NBS Source
I'm a manufacturer

"trunking systems and conduits"

7,517 results found

Sort by:

Showing 1-36 of 1223

Sponsored
The Conduit - A Unique Rooftop Dining Experience

The Conduit - A Unique Rooftop Dining Experience

Caribbean Blinds UK Ltd

The Conduit is an existing client of Caribbean Blinds having used our louvered pergolas at their previous club in Mayfair in 2018. Knowing both the benefits of installing louvered pergolas, providing flexible shade and shelter allowing the terrace to be used all year round, therefore providing an important revenue stream for the business along with a unique dining experience for their discerning members along with the service we offer, the Conduit wanted to replicate this at their new club in Covent Garden, albeit on a much larger scale.The new roof terrace, which was on the 7th floor, had a footprint of approx. 300sq/m. The client wanted to cover 2/3rds of this with pergolas, leaving the remaining 1/3rd completely open. The model was to be our Prestige Pod, which they had previously installed, where the louvered roof not only rotates but fully retracts and when closed is completely watertight. A total cluster of 8 modules were required to cover a surface area of c. 200sq/m. The perimeter edges were equipped with screens to offer protection from the elements to the sides. Additionally screens were inserted along with doorways between certain modules so areas could be zoned off for events and private functions. Each module had infra-red heating and festoon lighting installed to create a cosy and pleasant environment year round.A project of this size, requires clear communication, co-ordination and planning. We worked closely with the architect, designer, contractor and end client at every stage, to ensure a seamless process and journey. Site meetings were held with all parties. Full CAD drawings of the structures, positioning and importantly drainage, wiring and post mounting plate positions, which were highly critical as a steel sub frame had to be fabricated and installed and services run were provided. A dedicated project co-ordinator oversaw the entire project to ensure it run smoothly and on-time and in-budget.Like all roof terrace installations there were many challenges, from working at height to access with a road closure required for this project to allow craning of the goods to the terrace. Manufacture from order sign off for the bespoke pergolas was just 12 weeks, with installation taking 2 weeks, via our own trained teams and all in time for a VIP client 4th July party.Anthony Pollak, Facilities Director for The Conduit commented:“Having had a Caribbean blind pergola installation at our previous property we knew the quality of their products.When the opportunity came from our landlord to give us a substantial area to build a roof terrace we knew that we had to include Caribbean Blinds within the design.Installing the Caribbean Blinds pergolas has enabled us to use our roof terrace all year around. In the summer when the weather is good we can open up the space effortlessly and in the winter when the roof is closed, sides are down and heaters on it gives us much needed outside space.From the initial design meetings all the way through to install the Caribbean Blinds team were pleasant and professional to deal with. They made the whole experience very pleasant and straight forward.”To find out more about how we can help you create unforgettable alfresco experiences 365 days a year please contact one of our knowledgeable and friendly team on 0344 800 1947, send us an email projects@cbsolarshading.co.uk or visit our website www.cbsolarshading.co.uk.
Sponsored
Qatar Airways, Conduit St

Qatar Airways, Conduit St

Albion Stone plc

The new building reflects the ideology of Qatar Airways and provides a contemporary office and new retail showroom.The new project replaces two late 1940s/early 1950s buildings.Albion Stone supplied Portland Grove Whitbed in block form which was produced into cladding and installed in a ‘wing’ pat.
Sponsored
Merry Hill Retail Complex Car Parks

Merry Hill Retail Complex Car Parks

Sika Limited

The Purple and Green MSCPs have capacity for more than 4,000 vehicles across five levels. The project’s scope involved concrete repair, structural strengthening using carbon fibre laminates, the replacement of the conduits, movement joints, drainage channels and deck waterproofing.
Sponsored
POWERPOLES AND ODYSSEY BIO FOR COVID-19 TESTING LAB

