NBS Source
I'm a manufacturer

"steel structures"

5,305 results found

Sort by:

Showing 1-36 of 1129

Sponsored
Weight saving structural concrete for hotel rooftop extension

Weight saving structural concrete for hotel rooftop extension

Tarmac

The challenge was to construct a roof top extension on top of the luxury hotel NOBU in Shoreditch. The plan was to add an additional 1 storey of hotel rooms, suites, dining areas and open terraces that would replace the existing planted roof. The chosen solution was Tarmac Toplight C lightweight structural concrete in a pump mix with the addition of steel fibres, ensuring maximum weight loss of 35% with no compromise on structural concrete performance.By adding steel fibres into the lightweight mix the composite metal deck system could be installed without the need for traditional expensive and slow steel reinforcement across the deck. The use of lightweight concrete, furthermore, reduced the load by 35% which meant the existing structure did not need to be reinforced or under pinned. The construction programme time was also reduced considerably.
Sponsored
Lightweight structural concrete for composite metal deck floor extension

Lightweight structural concrete for composite metal deck floor extension

Tarmac

A complete rework of a postmodern office building (60 London Wall), situated in the heart of the City of London. The project aim was to extensively refurbish, reconfigure, reinvent and reposition the building.Due to the addition of a composite metal deck floor extension and additional steel frame for the top floors, Tarmac’s Toplight C lightweight structural concrete was seen as the perfect solution as it could be pumped and ensured a weight loss of 30% whiel maintaining the necessary structural performance.
Sponsored
Robinson Structures

Robinson Structures

Komfort Partitioning Ltd

Polar double-glazed partitions provided the ideal solution for dividing space in a clever and minimalistic way. The double glazed Polar partitions have impressive acoustic thresholds of up to 49dB (Rw), which is becoming more and more essential in today’s working environment. Providing opportunity for both communicative and inspired work, Polar double glazed’s simplistic method of installation, demountability and powerful acoustic properties makes it an intelligent option for modern offices. Due to Robinson Structures engineering expertise, steel girders were built above and around the Polar single glazed track work to create smaller offices and meeting rooms.
Sponsored
Moto Services, Rugby

Moto Services, Rugby

Tata Steel

A long-awaited motorway service area on one of the countries busiest junctions - north of Rugby, at Junction 1 of the M6 - opened at the end of April 2021, bringing confidence to hauliers and logistics companies to make the switch to electric vehicles with provision of 24 ultra-rapid electric vehicle charging points.Around 3,500m2 of Tata Steel’s RoofDek D159 structural decking was used to form the support structure for the standing seam roof of the service areas main amenity building.
Sponsored
AIRIOS IN VELDHOVEN, THE NETHERLANDS

AIRIOS IN VELDHOVEN, THE NETHERLANDS

Tata Steel

The combination of a lightweight steel and concrete composite ComFlor® 100 slab and a glulam timber beam structure has helped deliver a truly sustainable three-storey office building. The internal climate in the building is supported with a ComFlor® Active system in the roof slab.
Sponsored
Burj Khalifa

Burj Khalifa

Tata Steel

ComFlor 80 has played its part in the creation of a strong and efficient solution making the Burj Khalifa the worlds tallest and arguably most iconic building.Over 45,000m³ of concrete weighing more than 110,000t, were used to construct the concrete and steel foundations, which feature 192 piles buried more than 50 metres deep. 4000m² of ComFlor 80 was used in in the floor construction installed to the very top of the 828 metre spiral structure.
Sponsored
TATA Steel, Port Talbot

TATA Steel, Port Talbot

AluK (GB) Ltd

The BREEAM Outstanding visitor and heritage centre at Tata Steel’s factory in Port Talbot, South Wales is a showcase for AluK’s SG52 and SL52 stick curtain walling systems.The thermally broken systems were used at various points around the £12m development, which is located at the main entrance to Tata Steel’s 16km2 site also houses stores and training facilities.AluK’s structurally bonded SG52 system was used for the expansive glass façade that dominates the front of the main building, while our capped SL52 system was used for the smaller sections at the side and rear with doors and opening lights incorporated.
Sponsored
Stainless steel column casings at UCL East Campus

