.
Sponsored
Springvale Rise Primary School

Springvale Rise Primary School

Adventure+

Springvale Rise Primary School engaged adventure+ to redevelop two of the school’s playgrounds. Utilising funds provided from a government election promise enabled the school to provide the best for their students. The scope included designing and installing two spectrum+ combination units and one large pinnacle+ rope climbing structure in the areas. As part of the package, adventure+ supplied and installed shade sails and undersurfacing in both play areas. Careful selection of colours ensured the playgrounds both matched with the surrounding environment and newly constructed buildings and gave an inviting and engaging atmosphere for the students. The pinnacle+ rope structure has been so successful for the school that they have to roster turns for the children! Providing the entire playground package ensured the playground redevelopment experience was as smooth as possible for the school.
Sponsored
Liberty Global

Liberty Global

Boon Edam Australia Pty Ltd

Hospitality and security are often at odds with each other. The challenge is to find the best compromise between Fort Knox and a warm welcome. Telecom company Liberty Global recently carried out a major renovation of their head office in Schiphol-Rijk – the Netherlands. As part of the project, the access security was considerably tightened, without affecting their brand’s desired welcoming appearance. Liberty Global is an international telecommunication and television company. It is also one of the largest internet service providers outside the USA. Liberty Global operates in 14 countries and has 35,000 employees. The head office is based in London and additionally there are central offices in Amsterdam and Denver. Consumer brands that belong to Liberty Global include VodafoneZiggo (50% Joint Venture with Vodafone), Virgin Media, UPC, Unitymedia and Telenet. In the high-quality business park - Schiphol-Rijk, Liberty Global have seven office buildings, which, collectively, employ a total of around 1600 people of 55 nationalities. "We did have manned security at the main entrance, but that solution did not always prevent people from entering our central hall unnoticed," says Simon Kuitert, who holds the position of Corporate Security Manager at Liberty Global. "That is why we introduced a single point of entry for the recent renovation."
Sponsored
Riverscape - The Renovation, London

Riverscape - The Renovation, London

Boon Edam Australia Pty Ltd

London is a vibrant, busy and beautiful city, boasting constant innovation and unique architecture. Now, developments have become bigger and more competitive year on year. With expectations on office workspaces becoming increasingly more open and flexible, the requirement for integratable security has become a complex task. This led to the existing building of 10 Queen Street Place, Riverscape to have a much-needed refurbishment following the trend of open atriums, flexible floor space and usable rooftop space. Within this project, the interior and exterior were dramatically changed and enhanced utilising fresh entry and access control security solutions. Located next to Southwark Bridge and a couple minutes’ walk from the bustling area of Cannon Street Station is Riverscape. Originally opened back in 1980, the multi-storey office space was a modern development that sat on the sought-after area of the River Thames. This project was refurbed from top to bottom, with the original Boon Edam entrance solutions being upgraded to newer more innovative products. The lead architect was Aukett Swanke with interior designers Barr Gazetas leading the design of the refurbishment and, main contractors being Overbury. Working for this project years prior in relation to the old security lanes and revolving doors that were installed by Boon Edam, the London Sales team knew the building and requirements needed. It’s common to see dated installations be retrofitted with newer security products that modernise the look and feel of an entrance as well as upgrade the technology associated with them. Download the Case Study for more information about the project.
Sponsored
Polaris Data Centre

Polaris Data Centre

Construction Specialties

To protect the priceless infrastructure and mission-critical IT information in Australia’s first custom built, high-tech data centre, Polaris, Project Manager Thiess turned to the leading manufacturer of specialist building products, Construction Specialties.Integral to the $121 million construction was the regulation of airflow to safeguard the computer hardware; Construction Specialties’ customised performance louvres were the only product in Australia able to meet this construction challenge.Boasting 14,000m2 of floor space on 5 storeys with 7000m2 of raised floor over three data centre levels, the project, based in Springfield, Queensland, is the largest of its kind in Australia and will be Queensland’s only Tier 3+ data collection point.So important were the Construction Specialties performance louvres to the development, much of the building design was driven by the positioning, material specifications and design of the louvres.Lawrence Issa, Project Manager for Construction Specialties, and project partners Darryl Wright and Steve Emery of Project Sales worked closely with the Polaris construction team from project inception to completion to devise the most effective weatherproofing and airflow option for the building which also matched the intended aesthetic.“In-depth collaboration with the Polaris team led to the selection of our Architectural Line Louvres, of which two types were used – our RS7305a and LSM louvre models,” Lawrence said. “Unlike other louvres on the market, this range prevents up to 99% water penetration and maximises airflow, while also complementing the building facade as the horizontal louvre frames selected are hidden from view.“Our performance louvres cover 345m2 of the exterior building and are specifically customised in terms of size, shape and colour for the data centre,” Lawrence said.Miguel Thievent, Senior Project Engineer at Thiess, remarks that the CS Louvres perform to the highest standard, which was essential in meeting the building specifications.“It was vital we didn’t compromise on weather proofing and airflow,” Miguel said. “For example, we have six generators integral to maintaining the whole IT system in case of power failure which would not run if the airflow was affected or they were damaged by rain.“The Construction Specialties performance louvres were the only ones on the market that could guarantee damage would not occur as a result of bad weather conditions,” Miguel said.Construction Specialties’ performance louvres are at the leading edge of louvre design and are tested under real world conditions to meet the maximum standards demanded.Construction Specialties offers a broad selection of louvres under 3 main categories:Storm Resistant/Performance Louvres – The main objective of Performance Louvres is to allow the passage of air, whilst providing the area beyond the room with protection from rain penetration.Standard Louvres – A standard louvre will provide the maxiumum airflow required, but with minimal rain defence.Screening Louvres – Screening louvres, are low cost solutions that hide plant or other equipment from view.CS Louvre systems are available in a comprehensive range of finishes and colours, ensuring there is a Construction Specialties Louvre system to suit most aesthetic and performance needs.Louvre panels are factory assembled in a controlled and quality assured environment and provided to site in a fully finished modular form; thus, allowing for trouble-free and fast installation.A comprehensive range of accessories including insect/bird mesh and blanking panels in various materials and finishes is available to complete the application.
Sponsored
Colour by Design - Siblings Restaurant

