NBS Source
I'm a manufacturer

"shutter"

2,515 results found

Sort by:

Showing 1-36 of 75

Sponsored
Required Testing and Certification Regime For CE marked fire shutters

Required Testing and Certification Regime For CE marked fire shutters

A1 Shutters Ltd

CE marking for fire shutters to BS EN 16034, BS EN 13241 following a fire test to BS EN 1634-1 is a legal requirement in the UK. https://a1sgroup.com/blog/a1s-group-policy-when-quoting-ce-marked-fire-shutters 
Sponsored
Dubai Metro Insulated Shutters

Dubai Metro Insulated Shutters

Hart Door Systems Ltd

AboutThe Dubai Metro Red Line, at 52.1 km (32.4 mi), is the world’s longest driverless single metro line. The planning of the metro was in response to a rapidly growing population and severe traffic congestion to relieve motor traffic and provide infrastructure for development.Project/doors200 Insulated Roller Shutters, both fire rated and non-fire ratedThe ChallengeThe Hart contract to manufacture over 200 industrial roller shutters to Dubai Metro, one of the most advanced urban rail systems in the world, was secured through the Al-Futtaim Group, who in turn were awarded by Chadwick Technology Group. Hart not only manufactured the doors but provided training to JT Metro JV, Dubai Metro Project.The SolutionManufacture over 200 Insulated Roller Shutters, both fire rated and non-fire rated for the Jebel Ali, Rashidiya and Al Qusais train depots. The shutters are designed to work in very sophisticated and complex systems including depot protection when driver-less trains are in operation.The SuccessThis was Harts largest export order to date and came on the back of large orders for Hart products for Heathrow’s T5 and the international railway terminal at St. Pancras. Once again Hart successfully delivered on a large scale project due to the engineering knowledge and project management experience.The ReviewYou have shown a high level of technical competence and professionalism in dealing firstly with the lengthy approval process, mainly due to the critical importance of the shutters for the automated operation of the Metro system, and secondly with the various site issues that invariably arrive on a project of this scale and fast track nature. Peter W. Mansell, Project Director, Chadwick SEC
Sponsored
Archies Restaurants - Shutters & Grilles

Archies Restaurants - Shutters & Grilles

Roché Systems Ltd

ARCHIES (Birmingham & Manchester)Archie’s is not only the place to be because of its vibrant décor, extravagant menu and celeb hot spot status, but at Archie’s, they are passionate about the quality of their food. They strive to ensure all their food is of the best quality and is all Halal and locally sourced with top food hygiene ratings.THE CHALLENGEThe client was looking for increased security for their restaurants in Birmingham and Manchester. We worked with their contractor Interiors UK to work out the best solution and for each site.  For Manchester we supplied and installed our E37 shutterFor Birmingham the Vulcan X2 Grille was the choice.Both products were supplied powder coated in the brands iconic Telemagenta, a vibrant pink. Just part of the service we can provide for you.
Sponsored
Folding shutters at Deptford Fire Station

Folding shutters at Deptford Fire Station

Bolton Gate Company

Deptford Fire Station is a Grade II listed building in Lewisham having been originally constructed in 1903. Bolton Gate supplied the folding appliance bay doors in the 1960’s and although still functional after fifty years, they were in need of replacement due to frequent usage. Since the building is listed, every effort was required to replace the doors on a like for like basis and Bolton Gate were engaged to supply new folding shutters to the same design which were installed and handed over recently. This is the latest in a list of several fire station contracts undertaken in London.
Sponsored
Acoustic Shutters at Hopton Holiday Village

Acoustic Shutters at Hopton Holiday Village

Bolton Gate Company

A refurbishment recently carried out at this holiday park in Great Yarmouth included the division of the large entertainment area to achieve a flexible, multi-use space. This features a sports bar one side with the other side hosting various activities such as exercise classes, kids’ activities, shows etc. Bolton Gate’s Sonaroll acoustic steel roller shutters were specified to divide the two spaces whilst providing reduced sound transmission when closed and when open, allowing the whole space to be used as a show-bar. The 100mm flat-faced laths allowed graphics to be applied depicting a boatyard scene
Sponsored
Yorkshire Water Security Shutters