Stainless steel column casings at UCL East Campus

Pendock

Brushed stainless steel column casings from the Pendock Radius range are being used to conceal structural steelwork at University College London’s East Campus at Pool Street on the Queen Elizabeth Olympic Park, Stratford.Each of the 12 column casings, which are 775mm in diameter and range in height from 3215 to 3370mm, are installed in four external locations on the third level of the university building’s two towers, which function as student relaxation areas.As the column casings are exposed to the elements, their stainless steel construction is an ideal solution as they’re weather resistant, virtually maintenance free and highly durable.
Sponsored
ACTIVE OFFICE/ACTIVE CLASSROOM, SWANSEA

ACTIVE OFFICE/ACTIVE CLASSROOM, SWANSEA

Tata Steel

Located at Swansea University’s Bay Campus, and designed and constructed by SPECIFIC Innovation and Knowledge Centre, the Active Office and Active Classroom are both designed to be energy positive buildings, capable of generating more solar energy than they consume during a typical annual cycle.The Swansea area of South Wales is synonymous with steelmaking as Tata Steel’s Port Talbot steelworks is just a few miles away from the Bay Campus. For this reason, SPECIFIC wanted to use steel as much as possible on these structures and so a Tata Steel wall and roof cladding system was chosen using Colorcoat Prisma® pre-finished steel, all made in Wales.The Active Classroom also feature Tata Steel’s Colorcoat Renew SC® transpired solar collectors, The system captures heat from the sun and draws it into the building through a microperforated collector on the exterior of the building. Heated fresh air from the cavity is then used as a pre-heater to the main heating system. A transpired solar collector can collect around 50% of the energy falling on its surface, which equates to approximately 500wp/m2 of the collector’s surface area and can deliver around 250KWH/m2per year or up to 50% of space heating requirements.
Sponsored
TOVI ECO PARK

TOVI ECO PARK

Tata Steel

 Mechanical Biological Treatment (MBT) facility that treats all of the residual household waste generated in Essex and Southend. To meet the structural design criteria of the contract, a very strong roof profile was required. To ensure fully effective sealing, this had to be a plain sheet without stiffening ribs. The requirement was met by a specially modified Trisobuild® R60 roof profile in a higher strength steel. The modified Trisobuild® R60 solution spans 2.65m. Tata Steel altered its production tooling to manufacture 26,000m2 of the modified R60 roof profile in double-sided Colorcoat HPS200 Ultra®.Colorcoat HPS200 Ultra® was chosen to optimise protection against the corrosive internal environment and external weather side of the bio-stabilisation halls. Super durable Colorcoat HPS200 Ultra® provides exceptional corrosion resistance which has been proven in natural and accelerated testing. Colorcoat HPS200 Ultra® exceeds the requirements of CP15 (as per EN 10169.2010), demonstrating excellent barrier properties when used internally.Images courtesy of UBB (Essex) Construction JV.
Sponsored
Culture Centre, Greece

Culture Centre, Greece

Nullifire – a brand of Tremco CPG UK Ltd

Designed by architect Renzo Piano, the new Stavros Niarchos Foundation Cultural Centre (SNFCC) in Athens has created homes for the National Library of Greece and Greek National Opera, which include a 1,400-seat auditorium. With significant steel structures involved, Nullifire SC902 Fast Track, On-Site Intumescent Steel Coating was used extensively to provide passive fire protection.
Sponsored
Phipp Street

Phipp Street

Canal Architectural

This straight feature stair and glass bridge is located in a spacious office in the heart of London. The mild steel structure accentuated the urban feel of this commercial space. The laser cut risers came complete with brass nosing inserts for a contemporary appearance and completed with a wax finish.
Sponsored
iDecking Project - Finchampstead, Berkshire

iDecking Project - Finchampstead, Berkshire

Wallbarn Ltd

This 115m² project was a large luxury new-build. The decking required two distinct build-up methods around the house. One section was on a waterproofing membrane, the other on a steel framed walkway. Adjustable support pedestals were loose-laid onto the membrane. iDecking aluminium rail system was set onto the pedestals and EasyClick boards were clicked into place. Pedestals lifted the decking structure off the membrane allowing free drainage and creating a level surface on the falling roof. Aluminium rails were mechanically fixed to the steel structure and the whole terrace was set to one, seamless level wrapping around the house.
Sponsored
St Peter's Square, Manchester. Point Loaded Stainless Steel Tree Grilles