POWERPOLES AND ODYSSEY BIO FOR COVID-19 TESTING LAB

Marshall-Tufflex Ltd

When a new COVID-19 Lighthouse Laboratory was approved in Plymouth in November 2020, the Government required a quick turnaround to set up the testing facility in order to meet demand and tackle the virus. After its proven success in supplying the Nightingale Hospitals, Totus Engineering specified Marshall-Tufflex PowerPoles and Odyssey Bio trunking to complete the fit out.
Sponsored
Basement Pumping System, Kent

Basement Pumping System, Kent

Newton Waterproofing Systems

Newton System 500 fulfils all Listed Building requirements in this Georgian Manor House. Newton Pumping Systems installed to manage waste water, including two Newton Titan pumps and battery backup systems.
Sponsored
Movawall Systems Ltd - Showroom

Movawall Systems Ltd - Showroom

Movawall Systems Ltd

Take a look at the various systems on display at our showroom based in Clerkenwell, London - including a range of both solid and glass partitions.
Sponsored
Newton System 500 Controls River Thames

Newton System 500 Controls River Thames

Newton Waterproofing Systems

Newton System 500 provides a complete waterproofing solution for a boathouse situated on the River Thames, installed by Newton Specialist Basement Contractor Stonehouse. Newton Waterproofing Systems were contacted to provide a solution for a delightful boat house on the River Thames.The property originally had a wet dock but this had been back filled and capped with a concrete floor. The client wished to use the ground floor as a bedroom, but during a recent flood the water level had reached 500mm internally.Newton System 500 provided the ideal solution, as it works by redirecting the water, rather than trying to hold water back – which would be impossible under such pressurised conditions. Newton 508 Mesh was chosen for the walls, Newton 520 to the floor with a Newton Basedrain ring around the perimeter. Two Newton Titan Pro pump systems were used, which included a battery back up system.Newton System 500 was installed to this property by Newton Specialist Basement Contractor Stonehouse BasementsRather than holding water pressure back, therefore, it was accepted that the river would penetrate the structure and would be pumped out. The system is designed so that ingressing water is depressurised by the Basedrain and then moved around the Basedrain ring to the two Titan sump chambers. The chambers each had 40mm discharge lines exiting the structure. Both pump systems had non-return valves so if the river rose over the level of the pipe the pumps would still be effective.The full waterproofing system was installed in a little over a week. The major test came when the River Thames rose against the property to a depth of over one metre! The Newton System 500 waterproofing system coped with the water ingress as designed. At the height of the flooding, all three pumps in each sump chamber were operational. The system proved to be fully successful.
Sponsored
Triton Systems Specified For Underground Car Park Upgrade

Triton Systems Specified For Underground Car Park Upgrade

Triton Systems

Triton Systems supplied waterproofing systems specified by waterproofing design specialists, Ink Technical Services, for the upgrade to a below ground car park in North London. BS 8102 (2009) recommends the involvement of a waterproofing specialist at the design stage of any below ground waterproofing project. Involving an expert at this stage also minimises the risk of system failure in the future.
Sponsored
Bridglea Pupil Referral Unit

Bridglea Pupil Referral Unit

Boyco (UK) Ltd

"Boyco did an exceptional job of meeting our unique requirements on this project, and it didn’t stop at the initial installation! Boyco’s installers were regularly on hand to find innovative solutions to unexpected problems arising in the challenging environment – in particular children trying to climb on top of the Teaching Walls. I am very impressed with Boyco’s products and service and would recommend them to anybody looking for a bespoke solution for challenging environments." - Diane Hallworth, Bridglea PRUCHALLENGES & SOLUTIONSOn arrival for the installation, Boyco installers found that steel dado trunking had been installed along the Classroom walls, and the electric sockets were mislocated which caused them to clash with the electric source needed for the Teaching Walls. Our installers carried out all necessary remedial work to align the Teaching wall electrical access points to the wrongly positioned sockets on the dado trunking.After successful installation of the Teaching Walls, we were informed by Bridglea PRU that children had been climbing up the side of the Teaching Walls by suspending themselves between the Teaching Wall and the classroom wall–in an attempt to get on top of the Teaching Walls and climb inside the cabinets. Boyco supplied & installed bespoke infill boxes to the corner of the necessary Teaching Walls, to prevent pupils being able to gain any access to the roof of the Teaching Walls.
Sponsored
St Margarets Head Railway Tunnel