Colour by Design - Siblings Restaurant

ECOTONE

CollaborationArchitect: Space Cubed DesignBuilder: Zero 9 ConstructionsMaterial & ApplicationOur ECOTONE team created and applied a white colour finish using ECOTONE Matt to the grey brick moulded precast concrete. The surface was then protected and sealed with ECOCLEAN Clean and Protect Shield to provide a gloss finish which would also be easy to clean and provide antimould, anti-bacterial and antiviral benefits.OutcomeThe architect had included a gloss white brick to the interior colour scheme however supply became an issue. ECOTONE was asked to step in and collaborate with the design team to deliver a durable gloss white colour finish while maintaining a grey mortar realistic effect. A truly stunning and sustainable Colour by Design!TestimonialThe ECOTONE team were very professional to deal with from the start of the process. The guys on site were friendly, professional and did a very neat job. The product itself is amazing, we applied the clear sealer on top of the white ECOTONE stain to the bricks, nothing sticks to it and it is very easy to clean.Adam Fisher, Zero 9 Constructions
Sponsored
Dublin Airport

Dublin Airport

SAS International Australia

SAS International designed and manufactured a range of solutions for the new 75,000 square metres Terminal 2 at Dublin Airport, Ireland. According to Dublin Airport the new second terminal will be capable of comfortably handling up to 15 million passengers per year. Specification demanded that durability, ease of maintenance and acoustics were considered. SAS International worked with architects Pascall + Watson to design the ceiling solution answering the architect’s brief to factor in ongoing maintenance conducted by Facilities Management teams in the future. The design of these large sized ceiling panels required careful consideration at design stage to ensure they would be manageable when working at a height. Designed and developed specifically for Dublin Airport was 35,000 square metres of ceiling systems, installed in the main departure area, walkways and baggage handling areas. This solution looks like any other suspended metal ceiling system as it provides an aesthetically pleasing flush finish. But where this product differs is its ingenious way of allowing access to the ceiling void and services for ongoing essential maintenance. This is of particular benefit in high traffic areas such as Dublin airport as it enables a corridor to remain in use rather than having to close off the entire route. SAS International manufactured the 20,000m2 of large aluminium frames for the fabric ceilings which creates a striking central feature. Working closely with SAS International were local installers Platt and Reilly who applied the stretched fabric to the frames on-site and hoisted them into position. Creating a comfortable environment for traveller and worker was helped with the use of acoustic floating rafts and perforated metal ceiling solutions (with integrated acoustic pads) to provide the necessary acoustic control for this project. Lighting was suspended neatly between the rafts to also provide a modern finish to the corridors. In addition Perimeter heating and air handling grilles also enhance the experience.
Sponsored
Uppsala University, Sweden

Uppsala University, Sweden

Boon Edam Australia Pty Ltd

When entering the new Segerstedthuset building at the Uppsala University in Sweden – guests, students and employees alike are cheerfully greeted by a colourful revolving door. This unique door is an art installation by renowned American artist Spencer Finch and is aptly named ‘The Colour Wheel’. The artist is best known for installations that visualise his experience of the nature of light, colour, memory. The Uppsala University is the oldest university research university in the Nordic area and this large facility is located in Uppsala, Sweden - educating 45000 students. The new Segerstedthuset building, designed by 3XN is a multi-purpose extension to the university and was conceptualised and constructed as a modern workplace for researchers, university administration and management. Boon Edam Sweden was approached to supply Spencer Finch with two Tourniket revolving doors. The doors measure a diameter of 3000 mm and a total height of 2400 mm and the 6 glass door panels provide the canvas for the light installation artist to work his magic on. Colour film is fitted between the glass which creates a truly remarkable and memorable entry experience into this urban, communal space. The Segerstedthuset building was built as a sustainable building and proved to meet high environmental standards such as efficient energy use, sound material choices and a silent indoor environment. The building is environmentally certified according to the Sweden Green Building Council at the silver level.
Sponsored
New Street Station, Birmingham

New Street Station, Birmingham

SAS International Australia

Birmingham New Street Station was originally re-built in 1967 to accommodate 650 trains carrying 60,000 passengers per day. By 2010 it had become the busiest station outside of London, operating at more than twice its intended capacity. The first half of the refurbishment was completed in 2013. The station’s recently updated configuration should now accommodate a yearly 8.3% rise in passenger numbers. SAS International commenced work on the three-phase project in June 2012. NG Bailey and main contractor Mace installed SAS systems across the platforms, the shopping centre and the concourse. Full scale, physical mock-ups of the bespoke ceiling solutions were built on-site to ensure design intent prior to installation. The integration of fans for smoke extraction and complex wind loads had to be considered to guarantee passenger safety. The wind loads were a concern as trains passing platforms at speed can cause considerable negative loads. Bespoke ceilings comprising fixed angle bulkheads were installed in line with the curving platforms. The typically trapezoidal bulkheads were bolted end to end in order to form a faceted layout to follow these curves. Using shared data from the project’s BIM model, SAS International used a point cloud to measure the platforms and 3D model the panels. The model’s geometry revealed that the platforms were all non-uniform. This posed a significant design challenge. The data required careful analysis in order to achieve a smooth curved line within the platform edge. This was essential to provide train drivers with an unobstructed view coming into and out of the station. The SAS International design team was able to rationalise the number of unique panel types down to four. This overcame the driver visibility issue, ensured uncompromised aesthetics and brought costs within budget. Electronic Total Station setting-out techniques were then used to set out the panels along the curve.
Sponsored
Deakin Uni LC Building