St Peter's Square, Manchester. Point Loaded Stainless Steel Tree Grilles

Architectural Street Furnishings part of WB White Foundry

ASF were asked to manufacture tree grilles in the design of the ASF 3000 in stainless steel, but with structural design and calculation attached that met an 8 ton point loading, so that the grilles would be suitable for drive over by 15t+ street cleaners. ASF worked with site and our own structural engineers to produce grilles that met and exceeded the required standards.The top 'face' of the grille bars were also castellated to increase grip on the surface of the grilles.The grilles also hosted large uplighters that also allowed for an 8t point loadingThe grilles were manufactured in grade 316 stainless steel to these standards and finished passivate dipped, offering a stable finished patina that will last for many yearsThe grilles were manufactured to these standards
Sponsored
Outdoor A5000 Home Platform Lift to Access Pool Deck

Outdoor A5000 Home Platform Lift to Access Pool Deck

CIBES Lift UK

The first platform lifts is placed adjacent to the pool deck, linking the underground levels to the outdoors. A customised glass and steel structure protects the lift from weather exposure, whilst maximising on the stunning sea views. The A5000 was a great choice to provide accessibility, luxury and ease of installation at this seaside residence.
Sponsored
Corten Steel Louvres chosen to match Heritage Site

Corten Steel Louvres chosen to match Heritage Site

Lang+Fulton

Ashton Old Baths is a Grade II listed building which Tameside Metropolitan Borough Council has transformed into a business hub and data centre; an idea for heritage sites which could be transferred to many other ‘at risk’ buildings.The primary concern for the project was to create a sympathetic dialogue between the historic and the modern.Lang+Fulton were approached by the architect to provide an appropriate solution for a compound to surround and screen the unsightly sub-station, data centre generators, and cooling plant that were required to service the new complex. Their Corten louvre, made from weathering steel was selected to match the tonal qualities of the original red brick façade of the Victorian bath house and preserve the sensitive context of the site. The Italia-Corten panels sit between an expressed steel framework, which was hot-dip galvanized before polyester powder coating in a dark grey to reference the regeneration of the site to the area’s industrial past. The continuous structure creates 80% visual screening and the robust steel louvres provide excellent security.The compound was supplied with double-leaf and tri-fold gates to provide the required access.
Sponsored
Shanghai Tower - Interchar 1983 - Infrastructure

Shanghai Tower - Interchar 1983 - Infrastructure

International®, brand of AkzoNobel

Essential Protection for Tall Buildings.As one of the world's leading coatings companies, we strive to be at the forefront of design trends and our International range of protective coatings and passive fire protection products is developed to complement architectural innovations.With its curved façade and spiralling form symbolizing China’s emergence as a global financial power, the Shanghai Tower is world's second tallest building (behind Burj Khalifa in Dubai), after its six-year construction was completed at the end of 2015.Shanghai Tower is one of the most advanced sustainable tall buildings in the world and goes to great lengths to generate its own energy.Around 200,000 liters of our protective coatings and intumescent fire protection products, including Interchar 1983, were used to provide fire protection for stair steel structures and the façade’s supporting steel structures for up to 90 minutes.We were the company of choice for the owner, painting applicators and the fabricator.
Sponsored
Backstage ² Upkot student flats - gratings