St Margarets Head Railway Tunnel

Cordek Ltd

The now disused St Margaret’s Head Tunnel was a structure originally formed as part of the Dunfermline to North Queensferry railway line, providing a link to the ferry service until the opening of the Forth Bridge in 1890 and remaining in limited use for freight until 1954. The vaulted roof and brick lined tunnel is located 15 metres below the A900 trunk road and the B981, adjacent to the northern approach to the Forth Road Bridge. Cordek were asked to supply a structural fill solution, encapsulated within a protective membrane to fill the entire cavity of the tunnel.
Sponsored
Redrock, Stockport

Redrock, Stockport

Berry Systems

Berry Systems helped our client Wates become car park compliant by designing, manufacturing and installing our vehicle restraint systems. A combination of our RB1, Barrier Rail profile and a Bespoke Rectangular Hollow Section system was utilised to fulfil the client’s requirements and exceed their expectations.Redrock is a new leisure facility located in the centre of Stockport which has a 360 space multi-storey car park.Popular restaurants and a cinema now feature in the location to help provide localswith a safe, secure and modern leisure facility where they can relax. Berry Systems were keen to get involved in such a project and help contribute to the development ongoing in the area. Using our expertise of the car parking industry, we designed, manufactured and installed a system that met their requirements exactly.The RHS (Rectangular Hollow Section) System we specified on the project was made bespoke and suited more to their aesthetic needs. We combined the vehicle restraint systems with handrail and mesh to provide additional pedestrian protection. Cladding rails were also created and supplied to support the exterior cladding that was specified on the project. Throughout this project, our client took advantage of our consultancy services to work together to create a solution that was compliant, safe, stylish and  satisfied both parties.
Sponsored
Airports flying high with Schlüter-Systems

Airports flying high with Schlüter-Systems

Schlüter-Systems Ltd

From two of the world’s biggest and busiest transportation hubs at London Heathrow and London Gatwick to other international airports at Bristol, Liverpool and Dublin, specialist products from Schlüter-Systems are ensuring that each is able to cope with the millions of pairs of feet and the millions of trolley and suitcase wheels that pass through their doors each year with flying colours.
Sponsored
ABP Southampton

ABP Southampton

Berry Systems

Supply and installed Wire Rope vehicle restraint system for our client Morgan Sindall on behalf of Associated British Ports in Southampton. Brisafe Wire Rope solution was installed that is affixed to the structural columns of the car park to assemble the unique system with zero footprint, maximising the car park space.
Sponsored
Type C waterproofing system for Notting Hill basement

Type C waterproofing system for Notting Hill basement

Triton Systems

Triton approved contractors, Advance Property Preservation, installed a Type C (BS 8102 2009) structural waterproofing system in the construction of a luxury domestic basement. The property is a late Victorian, six-bedroomed detached home in Notting Hill, London.
Sponsored
Waterproofing vaults (using Type C Systems)

Waterproofing vaults (using Type C Systems)

Delta Membrane Systems Ltd

Vaults are a common feature of 18th and 19th century buildings in Bath. Originally built to support the cobbled streets above and were a constructional response to the precipitous topography that surrounds Bath, in order to provide a level site. Many of the vaults within historic Bath suffer with water ingress and damp related problems. Incorporating best practice guidance - Type C Waterproofing Systems (BS 8102: 2009) a Type C System was used to keep this historic vault watertight and dry.
Sponsored
Schlüter-Systems Hits a Six at Cricket Stadium Hotel

Schlüter-Systems Hits a Six at Cricket Stadium Hotel

Schlüter-Systems Ltd

The Ageas Bowl Cricket Stadium have selected Schlüter-Systems, the market leader in essential tiling protection, to reduce sound transmission in the bathrooms of all 171 guest rooms.
Sponsored
Birmingham New Street