Deakin Uni LC Building

RBA Group

The Deakin Uni LC Building features the following RBA products:RBA2733-032 – Compact Water Cooler Stainless Steel ShroudRBA2732-001 – Push Button Bottle Filler Stainless SteelDeakin University holds multiple campuses across multiple Melbourne suburbs. The University houses four main faculties, arts & education, business & law, health, and science, engineering & built environment. Deakin Uni is also renowned for its world-leading online tertiary education program, innovating modern education. Located to the west of the heart of Melbourne, the Burwood Campus holds the newly-unveiled LC Building, designed in an innovative way, holding multiple levels of formal and informal learning areas, health and wellbeing services and a premium staff working space for the Law School. The building aims for sustainability, sporting solar panels, native flora in its Wellness Garden and indoor greenery. The contemporary “green” design had to include RBA, as we share the same goal of sustainability. Furthermore, by providing to the ever-innovative Deakin University, we are improving the learning experience of the education sector.Pictured below, RBA’s ‘Compact’ Water Cooler, or the RBA2733-032, flows 30L of water per hour. RBA categorises the unit as ‘heavy duty’, meaning it maintains to be strong and long-lasting. Made of Stainless Steel with a Satin Finish, it has an Anti-microbial flexible bubbler with self-closing push button and non-squirt features (stainless steel bubbler options available upon request). Included is an integral perforated drain for hygiene & ease of cleaning. The Water Cooler exhibits a smooth radiused design that eliminates sharp corners thus minimising catch. All pipework is concealed within the Stainless Steel Shroud and contains the option of a Bottle Filler.Deakin University LC Building decided to pair the Water Cooler with a Push Button Bottle Filler, or the RBA2732-001. Users hold their bottle in the recess provided and press the button to activate the flow of water. Flow stops upon releasing the button. Spillage is directed onto the deck of the Water Cooler mounted underneath. Thus, students have a sustainable alternative for hydrating.
Sponsored
University of Birmingham Library

University of Birmingham Library

SAS International Australia

Part of a vast regeneration programme to improve student amenities, the UoB invested £60m in a state-of-the-art academic library. The project aimed to celebrate the wider campus architectural styles and improve access to new resources like e-journals and wireless charging stations. Associated Architects chose SAS International to provide the high acoustic and finishing touches to the academic interior fit-out. In order to create an effective library environment, acoustic performance must also be carefully considered. With the aim to create a space suited for thousands of scholars, bespoke acoustic metal wall panels were supplied to the library. Depending on the location of each tile, the panels were finished in white and black-grey PPC or anodised in regency gold. Specified with a 23% or 50% open area, the panels act as acoustic absorbers with an oblong perforation. Each panel is fitted with a black, fleece-wrapped acoustic pad for high performance. The architects specified three additional acoustic treatments for open soffit areas over computer clusters and lounge spaces. SAS500 baffles and bespoke ring shaped and circular rafts were created by SAS International to fulfil this requirement. The discs and raft-halos are an SAS150 hybrid designed to fulfil acoustic and service requirements while contributing to the contemporary look. Consisting of multiple panels, the concealed grid system creates a smooth finish enclosed using a steel perimeter trim. Long 3m baffles were also installed in a continuous sequence along walkways and group study areas. These options provide durable acoustic solution, minimising maintenance and improving access to the soffit and services.
Sponsored
Mother Teresa Catholic College, WA

Mother Teresa Catholic College, WA

Termimesh

Mother Teresa Catholic College, WALocation – Baldivis, Perth, Western Australia      Installation Duration - 3 monthsInstallation Year – 2019                             Project Value - $15-20 millionSpecifying Architects – Parry and Rosenthal Architects TECHNICAL DETAILInstallation Type                                             NumberService penetrations                                     150Cluster penetrations                                      11Control joints                                                   700 LMConcrete slab pours                                       Grid pattern - numerousPerimeter                                                           500 LM  BACKGROUNDMother Teresa Catholic College is a progressive co- educational facility in the fast-growing suburb of Baldivis, 60 kilometres south of Perth in the City of Rockingham.The school opened in 2013 and in 2018/19 a Stage 3 Capital Development Program called for the construction of junior-secondary class-rooms and associated facilities, playing fields, courts, grounds, and extended parking. REQUIREMENTThe College’s ongoing plans for facility enhancements represents a significant investment and is worth protecting with the most effective pre-construction termite management system.The College caters for students from pre-kindergarten to Year 12. Chemical termite controls were not an option because of toxicity issues, making a clean and environmentally safe physical termite barrier the correct solution.APPROACHA typical WA site, the college’s location is predominantly flat, with sandy soils and substrates. In general, this type of environment poses a high risk for termite attack common to this region of Western Australia. SOLUTIONThe main challenge with the installation came from the rammed earth exterior walls. Their natural composition can chip easily, so nailing or sealing the termite barrier onto the wall was not practical.Our solution was to install Termimesh cold joint /paver trays to the perimeter of the concrete slab edge. These protected the concealed entry point between the slab and wall. They also engaged into the external pavement instead of against the rammed earth wall itself.BENEFITSThe Termimesh System which comprises of our 725 grade stainless steel mesh, Termiparge bonding cement and high grade stainless steel clamps not only met their strict requirement of no chemicals it will also continue to provide them with reassurance and peace of mind the comes with our market leading Pledge Guarantee. The Pledge Guarantee provides the client with a 10 year guarantee that requires no annual inspections during that initial period. The client then has the option to extend this on an ongoing basis by having an approved annual inspection.
Sponsored
Burj Khalifa