Backstage ² Upkot student flats - gratings

Elefant Gratings T/A PcP Gratings Ltd

The ancient printing house of “De Vooruit” in the Center of Ghent, was completely stripped to only the ancient concrete supporting structure. From there the renovation to an ultramodern student home was to be made with steel, providing safe stairways, safe and easy to walk on platforms, as well as outside sitting areas for the students. This was all to be made in aesthetical harmony with other products, such as COR-TEN steel that was used in the project. This to create a modern look, aspiring to the students.The project criteriaPcP had to meet the criteria for a sustainable, durable product which was safe and comfortable to walk on. At the same time, the product needed to blend in well with the COR-TEN steel being used for other parts of the project, providing a modern look that would appeal to students. Another challenge was installing the new steel structure onto the existing concrete supporting structure of the original building.The solutionLannoo Konstruktie chose the OPTIMO® O2, Spiral treads – Type K and panels, as these high-quality products met all the stated requirements for the new student accommodation building. In addition, it was a bonus that the OPTIMO® O2 perforation is easy to walk on in all types of shoes, and is even suitable for outdoor furniture, such as tables and lounge chairs.“The strength-to-weight ratio of the PcP solution is very favourable. This was very helpful for us, as we had to mount the new steel structure onto the old concrete supporting beams. It was important to have a light but very strong panel and steps. PcP was ideal for this purpose.”– Christophe Lannoo, CEO, Lannoo KonstruktieThe resultThe ancient printing house of ‘Dagblad Vooruit’ in the centre of Ghent was completely stripped back to its concrete supporting structure. The structure was then developed to create ultramodern student accommodation using steel with safe stairways, safe and comfortable platforms as well as exterior seating areas for students. This work all harmonised aesthetically with the other building materials, such as the COR-TEN steel used in the project. The aim was to create a modern and inspiring student residence.Architectural steel platform and spiral stair treadsThe project lasted a total of five months from first production to final installation of the panels and steps. In total, 150 spiral K treads were used for three spiral stairs on the three-storey building. More than 100 OPTIMO® O2 treads were installed, together with almost 300 square metres of OPTIMO® O2 panels, both standard and customised. For Lannoo Konstruktie, it was a very attractive project to be engaged in, and likewise for PcP, which is used to projects which are more industrial in nature.
Sponsored
Alexander Stadium

Alexander Stadium

Johnstone's Trade Paints - a brand of PPG Industries

Alexander Stadium, a 41-acre athletics venue located in Birmingham and home to the 22nd Commonwealth Games was redeveloped to create a world-class venue for diverse sporting, leisure, community, and cultural events.PPG Johnstone's Trade coatings were used to update the internal and external exposed steel structures and the stadium’s different walking and circulation areas including the concourse areas.
Sponsored
White Magnolia Plaza

White Magnolia Plaza

Jotun A/S

As a sign of the Bund Renaissance, White Magnolia Plaza stands on the side of Pujiang River in Shanghai, towering 320 metres, making it the number one skyscraper in the Puxi district. This imposing building and its steel structure demanded exceptional anti-corrosion solutions, ensuring ‘bone health’ of the new landmark in the North Bund. Jotun had the coating technology to make this happen.
Sponsored
Community High School, Cardiff

Community High School, Cardiff

Nullifire – a brand of Tremco CPG UK Ltd

To ensure the safety of students, Sharpfibre Limited installed passive fire protection via Nullifire products. The intumescent paint Nullifire SC902 was applied in order to protect the outer steel structure from the potential effects of the fire. Thanks to its high coverage potential, the option of applying the required thickness in a single application, and its fast curing, the Nullifire SC902 was able to significantly accelerate the project process.
Sponsored
The Treptow Medical Centre

The Treptow Medical Centre

Schöck Ltd

Schöck solution combines architecture with horticultureThe striking facade of this building in Berlin is the concept of Sergej Dott, a locally-based pop art painter who chose medicinal herbs to represent the building's use as a major medical centre. The Treptow Medical Centre, named after the district in which it is located, is a 19th century listed building and recent refurbishment work has seen the interior transformed into twelve surgeries and a pharmacy. The final flourish of the restoration activity is the addition of the pop art herbs, each one metre in diameter, up to twelve metres high and 600kgs in weight, all grouped around three sides of the building.To incorporate them into the structural design, additional steel beams had to be installed inside the building at varying floor levels and Lorenz Linnhoff, whose engineering firm carried out the structural planning for the building comments: "The optimum solution for fastening the giant flowers to the building envelope was the Schöck Isokorb® T type S, which made it possible to transfer the load of the flower installation via the steel beams to the load-bearing building".The Isokorb® T type S has been developed to create thermal breaks in steel structures, where the modules are used to transfer tensile forces and pressure/shear forces. With this application the product is used only for the latter purpose, as on this occasion it has to perform a structural function rather than ensure thermal partition. Each flower is connected by two T type S modules at the top of the stalk and their modular capability meant that off-site pre-fabrication was possible, helping to reduce on-site costs. Two head plates were welded to the stalks off site and another two head plates attached to the main steel structure with the T type S modules bolted to them. Then flower stalk was then lifted into position and the two plates simply bolted to the exterior connections of the T type S units. The community arts and culture scene in Treptow will benefit too, as each of the herbs is to be sponsored, with the proceeds donated to various art institutions.
Sponsored
Successful Installation of a Home Lift in a Private Home in Johannesburg