Birmingham New Street

Berry Systems

As part of the development of Birmingham New Street to transform into Grand Central, key infrastructure works were undertaken. Berry Systems installed a bespoke barrier system that was designed, manufactured and installed as per our client's project specific requirements.
Sponsored
Aviva Stadium

Aviva Stadium

Forbo Flooring Systems

Ireland's newest major sporting venue, the inspiring Aviva Stadium, required a fittingly impressive entrance and exit zone aesthetic for its opening year. Accommodating up to 50,000 seated spectators meant issues of safety were key to the specification process, and the entrance flooring system chosen had to be the highest level functionally as well as aesthetically. Fortunately, Forbo Flooring system's extensive portfolio of entrance matting systems offered the ideal products for the job. Robust, smartly attractive and with moisture absorbing qualities for anti-slip safety, Nuway Tuftiguard was used for entrance areas
Sponsored
The Petersham Hotel

The Petersham Hotel

Schlüter-Systems Ltd

Situated in Richmond, Surrey and overlooking the River Thames, the Petersham Hotel undertook a refurbishment of the Tower suite to ensure an unforgettable visit alongside the equally picturesque views. Tile and stone protection experts Schlüter-Systems were on hand to provide a level entry system solution for the bathroom of this stunning area of the hotel.
Sponsored
Westfield Broadway, Bradford

Westfield Broadway, Bradford

Berry Systems

Berry Systems carried out works for Westfield for The Broadway shopping centre in Bradford, West Yorkshire. Our spring steel posts and a selection of our industrial items were utilised to provide effective barrier protection. The Broadway is a shopping and leisure complex located in Bradford, West Yorkshire that is home to both high street and luxury brand outlets. Built in 2015 by the Westfield Corporation, it houses over 1,000 car parking spaces for customers to visit the complex with ease. Because of this, sufficient car park protection was required to create a safe parking facility. Berry Systems delivered an effective vehicle restraint system solution to ensure the site was compliant and met legislation. For this project a spring post system was utilised as it has a single anchor fixing and a small footprint so it doesn’t encroach into the parking bay. This was of great benefit to the client as we were still able to deliver superior protection, without affecting the amount of car park spaces required. We also paired the spring post system with handrail and mesh to increase the level of protection for pedestrians. Additional items, such as our height restrictors and wheel guides, were installed from our industrial range to help reduce speed and prevent unwanted access to site.
Sponsored
Leaseplan

Leaseplan

Forbo Flooring Systems

Forbo Flooring Systems' unique and comprehensive product portfolio has brought to life a striking new refurbishment project at Leaseplan UK, Berkshire, where a wide range of Forbo's textile and resilient products have been specified as part of an exciting modular flooring solution. Flooring contractor: Crisp Designed Ltd
Sponsored
Neoworks

Neoworks

Forbo Flooring Systems

The vibrant colours of Forbo Flooring System's Marmoleum Modular portfolio led the interior designers HLW, to specify the floor covering to distinguish different working areas within London- based company, Neoworks. By creating an array of bright colours in an elaborate zigzag design, HLW has managed to produce a sophisticated but lively office interior.
Sponsored
Bespoke Shower Cubicle System for JP Morgan - Canary Wharf

Bespoke Shower Cubicle System for JP Morgan - Canary Wharf

Concept Cubicle Systems

JP Morgan is one of the largest investment firms that reside at Canary Wharf. They had a requirement for premium commercial shower cubicles for their staff. Glass and chrome was to a play a key features into the shower design, and we created a bespoke cubicle system to meet their requirements. Read the full case study on our website.
Sponsored
Home / Blog / Noise Reduction within Flue and Chimney Systems