Burj Khalifa

Boon Edam Australia Pty Ltd

The Burj Khalifa – formerly the Burj Dubai – is a legendary building that can only be described in superlatives. At 828 metres high, it is the tallest building in the world. The Burj Khalifa has 160 floors, more than any building in the world. The building also has the highest floor, the highest façade made of aluminium and glass, the highest nightclub and the highest restaurant, the highest service lift and the lift with the longest travel distance. Finally, the building has the highest positioned revolving doors ever installed in a façade worldwide. In less than 30 years, Dubai has become the leading city in the Middle East and is known for its architectural and technical excellence. The Burj Khalifa has become the symbol of this progress. The Burj Khalifa also takes the title of the highest structure in the world back to the Middle East; the Great Pyramid of Giza used to hold the title 4 millennia ago. International Collaboration The tower was designed by architectural firm Skidmore, Owings & Merril, known for their designs for the Willis Tower (formerly the Sears Tower) and the new One World Trade Center in New York. The three-pronged design is based on the spider lily desert flower and consists of three elements around a central core, with the elements spiralling upwards. It can rightly be called an international project: the construction team consisted of Samsung Engineering & Construction employees from South Korea in collaboration with Besix from Belgium and Arabtec from the United Arab Emirates. The UK consultancy Hyder Consulting was responsible for overseeing construction of the building. In total, companies from more than 30 different countries contributed to the construction of the Burj Khalifa. A Windy Challenge The wind is quite a challenge when building a skyscraper of this size. Without additional measures, the top of the building would move so much from side to side due to the wind that people would become seasick. Dubai is also regularly tested by the shamals: sandstorms that can last for days. As the outer façade of the Burj Khalifa contains an enormous amount of glass, these weather conditions presented a considerable challenge. The three-part design proved to be the solution because the spiral floors break the wind currents around the building, resulting in a stable structure. The World's Highest Revolving Doors Skidmore, Owings & Merril's design includes an observation platform on the 124th floor of the building. Two glass revolving doors provide access to this room. At 442 metres above the ground, these are the highest positioned revolving doors ever installed in the façade of a building. The revolving doors must also be able to withstand an extremely high wind load of at least 3000 Pascal, which corresponds to an F3 class tornado. The Burj Khalifa required two automatic revolving doors with a diameter of 3,000 mm and a total height of 2,700 mm; the cover could only be 300 mm high with the motor installed. Generally speaking, a revolving door with these specifications would only be able to withstand wind loads of up to 689 Pascal. It was clear, then, that not every revolving door manufacturer could supply an entrance that met these requirements. Challenge Accepted Koninklijke Boon Edam was one of only two companies invited to devise a system for this challenge. There were two main problems that had to be solved: the round sides of the revolving door had to be strong enough to resist the wind, and the door set had to be properly fixed so the door wings could not be blown off during a storm. Boon Edam worked closely with Mace, the Hyder Consulting Group, Samsung Engineering and Construction and Turner Construction, the subcontractor, to develop a system that met all these requirements. During the first phase of the process, the second company invited to tender had to give up because their design did not meet the challenging conditions on the 124th floor. Boon Edam persisted in its efforts, and after conducting various wind load and glass tests, it became possible to adapt the construction of the Tourniket to the requirements of the Burj Dubai. A Tornado-Proof Revolving Door at the Burj Khalifa Our proposal for the Burj Khalifa consisted of a Tourniket with specially reinforced door frames twice the width and thickness of a normal revolving door. These were securely anchored with special bolts under the floor to guarantee the structure's rigidity. Although most revolving doors are installed on the top of the subfloor, this door was installed under the top finish layer of the concrete floor. To guarantee the stability of the door set, an extra-thick steel frame was added to the structure. This allows the door wings to easily withstand the wind pressure. Expansion on the 148th Floor in 2014 Boon Edam installed the same specially designed Tourniket revolving door on the 148th floor as on the 124th floor. However, the new project brought an extra challenge: transporting all of the materials from the basement of the building to the 148th floor. First, the materials had to be transported in one lift to the 111th floor. They were then transferred to a second lift, from where everything had to be moved manually from the 149th floor to the 148th floor, to the door's location. Special Projects Based on Standard Solutions The revolving doors we created for the Burj Khalifa were an extreme challenge. The experience and expertise of our technicians combined with the tried and tested technology of the Tourniket enabled us to develop a successful solution. Both revolving doors are now used daily and give visitors a spectacular view of Dubai. The glass design beautifully complements the modern façade of the observation platform and puts Dubai's beautiful skyline in the spotlight.
Sponsored
One New Change, London

One New Change, London

SAS International Australia

One New Change features SAS International bespoke metal ceiling panels with an expanded metal mesh, finished in silver, red and black. The ground-breaking, bold and perceptive £300 million One New Change mixed-use development project won the MIPIM AR Future Project Award 2010. Now complete, the building has become known as the ‘Stealth Bomber’ after the radar-proof combat plane that inspired its faceted form and has also won a RIBA 2011 Award for London and LDSA Building Excellence Award. The design incorporates pedestrian arcades converging at the core of the building, reinstating a historic north-south pedestrian route and allowing new panoramas of London’s landmark St Paul’s Cathedral. SAS International supplied the ceiling solution for the retail corridors of the development with a concealed suspension system, working closely with the architects to create a result where no visible fixings can be seen through the ceiling plane. To complement this, bespoke metal ceiling panels were produced with an expanded metal mesh, finished in silver, red and black. A challenging material to work with, to ensure the mesh held a uniform shape and corners for the panels could be formed accurately, SAS International’s solution was to create a ‘picture frame’ behind each panel. This also helped to provide support for the concealed attachment bolts. Design challenges at One New Change included the building grid size and shape (it was termed the most difficult site in Europe), the complex geometry of the structure (including some tight ceiling to structural beam heights), and a shared fire strategy between retail and office storeys. Requirements to achieve an environmentally-friendly building, complying with Part L and BREEAM ratings, were also critical and the design uses a materials palette of limestone, metal, mirror and a new method of fritted glass on the exterior to help shield the interior from glare.
Sponsored
Columbia College, USA.

Columbia College, USA.