Successful Installation of a Home Lift in a Private Home in Johannesburg

Vimec SRL

Vimec, partnered with a trusted local home lift installation specialist to successfully install a home lift with 2 stops in a private home located in Johannesburg, South Africa. The project involved the integration of a white steel structure and a cabin with two glass walls, resulting in a seamless and elegant addition to the homeowner’s residence. This case study highlights how Vimec’s partner effectively addressed the client’s needs and exceeded expectations.
Sponsored
Wright Place

Wright Place

Schöck Ltd

Outdoor life tends to take place inside the perimeter of block buildings in towns and cities. An inner courtyard becomes the outdoor area of choice, shielded from the noise from the roads that surround the building. The Wright Place project involved the installation of 60 balconies that were also planned as design elements. Schöck Isokorb® type KS was used for both structural stability and thermal insulation.Precast balconies as design elementsA total of 300 Schöck Isokorb® elements – between four and six per balcony, depending on size – were installed in the building structure, with some welded to the reinforcement to prevent tipping during concrete application. The Isokorb® used was type KS from Schöck's standard range, which functions as a load bearing thermal insulation element, eliminating thermal bridges between reinforced concrete and steel structures and thus preventing mould formation at the critical joints. The Schöck Isokorb® allows steel and metalworkers to prefabricate to a large degree, thus reducing installation times to a minimum. Its superb load bearing capacity offers enormous scope for balcony design while ensuring outstanding structural stability.
Sponsored
The Rowe, London

The Rowe, London

Keim Mineral Paints Ltd

The Rowe is a new architecturally designed office space in Whitechapel London, where tradition meets innovation. With outside space on every level, the building sets a sustainable benchmark for new office space in central London. The new elements mimics the horizontal banding of the 1960s concrete building as well as contrasting with a steel structure and dark metal palette.The architects, Allford Hall Monaghan Morris, had used KEIM previously. They contacted KEIM as they wanted a sustainable product in keeping with their core values. Samples were carried out, as shown in the photo below, to determine the most suitable colour.First off, KEIM Concrete Repair Mortar (KEIM Concretal-MR 2.0) was used for large repairs within the concrete. KEIM Fine Finishing Mortar (KEIM Concretal-FSP 0.2) was then used for levelling repairs as it is a much finer aggregate mix.KEIM Soldalit CL018, a light grey colour, was chosen to compliment the steel structure and due to its characteristics, was applied onto the previously painted surface without the need for a primer. It is fire resistant – A2-s1, d0 classified and Cradle to Cradle certified.The Rowe has been shortlisted for an AJ Retrofit Award 2023 in the Workspace (£10m and over) category. It was also awarded BREEAM ‘Excellent’, WELL ‘Platinum’ and received SmartScore certification.
Sponsored
SAMMY OFER CENTRE

SAMMY OFER CENTRE

INTRAsystems

The transformation of the iconic old Marylebone Town Hall into a major new facility for the London Business School was taken on by Sheppard Robson Architects. Sammy Ofer Centre is a great educational institute now even so with better facilities for students to learn in. A building with such a heritage deserves the best entrance. This is further enhanced by the glass and steel structure that creates a clear distinction between the two building. As a result, we could not be prouder in installing our most flagship Entrance Matting to prevent the ingress of dirt and moisture into the building.
Sponsored
Protecting the groundbreaking O2 tidal energy turbine

Protecting the groundbreaking O2 tidal energy turbine

Hempel A/S

A significant milestone for not just the tidal sector, but for the development of renewable energy technology, Scottish engineering company Orbital Marine Power, Ltd. (Orbital) will soon launch the Orbital O2 – the world’s most powerful tidal turbine – in the waters off the Orkney Islands.We have been involved in the project since Orbital’s prototype SR2000 turbine was built in 2015, proving their technology and leading the way for the further optimised O2. As well as high-performance anti-corrosion coatings to protect the steel structure, we supplied Hempaguard X7 for the turbine rotor blades.
Sponsored
Ping An Finance Center