Home / Blog / Noise Reduction within Flue and Chimney Systems

Schiedel Chimney Systems

The first thoughts about safety at work are always about physical injury prevention as well as inhaling fumes, hazardous substances, etc. However, Occupational Noise, which is the amount of acoustic energy received by an employee of a company, can cause permanent damage if it is continuous.In the UK, The Control of Noise at Work Regulations 2005, came into effect for all industries from April 2008, which is quite late when you consider that the harm hearing loss can cause. Harm such as Tinnitus, which is the perception of noise in the ear or head, caused by a problem with the inner ear.The sustaining of high noise levels can also mask warning signals, prevent concentration and vital communication.Most authorities around the world have agreed that noise becomes dangerous when it’s higher than 85 decibels during a typical 8-hour work shift. However, noises under 85 decibels can also cause issues with the general public who are in and around the working environment.An example below shows the different examples of noise levels in decibels – the definition of noise is sound that is unpleasant or causes disturbance.ReductionIf a noise can’t be reduced by engineering the equipment, then acoustic quieting is required. This is the process of dampening vibrations from machinery and systems such as flue systems.With the increasing demand for noise attenuation, the demand for noise reduction from flues and chimneys in marine and industrial situations mean that many companies have developed their own silencer programmes. These tend to be combined with flue systems to have a product range which is reducing sound at the design stage
Sponsored
AUTOMATIC SYSTEMS INSTALLS NEW FIRSTLANE AND ACCESSLANE INTO HOUSING ASSOCIATION PROJECT

AUTOMATIC SYSTEMS INSTALLS NEW FIRSTLANE AND ACCESSLANE INTO HOUSING ASSOCIATION PROJECT

Automatic Systems UK & Ireland

Automatic Systems was asked by Aspex UK Limited to work with them on a project they had won at the head office of Riverside Group.Riverside is a group of complementary businesses driven by a clear social purpose, with a charitable housing association at its core.Established over 90 years ago, they have grown to become a major provider of affordable housing, care and support services in England and Scotland, with almost 56,000 homes in management. Operating at scale and across 160 local authorities, their vision is to transform the lives of the 90,000+ people they house and revitalise the neighbourhoods in which they live.RiversideGroup approached Aspex as a result of Covid to help secure and control the access of their head quarter building.SOLUTIONWith the help of Automatic Systems Aspex came up with a solution that fulfilled their criteria. This included the installation of the newly launched Firstlane and AccessLane.WORK TIMEFRAMEHaving worked with Aspex on a number of previous projects Automatic Systems were the preferred supplier when the contract was won in December 2020. Works took a week to complete as allocated in February this year.FUTURE WORKAutomatic Systems looks forward to working with Aspex on future projects.
Sponsored
Potter Building, Slough

Potter Building, Slough

Berry Systems

Berry Systems completed works on behalf of our client, Bowmer & Kirkland, to deliver effective bespoke edge protection. We also installed rubber column protection and specialised bridge walkway pedestrian barrier to meet their specification requirements.The Porter Building houses 110, 625 square feet of office space for companies to utilise. It is conveniently situated in Slough with excellent transport links to key areas in London and the surrounding cities. The building itself has 100 car parking spaces and 100 bicycle parking spaces for employees and visitors to use. We were tasked with installing edge protection and vehicle restraint systems in the building to ensure both vehicle and pedestrian safety.The system installed was a perforated aluminium edge protection combined with buffer baseplates and mullion attached. This was designed in house by our design team to combine the two products delivering a compliant system meeting BS EN 1991-1-1 standards. Our team also designed the specialised bridge walkway pedestrian barrier to increase pedestrian safety on site. This particular project demonstrates our ability to design VRS solutions bespoke and being able to accommodate additional client requirements. In all of our projects, we work with our client to ensure that safety is the ultimate priority and the necessary industry standards are met.
Sponsored
Historic London hotel specifies complete package from Schlüter-Systems

Historic London hotel specifies complete package from Schlüter-Systems

Schlüter-Systems Ltd

Schlüter-Systems have become part of a historic refurbishment which will see the grand Chancery Court Hotel, London, a 1914 Edwardian heritage property, revamped with elegant and contemporary bathroom suites.
Sponsored
Beechview Drive

