NBS Source
Jag är en tillverkare

London Bridge Rail Station

ÖVERSIKT

The proven, durable properties of Sika’s high-quality waterproofing system were required to ensure the successful upgrade of one of the UK’s busiest rail terminals.

The multi-million pound refurbishment of London Bridge station – which brings an estimated 56 million passengers into the city each year represents a huge undertaking by Network Rail to create new connections and increase peak hour services by 30%. The project is part of the government-sponsored Thameslink Programme.

Produkter som visas i denna nyhet

Visa alla produkter (209)
SikaDur Combiflex System - Joint And Crack Sealing System

SikaDur Combiflex System - Joint And Crack Sealing System

Sika 1 Pre-Bag Waterproofing System

Sika 1 Pre-Bag Waterproofing System

Mer inspiration från Sika Limited

Visa inspiration
Twickenham Stadium Resin Flooring

Twickenham Stadium Resin Flooring

THE CUNARD BUILDING

THE CUNARD BUILDING

Merry Hill Retail Complex Car Parks

Merry Hill Retail Complex Car Parks

Christ Church URC, Chelmsford

Christ Church URC, Chelmsford

Mer inspiration från Cementbaserade tankfyllnadsbruk

Visa inspiration
Waterproofing a 116-Bed Care Home, London

Waterproofing a 116-Bed Care Home, London

Protecting Christian Dior’s Flagship London Store

Protecting Christian Dior’s Flagship London Store

Waterproofing a Luxury London Hotel

Waterproofing a Luxury London Hotel

Fire Resistant Tunnel Waterproofing, The British Museum

Fire Resistant Tunnel Waterproofing, The British Museum