Ping An Finance Center

Jotun A/S

Ping An Finance Center is an iconic 115 story skyscraper in Shenzhen, China. Reaching 600 metres high, this striking building was completed in 2017, making it the world’s fourth tallest building and the second tallest in China. Jotun was chosen as the single source provider due to our long track record of multi-divisional, complex projects. Jotun Protective Coatings and Powder Coatings were specified to protect the steel structure and façades. An ideal choice, confirmed by both the contractor and applicator, due to Jotun’s consistent application properties under varying environments and construction conditions.
Sponsored
Private apartment building in Denmark features Easy Glass Slim glass balcony railings

Private apartment building in Denmark features Easy Glass Slim glass balcony railings

Q-railing

Skolegade, a street in the Danish city Aarhus, is known for its interesting restaurants, pubs and characterful timber-framed homes. A brand new three storey apartment building was added to the street. The spacious apartments each have access to an ample balcony surrounded by an Easy Glass Slim full glass balustrade. These balustrades allow maximum visibility of the building’s facade, with its striking steel structures. Easy Glass Slim was installed without making any special adjustments to the existing design. The back of the building features Q-railing Juliet balconies.
Sponsored
Multi use playground canopies

Multi use playground canopies

Zenith Canopy Structures

Highfield South Farnham Primary School contacted Zenith as they were in need of a canopy structure for their play area that could be used for additional outdoor learning space as well as a play area.
Sponsored
Automotive Steel Store

Automotive Steel Store

Tata Steel

The buildability and speed of installation was one of the reasons we chose this composite panel system from Tata Steel. Using the Trisomet system also meant we could select the optimum insulation thickness for enabling control of the internal climate of the building.
Sponsored
Structural Repairs- Office Archway Restoration

Structural Repairs- Office Archway Restoration

Stonehealth Ltd

Structural Repairs’ office space was beautifully and seamlessly integrated into one of Windsor’s iconic train station arches. This newly built office space boasts from its impressive structural logistics and boldly featured decorative and themed memorabilia at many of its cozy corners.Via a combination of the fire grit machine, TORC system (seen in the images and videos), water by pressure and a DOFF system, the carbon accumulated in the brickwork was removed. These methods, especially the DOFF system, work with high-pressure stream and extremely high temperatures.Brick cleaning is an arduous and labor intensive process by which a brick masonry, also known as a layer of brick which has been laid on the wall’s outermost surface, is cleaned. Brick cleaning is required at various different stages of a building’s life, and with our arch, a cleaning was more than overdue to restore it back to its original condition!
Sponsored
Jo Richardson Community School | Free Standing Timber Canopy