Beechview Drive

Licata Building Systems Ltd

Beechview Drive is a development by MD Constructions Ltd consisting of 8 brand new, luxury detached family houses set in a secure gated development. Each comprising 5 bedrooms, 3 bathrooms, stunning kitchen diners and integral double garages. Licata Building Systems supplied full silicone render systems and clay brick slips systems for the facades of the houses. The combination of the two finishes created a modern style to the development. Full Licata waterproofing systems were used in the bathrooms of the properties and were also finished of with high quality premium Italian porcelain tiles supplied by Licata.
Sponsored
Wick Tower

Wick Tower

Licata Building Systems Ltd

Wick Tower is an iconic building for the locals which lay derelict for 20 years. Licata Building Systems was part of the process to bring Wick Tower back to life. Our silicone render system was used to create an aesthetic façade finish. The render system used maintains it’s clean fresh look for many years to come due to its self cleaning properties and will protect the structure from moisture.
Sponsored
Starbucks, Llanelli

Starbucks, Llanelli

Senior Architectural Systems Ltd

A selection of our high-performance aluminium fenestration solutions has been used for this new café and drive-thru at a popular shopping destination in Wales.The new Starbucks at Parc Pemberton Retail Park has been designed by G1 Architects and built by Trojan Construction, with the aluminium fenestration package skilfully delivered by specialist contractor Sherwood Aluminium Systems.The project features both our cost-effective SCW aluminium curtain walling and our robust SFG shop front glazing system, which are both ideally suited for use in the retail sector as they combine slim sightlines with a robust and durable construction. Our curtain wall system has been used to create a bright and airy interior in the café, and the SFG system has been integrated with our SD aluminium doors to provide safe access at the entrance and exit. Our SD aluminium commercial doors have also been used on the drive-thru building, with the powder-coated aluminium frames perfectly complementing the use of timber cladding and grey façade design.The new Starbucks outlet has benefited from both Trojan Construction and Sherwood Aluminium Systems’ extensive experience undertaking similar schemes for the retailer across the UK, with Sherwood Aluminium Systems named as a preferred supplier for Starbucks.
Sponsored
Epwin Window Systems - MORE Options - MORE Possibilities

Epwin Window Systems - MORE Options - MORE Possibilities

Epwin Window Systems

Working with Epwin Window Systems on any project can be like a breath of fresh air. Putting it simply, our experience & expertise in commercial projects counts. We’ll save you time & money, we’ll always work for the best overall outcome. We know that you’re the construction experts. Our job isn’t to tell you what to do. It’s to help you do what you do best, more economically & more efficiently. Simplifying the task of installation, reduce site damage & cut down on survey times while delivering the right windows & doors for all your projects. Call us.
Sponsored
Aggreko, Dumbarton

Aggreko, Dumbarton

Berry Systems

Berry Systems supplied and installed Internal and external vehicle safety barriers at new Aggreko, Dumbarton plant to protect; doorways, walkways, columns, site and equipment.Aggreko PLC, the world leader in the field of power and temperature control rental, has become the first company in the UK to have Berry Systems’ new Stopbollards installed at its new 170,000 sq ft Dumbarton facility.The many, internal and external vehicle doorways at the brand new Dumbarton site were identified very quickly as needing special protection. Glasgow architects Bradford Robertson considered a number of options before concluding with main contractors, Morgan Sindall, that our SlowStop bollards would prove a cost effective solution. During a collision, the kinetic energy of the impact is progressively absorbed as the post tilts, compressing an elastomeric sleeve within the base. The post is able to tilt from its vertical position to an angle of 20 before it locks within the base. After the impact the post will return back to its vertical position, ready to perform once again. A total of 104 SlowStop bollards were installed at Dumbarton, along with a variety of other products from our range.https://berrysystems.co.uk/wp-content/uploads/2024/03/Berry-Case-Study-Aggreko-Dumbarton.pdf
Sponsored
London Heathrow Airport