Boon Edam Australia Pty Ltd

The new Student Center at Columbia College Chicago, located at 754 South Wabash Avenue in Chicago, opened its doors in the fall of 2019. This brand-new building offers five spectacular stories of spaces for students including music and film-screening rooms, dining options, a fitness centre, a reflection room for meditation and prayer, and event spaces for meetings, performances, and receptions. Columbia College Chicago has a closed campus. In order to enter any building on campus students and staff must have a Columbia ID or visitors must have a valid appointment. The main entrance at the Student Centre is the Tourniket manual revolving door that leads to a public foyer that includes a coffee shop and lounge. Since the speed gates are just past the security desk at the boundary of this area, they serve as a visual and physical indicator of where the public area terminates. Next to the Speedlane Open speed gates, which are notable because they do not have any closing barriers, guards watch as people pass through them to ensure that everyone is scanning their IDs and that the IDs are valid, in which case the speed gate shows a green light. In a situation where a red light shows and the gate alarms, the guard will check the person’s credentials and can try to troubleshoot the ID card. “The decision was really about what creates the least barrier to those entering and exiting the building,” said Dutil. “We don't really want our students to feel like they are overly policed or that our buildings are not accessible to them. So the design of the Open speed gates provided the best solution in terms of controlling access without being obtrusive." Swift Passage While Maintaining Accountability Before the Student Center was built, students entering any campus building would just show their ID to the security officer as they walked past. The administration realised that while this does provide some level of security, it is not foolproof – particularly when many people are entering at the same time for a class. The College’s head of security made the suggestion to install a system that would allow for swift passage of authorised people while maintaining accountability around who enters and exits the building. As anticipated, there was a brief learning curve for the students using the new system. “This was the first system like this on our campus,” said Dutil. “And the first few days that the new Centre was open were also the first few days of school. There were a lot of people new to the campus who required a bit of coaching from guards and our student staff in terms of where to place your card, and to not walk through before you place your card.” Coming Out Ahead of Swinging Doors Dutil confirms that the access systems placed at Boon Edam speed gates are actually outperforming those placed at swing doors across the campus for convenience and adoption. Across the campus, there is a card reader at every swing door entrance of a building where you present your card and a light turns red or green. But oftentimes the card reader is missed, or depending on the placement of the lights and placement of the guard, it can be kind of hit or miss with students walking right by it. “But with the Open speed gates, they're very visible and although they're not a total barrier to entry, they are something that's right in front of you. Because it's very noticable and not easily overlooked, the students have learned pretty quickly to get their ID out. In fact, this was meant to be a test run for the campus to ensure it would be viable and worthwhile for other buildings as well.” Advanced Features Add Value and Flexibility The speed gates have delivered additional benefits beyond basic campus security, according to Dutil. “One of the nice things about a system like this is that we can count visitors to the Student Centre because we get the data of everybody that scans in. So on a busy day for us it's about 2500 people throughout the day. That can range depending on what's going on and what time of year it is. On weekends we're very slow, since there are no classes – maybe 900 to 1200.” “We are a rental venue as well, so we have times where the building is open to non-Columbia College Chicago people for events or other functions. There's a really convenient touch panel right at the security desk called the BoonTouch, where the officer can turn off the turnstiles during those times and then attendees can move through freely without any alarms going off at all.” A New Revolving Door Adds Comfort and Peace of Mind Finally, the Tourniket manual revolving door delivers one additional benefit to the Student Centre, located in a city known for harsh weather. “Revolving doors are always preferred at a building like this that gets a lot of traffic going in and out. We have cold, drafty weather that blows right into our main space at that first floor entry. The revolving door helps to keep the building warm and saves energy and utility costs as well,” said Dutil. “Students feel safe and comfortable entering the building at night,” he concludes. “Our building has a lot of nooks and crannies, and someone can end up alone in a space. And so I think knowing that the only people that are in that building are the ones that are supposed to be there is helpful. Overall, our students appreciate the effort to try to keep them safer.”
Sponsored
Australian Parliament House

Australian Parliament House

RBA Group

The Australian Parliament House features the following RBA products:B4112 – Bobrick Contura™ Surface Mounted Soap DispenserB38034 – Bobrick Paper Towel & Waste, Trimline™ series Also referred to as Capital Hill, the Australian Parliament House is the central meeting place for the Parliament of Australia. Designed to hold 5000 people when Parliament meets, the 32 hectare site is where Australia’s biggest decisions are made by agents of our citizens. RBA has consistently provided for Capital Hill during the 21st Century in a bid to provide world-class products for Australia’s representatives.Located in the heart of Canberra in the Australian Capital Territory, the Australian Parliament House was designed to better accommodate a larger number of people, meaning a greater amount of facilities for its growing occupancy. The building is designed to be spacious and not intimidating to the public, encouraging citizens to visit. Catering for Capital Hill’s requirements of security, high traffic and minimal maintenance, RBA has supplied a number of Bobrick Accessories specific to this project, suitable for both the highest of political representatives and the average citizen.RBA’s Bobrick Contura™ Surface Mounted Soap Dispenser, or the B4112, is made of strong Stainless Steel and holds a capacity of 1.2L. The unit is Antibacterial Soap resistant, allowing for its users to maintain optimal hygiene without wear and tear. Needing nominal maintenance, the B4112 is ideal for high traffic locations. Exhibiting a Satin Finish, the unit is a subtle addition to the facilities whilst simultaneously complimenting the silver notes in the Washroom design.Also pictured below is RBA’s Bobrick Trimline™ Recessed 2-in-1 Combination Unit, containing both a Paper Towel Dispenser and Waste Receptacle B38034. Recessed in nature, the unit invades minimal space while holding a large capacity of 600 C-fold of 800 multifold paper towels and a waste capacity of 14.4L, sporting two Tumbler Locks for security. It too has a Satin Finish to its Stainless Steel exterior, matching the B4112, maintaining a consistent aesthetic as well as blending in with the amenities. 
Sponsored
Rainwater harvesting for a government facility