Jo Richardson Community School | Free Standing Timber Canopy

Able Canopies Ltd

Jo Richardson Community SchoolProduct: Tarnhow Dome Free Standing Timber CanopyTimber Stain Colour: Antique PineCanopy Size: 35m x 11mEstimated Value: £90,000Installation Date: August 2017Contractor: KCH Contractors Ltd.The BriefJo Richardson Community School is a large school in east London. The School has around 1400 pupils between 11 – 19 years of age.In one part of the School there is a generous sized space that is enclosed on three sides by school buildings. The School has many courtyard spaces like this but this one is the busiest because it is next to the canteen and on the most direct route to the separate sports hall. As the space is uncovered it offers little shelter to pupils and staff. To transform this area, so that it could be protected and safe to use for dining, break times and other activities, the school wanted to cover it with a canopy.Initially they requested a steel framed canopy with no central posts. This would allow maximum use of the space (with no posts to restrict the flow of people or potential uses). There were two major drawbacks to this approach. The first was cost. A steel structure large enough to cover the space and work without central posts would not be cheap. The second was that using a steel structure, that was big enough to fit the space, had the potential to not be sympathetic to the surrounding buildings and environment.As this was such an important project it was essential that any solution satisfied both practical and aesthetic requirements. This can be seen in the rendered image below which shows how the all steel structure would have looked.A second, more cost-effective option was then proposed. This still used steel but included posts that would support from the centre. This gives more flexibility to the installation process and reduces costs, but does place limitations on the use of the space and flow of pupils under the canopy.In both cases a steel canopy was proving not to be the ideal option.The SolutionTo overcome the issues of using steel we suggested to the School that they consider our Tarnhow Dome Free Standing Timber Canopy. This would allow them to maximise the space, work within a manageable budget and use a material that would complement the existing buildings and make a strong and appealing visual statement.The final size was a canopy that measured 35 metres in length, by 11metres wide, with a height of 5 metres. This could be installed without central posts, thereby ensuring the space could be maximised and used for different activities and occasions.While timber was not the first thought for the customer it proved to be the perfect choice. With its good looks, provision of effective weather protection and value for money price, it ensured the school achieved their project goal of a transformed space that would provide value for them well into the future.InstallationThe final installation not only gave the school everything they needed in terms of weather protection but it also looked extremely impressive with the dramatic lines of the wooden Tarnhow frame drawing the eye through the structure to the end wall. The substantial height of the canopy added to the feel of space and depth that will mean the school can use it for all sorts of activities and events and not just as a seating area.It also allows large number of pupils to move around the space safely with plenty of room for seating and other equipment, such as a hot snack trolley, to be used.The installation itself was a textbook process with the frame going up quickly and then the roof panels being added to the structure. Our pre-installation visits and accurate measurements allowed us to have all the elements in place before the agreed installation date, meaning we could finish on time and on budget. We were even able to design and construct a neat bespoke solution where the canopy had to fit with the existing building – see image to the right.This meant that the protection from rain and snow was complete wherever you were under the canopy and would allow the school to get the most from their new space all year round.
Sponsored
Bespoke structural glazing at Braywick Leisure Centre

Bespoke structural glazing at Braywick Leisure Centre

VELUX Commercial

VELUX Commercial won the tender to deliver the 45.6m x 4.3m structural barrel vault rooflight system, with integrated ventilation, planned for the central gallery. The use of a diffused polycarbonate solution also minimises glare on sunny days. A vertical frame was designed to incorporate ventilation.The rectangular aluminium structure sits beneath the rooflight - accomodating 23 EN 12101 certified centre pivot louvres for both smoke and comfort ventilation.
Sponsored
A speed dry coating for world´s longest hi-speed rail viaduct

A speed dry coating for world´s longest hi-speed rail viaduct

Hempel A/S

The new Hi-Speed Rail link about to go into service between Tangier and Casablanca is a feat of engineering accomplished by a consortium of Moroccan and European firms, supplied by local Hempel teams and ACQPA certified in 4 different countries. The 350km line includes 286 new infrastructures and 13 viaducts, where Hempel participated in collaboration with our long-standing customers, Spain’s URSSA and Portugal’s Martifer, on what is already acclaimed as “the world’s longest rail viaduct.”A contract requirement was that the 90,000m2 of steel surfaces be coated to an ACQPA-certified system, which in this case consisted of 2x100μm coats of Hempadur 47200, followed by 50μm of Hempathane Topcoat 55210. The steel structures were shop-coated in Europe with Hempadur 47200, our two-component, epoxy that forms a tough and hard-wearing coating in extremely short drying times, making it ideal as a primer or intermediate coat for in-shop applications.
Sponsored
Knauf Ceiling Solutions Touches Down at Bristol Airport

Knauf Ceiling Solutions Touches Down at Bristol Airport

Knauf Ceiling Solutions Limited

An £8m administrative hub at Bristol Airport has a bespoke Knauf Ceiling Solutions systems fitted throughout. A visually intricate honeycomb effect ceiling required the meticulous installation of suspended hexagonal acoustic rafts with precise spacing. A bespoke DONN® grid ensured each MINERAL Sonic Element was positioned equidistant to each other. Stride Treglown Associate Architects commented, “The internal aesthetic is an honest expression of the steel structure and exposed services installation. However, these two factors require careful acoustic consideration. The result is a series of randomly arranged, hexagonal suspended rafts that provide acoustic function, and a strong visual statement.”

Showing 1-36 of 1129

Feedback