London Heathrow Airport

Berry Systems

Berry Systems supplied and installed perimeter and ramp barriers for new multi-storey car park incorporating very thin  concrete decks.A revised design for the new Heathrow Terminal 2 multi-storey car park called for a floor depth of just 150mm comprising a 60mm deep slab with 90mm structural topping. However, and there’s always a however, a traditional rigid safety barrier post needs fixing with 4 bolts each to a depth of 170mm. Obviously these couldn’t be used,so contractors Laing O’Rourke turned to barrier specialists Berry Systems to provide a solution and appropriate perimeter barriers for the 6 decks and the spiral entrance and exit ramps.Over many years Berry Systems have developed a range of flexible spring steel barriers that ‘give’ on impact. This not only reduces damage to both the barrier and an impacting vehicle but crucially reduces the pull out loading on the anchorage by 50% or more. This in turn allows post fixing to be achieved by using only a single bolt embedded to a depth of merely 110mm - a depth achievable into the new slabs.The specification was completed with Berry Beam safety rails to provide a more attractive appearance than the well known “Armco” style. Post extensions provided mountings for a pedestrian handrail at 1100mm high with integral anti-climb mesh where needed.The thin slabs were developed by Bison Manufacturing and are the thinnest precast concrete planks produced to date in the UK. They led to many benefits which considerably reduced the construction programme. It also allowed 6 floors in the usual height of 5, increasing capacity to 1340 spaces. But perimeter protection would have proved problematical without the expertise of Berry Systems.
Sponsored
A facelift for the skyscraper foyer - Automatic Systems - International

A facelift for the skyscraper foyer - Automatic Systems - International

Automatic Systems UK & Ireland

The Skyper building complex in Frankfurt am Main boasts a very special architecture. The three-part complex – consisting of the 153.8-metre Skyper high-rise with 39 floors, the neoclassical Skyper Villa from 1915 and the Skyper Carrée – offers a total of 53,900 m2 of office space for numerous companies and banks. When the existing single access entry systems were dismantled in the summer of 2020 as part of renovation work on the foyer, the owner opted for a new, modern solution that would blend in perfectly with the architecture of the skyscraper. Every day, large numbers of people go the foyer to get to their workplace. Numerous visitors also pass through this area. This called for a solution combining functionality, safety and an appealing design.
Sponsored
Cala Homes

Cala Homes

Eagle Automation Systems Ltd

Eagle have completed another successful installation for Cala Homes at Sandy Lane Cobham. The installation consisted of 2 sets of electric gates and intercom system to the houses. Compliance with latest directives is essential so these gates were force tested and issued with a declaration of conformity. Eagle support all installations and are able to offer a 24hour emergency call out to offer peace of mind in the unlikely event something should go wrong. In the event of power failure all systems can be manually overridden. All systems are supported with CAD drawings and cabling requirements for intercoms and access control
Sponsored
Remedial Basement Waterproofing

Remedial Basement Waterproofing

Delta Membrane Systems Ltd

When it comes to residential, commercial or any structure below ground, waterproofing is a critical component within the construction process for protecting and preserving a building. A poorly designed or installed waterproofing solution can fail leading to significant implications on the structure itself.Delta Registered Installers, Abtech (UK) Ltd were called upon to give assistance on a particularly technically complicated project where approaches to waterproofing design and installation had been incorporated, however the system had failed. For a great remedial waterproofing outcome, seek assistance from an experienced waterproofing company to inspect your site and carry out the remedial work.The property when built had a Type C, cavity drain membrane systems incorporated (not a Delta System), however there was no basement drainage incorporated into the design to manage water ingress.In principle a Type C, drainage system is a water management system. The Type C system is used to control water ingress once it has penetrated the structure.  Moisture or running water travel behind the Type C membrane within a controlled drainage system. A Type C System isn’t classified as a barrier but provides protection by means of water management. For a Type System to be successful a suitable drainage system is required to collect and discharge water ingress to a suitable and safe evacuation point (either by natural forces or a mechanical pump system).When correctly installed, groundwater drainage channels effectively relieve hydrostatic water pressure in the below ground structure. They are installed below flooring membranes at the floor/wall junction.

Showing 1-36 of 1223

Feedback