Rainwater harvesting for a government facility

Atlantis

Project Location: Amberley, Queensland, AUSTRALIA.In Amberley is one of the largest base facilities in Australia. The redevelopment works are valued at AU$331.5 million. New construction and refurbishment works to be undertaken include newliving-in accommodation, maintenance facilities, storage, working and training accommodation, a combined mess and a new physical fitness centre.The site is owned by an Australian Government Department. The Atlantis® Turf Cell® was supplied by Atlantis and was installed by Kennedy Projects Group in April 2009. The system is located at the playing fields on the south-western corner of Gannet St and Rosewood Road, Amberley, QLD.A vegetated swale surrounds the playing field. The swale is an open, shallow channel designed to slow runoff, filter it, and promote infiltration into the ground. Excess water moving through the soil profile is captured by Atlantis® Matrix® Tank – Single modules. The use of a swale to collected water results in smaller runoff volumes, lower peak discharge rates and cleaner runoff. The vegetation in swales, usually thick grass, helps to trap pollutants such as suspended solids and trace metals. The Atlantis Matrix modules extend 3m (10ft) wide under the swale for 110m (360ft).Water collected by the swale is collected in a stormwater harvesting tank located adjacent to the north-western corner of the playing field. Perforated corrugated plastic pipes used as subsurface drainage pipes extend for 1560m (5110ft) is also collected by the stormwater harvesting tank.The stormwater harvesting tank is located subsurface and is constructed of a heavy duty low density polyethylene liner and non woven geotextile surrounding Atlantis® Matrix® Tank - Double modules. The Atlantis stormwater tank has a 4,100m3 (144,80 ft3) capacity. Water collected by the swale and stormwater tank system is used for irrigation of the sports field.The Atlantis stormwater tank has eight (8) cleanout / inspection ports placed through the systems. A 1200mm (4ft) dia. wet well with bolt down lids has been installed adjacent to the tank serves as a pump out pit. The overflow from the tank has a 15m (50ft) long x 400mm (1.3ft) deep spill way with scour protection into an adjacent creek.
Sponsored
Universal Store Driving Sustainability - Industrial market Segment

Universal Store Driving Sustainability - Industrial market Segment

HOLCIM (AUSTRALIA) PTY LTD

How does it work?ECOPact uses alternative materials to reduce the environmental footprint of the concrete mix.ECOPact alone reduces embodied carbon emissions by 30-60% without the use of offsetsSimilar technical qualities of conventional concreteECOPact zero goes one step further buy offsetting the residual emissions of ECOPact concrete to achieve 100 emissions reduction.The issueThe built environment is responsible for 39% of global energy-related emissions. Over a quarter of these emissions arise from running existing buildings, whilst 11% is attributable to the embodied emissions from the construction of new buildings. Did you know – concrete is the most widely used building material in the world? The production of concrete is highly energy intensive and generates significant emissions.Business GrowthAs we continue to grow and expand our store footprint nationally, in 2022 we are building a new home for Universal Store. Our objective is to accelerate our journey to a sustainable future, so we have made it a priority to integrate environmentally sustainable features in the design of this exciting new project. This also entails considering the climate impacts of this project. EcoPact - Zero ConcreteWe will need tons of concrete and other materials for the structure of our new Universal Store home. But the good news is that some pioneers are investing in research and development to deliver carbon neutral concrete.We are working closely with our construction partners - developer TradeCoast Central, and builder McNab to deliver a sustainable building. The Universal Store new purpose-built facility will make use of carbon neutral concrete supplied locally by Holcim. Their EcoPact concrete can be made carbon neutral by compensating for residual carbon emissions. In fact this product is so much better for the planet, it has just won the Best of the Best 2021 Sustainability Awards from Architecture and Design.We chose this product to achieve the following benefits:·Conserve natural resources - the product uses alternative materials (fly ash, blast furnace slag or silica fume) instead of virgin raw materials (mainly limestone and silica). ·Reduce the carbon footprint of the project - this product achieves a reduction of 30-100% of embodied emissions related to concrete usage in comparison to standard concrete. ·Use our influence and leadership to support the transition to a low carbon economy·Demonstrate that a sustainable future is within reach.
Sponsored
Versatile 52mm Drainage Cell

Versatile 52mm Drainage Cell

Atlantis

The 52mm drainage cell has been used as normally in two guises. Firstly as a TurfcellTM grass reinforcement such as at Natural Designer Homes , a display home in Casuarina NSW. The photograph of the driveway is from about 1year ago, some 4 years from installation. As there are several cars in the family as well as work trucks the installation looks quite good.Secondly as a Gravel cellTM gravel retainer, such as that used at Leaf and Limb Nursery in Kin Kin Qld., where they use the 52mm cell in the walkways as this makes it easier for them to run the trolley through the gravel.However there is a third use for the 52mm drainage cell. That is as walk ways in mining camps. Traymark Industrial Caravans make the vans for accommodation for the workers and Atlantis® 52mm cells are supplied with each van to be used as a walk way to keep workers out of the mud and dirt when at their accommodation..Secondly as a Gravel cellTM gravel retainer, such as that used at Leaf and Limb Nursery in Kin Kin Qld., where they use the 52mm cell in the walkways as this makes it easier for them to run the trolley through the gravel.Now for another use: a client already was successfully using our 52mm drainage cell as reinforcement for parking bays beside a river and in August 2011, it occurred to him that he could extend the parking area into a boat ramp. Our 52mm drainage cell is made from recycled polypropylene with U. V. protection, in sheets being 480mm x 260mm x 52mm.Two tracks, being 0.96m in width were connected to the 52mm drainage cell in the parking area and also were secured by metal hook pegs to the drainage cell of the parking area. The tracks lead to a full width ramp (2.88m in width) into the water.To prevent the ramp from sinking fully into the silt, the ramp and adjacent section of the two tracks are formed by two layers of 52mm drainage cell connected to each other by cable ties. Metal hook pegs were also used to assist in holding the ramp in position.We contacted our client in August 2017 and he is very happy with the boat ramp which is still in use despite several floods, and constant exposure to the elements.Thus the high load bearing of approximately 4000t/sq. M and the long useful life of the 52mm drainage cell has permitted the 52mm drainage cell to be used and still being used in many ways.
Sponsored
New Royal Adelaide Hospital

New Royal Adelaide Hospital

Construction Specialties

The core function of a hospital is to attend to the physical, emotional, and mental needs of its patients. Also, the environment must be comfortable, clean, and serene to assist with a patient’s recovery. New Royal Adelaide Hospital (NRAH) is a perfect example of a state-of-the-art facility that provides a great service for city of Adelaide and surrounding regions.This 800-bed hospital is the largest hospital in South Australia. Sprawling across 25 acres, containing open green spaces throughout the precinct to assist with healing and relaxation, a commercial zone with underground car park and featuring a comprehensive range of clinical care to an estimated 85,000 inpatients and 400,000 outpatients each year.Many CS products were specified and installed in the development of the New Royal Adelaide Hospital. Our expansion joint covers were installed throughout the interior and exterior of the hospital, these expansion joint covers are critical for the development of the hospital to safely accommodate extreme building movement. An example would be the expansion joint SJHD, this seismic metal floor cover can be used in both interior and exterior settings and can provide 760mm of plus movement during a seismic event, and the expansion joint SGR is perfect for interior applications, it is hygienic and accommodates lightweight wheeled equipment, making it ideal for the NRAH. Our expansion joint covers offer a range of sizes, aesthetics, and performance variations. Each model perfectly suited for different environments.Our Acrovyn products were also installed throughout the NRAH. Acrovyn provides wall and door protection throughout the interior space of the building. In an environment like a hospital where there’s a lot of foot traffic and wheeled movement, it is imperative to have your walls protected from any potential impact. Our SCR-64N crash rail was installed throughout the hospital, mainly in the corridors to protect the walls from the bed carts. The HRB-10C, our handrail/crash rail combination is another product installed, which our ligature resistant featured component (a common feature used in behavioural health facilities) and the HRB-10C was supplied in both our Acrovyn Solid Colours and our Acrovyn Woodgrain as the handrail component. Throughout the hospital, the corners were also protected from damage by installing Acrovyn and Stainless-Steel corner guards. Both corner guards are a simple yet effective solution in protecting the vulnerable areas of the hospital. For hospital settings, Acrovyn is an environmentally friendly product, that is pleasing to the eye but also very functionable.The NRAH has been operating since 1841 and it was a privilege to have CS products featured throughout the hospital.
Sponsored
Gold Coast Sports and Leisure Centre

Gold Coast Sports and Leisure Centre

Interpon Powder Coatings

As the countdown for the Gold Coast 2018 Commonwealth Games begins, the Gold Coast Sports and Leisure Centre is emerging as the centrepiece of the newly revitalised Carrara Sports Precinct. The Centre rises from the bank of Clear Island Lake in Carrara, Queensland, resplendent in an eye-catching, sub-tropical palette of yellow and ultramarine blue. Its sprawling 16,500m2 footprint is home to over 5300 spectator seats and 15 multi-use sports courts, which will host a number of Commonwealth Games events including badminton, weightlifting, and wrestling. Designed by BVN Architecture and taking just under four years to complete, the $101 million Centre represents the best and the brightest that the Gold Coast has to offer in terms of sports training and completion facilities. Throughout the design process, BVN had to comply with standards set by the Commonwealth Games and International Sports Federations, as well as those of the local council. The resulting project embodies – and triumphs over – the challenges faced by high profile projects that need to meet high standards, and is evidence of how rewarding such projects can be when done right. It’s rare that a project so closely captures the spirit of the program for which it was designed: the Centre does this and more with flair, the bold, colourful design clearly communicating the vibrancy and high energy of the Australian sporting spirit.  To realise the soon-to-be iconic design of the Centre, BVN turned to Interpon Powder Coatings, the largest manufacturer of powder coatings worldwide. Drawing from their unbeatable experience as the trusted frontrunners in powder coatings technology, Interpon’s team of experts closely colour-matched the architects’ palette to bring their drawings to life. “We were able to work collaboratively with our liquid Metal Coatings team and Bluescope® Steel to match the corresponding powder coat colour to compliment the exterior durability required for the project,” said Gareth Connell, Interpon Specifications Manager.  Warranty-grade Interpon D2015 Ultriva™ products in Carrara Gold Matt and Copper Penny Matt met the long-term legacy requirements of the Council, and will hold their sunny colours for years to come. The Interpon D2015 Ultriva product range offers outstanding performance with a 20 year film integrity and 15 year colour and gloss retention guarantee.  The warmth of the project also reflects the human element that organisers of the 2018 Games are championing in the lead up to the event. “This is a special event… it stands for everything good about humanity,” Gold Coast 2018 chief executive Mark Peters told Inside the Games earlier this month. “We want to make sure the Gold Coast and Australia continues that.”  The gold-tinged façade is fitting in more ways than one: once the Commonwealth Games end mid-April 2018, the Centre will become the new home of the Gold Coast AFL Club, aptly named the SUNS. “We are absolutely delighted,” said Andrew Travis, CEO of the Gold Coast SUNS, about the impending move, “I can’t wipe the smiles off people’s faces.”  For over 25 years, Interpon has supplied high quality powder coating solutions for architectural projects of all styles and colour palettes, bringing smiles to the faces of designers and clients alike.
Sponsored
Sunshine Coast University Hospital

Sunshine Coast University Hospital

Construction Specialties

Being one of the largest public healthcare precincts in Australia at 160,000 m² and spread across 20 hectares of land at Birtinya north of Brisbane, we present the 750 bed Sunshine Coast University Hospital (SCUH). The SCUH has been designed for Queensland Health to be a world class health facility providing exceptional healthcare to its patients as part of Queensland Health’s vision for the future.Incorporated within this Hospital’s health precinct, this state-of-the-art facility offers numerous services for staff and patients. With all that the SCUH has to offer, it was vital that all the equipment and fittings that were required needed to be compliant, safe, practical and had an exceptional appearance. This is where the CS Group was able to provide a portfolio of products to the project that were both practical and aesthetically pleasing.All hospitals have high volumes of wheeled corridor traffic, these day-to-day movements are commonly encountered in a busy hospital. Due to this traffic, it is difficult to keep walls in their original pristine condition. To try to limit the damage that can be caused by wayward trolleys and gurneys, wall protection is put in place.Construction Specialties have supplied a portfolio of products to the SCUH to meet these needs. Starting with their corner protection for the gyprock walls, the CS Group’s VA 250N corner guard can be found throughout the Hospital in both 90 and 135 degree configurations protecting salient corners from damage. Protecting the walls from damage is CS Model SCR-48N crash rail, a 152 mm wide x 32 mm deep Acrovyn crash rail that is installed in the Hospital in both single and double runs for maximum protection. CS Model HRB-4CN Acrovyn handrail, which also acts as a high-level bump rail, completes the wall protection package.Posing a separate challenge to designers were the two Isolation Wards. Both are located within the Hospital in such a way that neither has access to an external window. Rather than have patients stare at blank walls during their stay, CS were asked if we had a solution to the problem. Our graphic imaging product, Acrovyn by Design was suggested as a possible solution and was accepted. Both wards now have a full height wall mural of a relaxing beach scene to look at rather than a typical blank white hospital wall alongside their beds.With such large footprints, each floor of the Hospital required extensive use of expansion joint covers. Construction Specialties were called on to help with the design and specification of expansion joint covers for the project. The CS Group’s SGR Model expansion joint cover was selected for the project as it is available in various widths, the Hospital being 5 floors, as well as allowing a flush mounted finish. The SGR was also chosen for its ability to accommodate wheeled traffic and meet the stringent requirements of infection control associated with a hospital project.Beautiful and practical are two words that can be used to describe the Sunshine Coast University Hospital. An amazing project featuring various CS products throughout the Hospital.
Sponsored
Dallas Police Department, Dallas Texas, USA

Dallas Police Department, Dallas Texas, USA

Boon Edam Australia Pty Ltd

There is a saying that “Everything is Bigger in Texas,” and the Dallas, Texas police department is no exception. The city of Dallas is ranked in the top 10 cities in the U.S. in terms of population, at 1.2 million people. The Dallas Police Department is the ninth largest municipal police force in the U.S., based on 3,012 sworn officers. It is led by Chief of Police, U. Reneé Hall. Security a Concern When Designing HQ Building The department is located in the Jack Evans Police Headquarters building, which was built in 2003. It is 358,000 square feet, has six floors, is spread over a three-acre site, has a separate 1,200 car parking garage and a two-acre, open parking lot for additional visitor parking. Prior to 2003, the department was housed in the circa 1914 former City Hall Building. The Jack Evans Police Headquarters building was under construction when 9/11 terrorists flew airplanes into the World Trade Buildings in New York. That event was preceded by the Oklahoma City Murrah Federal Building bombing in April 1995. Therefore, security was a concern in its design. Police officials worked with a Police Design Consultant – McClaren, Wilson, and Lawrie Architects of Phoenix – to help design the building to resist a terrorist attack and isolate potential hazards. The building also needed to control visitor traffic and access. On an average month, there are 5,000 public visitors to the Jack Evans building. In addition, shots fired at police buildings nationally are not uncommon, says Paul M. Schuster, Senior Corporal/Facilities Management for the Dallas Police Department. “For the most part they are random, single shot drive-by shootings. Often, the officers are unaware that the building has been shot at, until they find a bullet hole in the brick or glass. Increasingly, police tend to be a symbol of government and some citizens see that as a visible target to lash out at. Police officers are trained to expect the routine types of calls, such as domestic violence, traffic accidents, and other crimes. Yet they must be flexible to anticipate the non-routine that can be dangerous and change in a heartbeat.” An Active Shooter Incident Led to an Increase in Security On June 13, 2015, after midnight, a 35-year-old male placed a duffle bag with a remote-controlled bomb to detonate later between cars in the parking lot of the headquarters building. The suspect then began shooting continuously at the lobby windows. Officers responded to the scene, a vehicle chase began, and the incident ended outside the city. Luckily officers in the lobby took cover and were not injured. Following that incident, the Dallas Police Department conducted a security assessment of the building and also at seven patrol stations throughout the city. The assessment included testing various construction materials for bullet resistance to various types of weapons. Gensler Architects and Guidepost Solutions, LLC developed the solutions and plans. “Yesterday we were concerned about handguns, today we are worried about rifles, and the idea of terrorism is always present with outright attack or bombs,” Schuster notes. “The police officers and police staff only want a place that is safe and where they can do their good work.” Funding of $1.3 million was approved to upgrade the lobbies of the seven patrol stations to withstand rifle rounds, and $1.9 million to improve headquarters lobby security, and to upgrade an aging security system. Turner Construction Company and Convergint Technologies, LLC conducted the renovations and security technology integration. Challenges to the Security Design The headquarter’s lobby was initially designed as a two-story glass-walled structure, with an information desk and public records service windows. Visitors were allowed free entry into the lobby and were only screened in an open area to the side if going to other floors. “The challenge in upgrading lobby security was the two-story lobby entrance glass. “In addition, there were concerns about keeping an ‘open’ and friendly service concept in mind and ensuring that the lobby would not resemble a ‘fortress’,” Schuster notes. Screening Room with Security Revolving Doors to Contain Incidents The solution was to keep the existing exterior unchanged and focus on adding a layer of security once a person enters the lobby. Visitors now enter the headquarters and immediately proceed to a side room where security screening is conducted. A new secondary wall with bullet-rated glass and solid bullet resistant wall materials was constructed inside the lobby to channel visitors to the room. Once inside the screening room, which also has bullet resistant walls, the visitor has belongings x-rayed, and they walk through a metal detector. In the event that anyone was to produce a gun and begin shooting, the incident could be contained inside that room. Once a visitor has been cleared, they proceed into the main lobby via a Boon Edam Tourlock 180 security revolving door. This automatic, four-wing door is the most advanced, security revolving door in the Boon Edam product range that offers maximum throughput, allowing users to enter and leave the building simultaneously. In the event that a large number of persons try to force their way into the facility, the Tourlock 180+90 will determine that more than one person is trying to enter and will reject the person and lock out any others from entering. Once a visitor is ready to leave the lobby and exit the building, they pass through another Boon Edam Tourlock 180+90 that leads to a vestibule with exterior swinging doors. In the event that someone tries to go back into the lobby from the front vestibule area, without going through the security screening room, the Tourlock security revolving door will reject their entry.

Showing 73-104 of 104

Feedback