Yorkshire Water Security Shutters

Hart Door Systems Ltd

Hart Door Systems has worked with a number of UK water companies to improve site security and efficiency. In particular the need to secure remote and often unstaffed but vitally important sites. Water sites have particular needs which require reliable and secure doors and the engineering expertise that Hart offer.The challenge This Yorkshire Water had 3 existing un-secure horizontal doors. These manual operation doors had fallen into disrepair and presented a security risk. Automatic doors were required to provide efficiency and security. The solution The Hart solution was to install its roller shutters, fitted in a customised way to suit the environment and to ensure security, ease of installation and minimum disruption. One of the things Hart has significant experience in is fitting doors that add security features but without the need for additional structural works. Disruption was further minimised by working in collaboration with the main construction contractor, scheduling the work to fit in with not only the day to day operations, but other work happening concurrently.Because of Hart’s experience on sites such, existing vital operations were worked around – which continued during the removal of the old doors and installation of the new. The success Several more SR rated doors are planned at the same site, so that the company can replicate the success and the improved security that has been provided.Hart has gained invaluable experience working with various water companies installing high specification SR rated security shutters. These doors meet an established set of standards to prevent unauthorised access and have been tested and shown to minimise the threat of certain intruder attacks.For those sites that need constant access by people and / or traffic, the Speedor brand of doors can provide additional high speed operation. Speedor and SR doors can be used in combination to give complete flexibility and the best of both worlds.
Sponsored
Special grille / shutter provided by Bolton Gate for refurbished building in London.

Special grille / shutter provided by Bolton Gate for refurbished building in London.

Bolton Gate Company

As part of the refurbishment of this 1970’s building, Bolton Gate were specified to provide a hybrid grille / shutter to the loading bay. In addition to providing vehicular entry / egress with the requisite ventilation for such an application, matching side panels were required with integral hinged doors to allow personnel access and provide emergency exits. The grille / shutter was provided with a special bottom rail and operates via a keypad outside, loop detectors inside and photocells / safety edge to meet H&S requirements. The whole assembly was powder coated brown in keeping with the surrounding structure.
Sponsored
Superior Folding Shutters, Hong Kong Fire Stations

Superior Folding Shutters, Hong Kong Fire Stations

Bolton Gate Company

Bolton Gate’s Superior folding shutters have been specified and used on over 100 Fire Stations in Hong Kong & Macau, the latest being the station built to service the infrastructure associated with the new Hong Kong–Zhuhai-Macau bridge, the longest sea-bridge in the world. The doors are designed to meet an onerous specification including typhoon loads up to 3kPa and fast operating speeds (approximately 700mm per second). They are designed and manufactured in the UK and shipped to Hong Kong where they are installed by Deacon & Co., Bolton Gate’s local agent.
Sponsored
Bolton Gate's Contour Shutters provide fire and security at Newcastle International Airport Duty-Free Area

Bolton Gate's Contour Shutters provide fire and security at Newcastle International Airport Duty-Free Area

Bolton Gate Company

When the Duty-Free Retail Area of the airport was recently refurbished, the design incorporated large sweeping curves on plan which also incorporated the shopfronts. The demise line of the shopfronts also entailed that they needed the facility to be closed off outside trading hours from a security point of view in addition to each unit being an individual fire compartment. Bolton Gate’s Contour shutters were specified which operate laterally and coil into a box at one end - this innovative product can describe an infinite number of bends and curves whilst closing off openings up to 100 metres wide.
Sponsored
Fire Curtains to EW120 for 125 Deansgate Manchester UK

Fire Curtains to EW120 for 125 Deansgate Manchester UK

A1 Shutters Ltd

Whilst certainly not the most iconic or largest project the A1S Group has ever been involved with, 125 Deansgate in Manchester in many ways represents for us "a bread and butter project", the like of which we are involved with throughout the UK on an almost monthly basis. Despite the doom and gloom of office rationalisation during the pandemic, high end office new build and cat A and B refurbishment continues to be one of our strongest sectors. We have completed literally hundreds of office projects over the last decade including We Work premises throughout London and the UK, Goldmann Sachs, Barclays at Canary Wharf and Norfolk House in St James Square, London. Fire and smoke curtains continue to be integral to modern office design, allowing for more open spaces within the building's wider fire strategy framework. The A1S Group manufactured, installed 54 Flameshield fire curtains, all with smoke seals and multi function panels. For us, the 125 Deansgate building was noteworthy as it was the first time that we installed our high performance Flameshield EW120 fire curtain to provide a minimum of EW90 compartmentation. We also manufactured and installed our a Flameshield fire and smoke curtain system to provide 120 minutes integrity and 15 kw/m2 to protect the lift and lift shaft. This striking building is clad in a rich red terracotta with 12 storeys of flexible office and retail space all achieving BREEAM 'excellent' and is now considered one of Manchester's premier offices. The A1S Group have a long term planned preventative maintenance in schedule in place to comply with the 2005 Regulatory Reform Order.
Sponsored
Flameshield Fire Curtain with EW120 enhanced radiation control

Flameshield Fire Curtain with EW120 enhanced radiation control

A1 Shutters Ltd

The ideal fire curtain when radiation tenability is of concern.
Sponsored
Glan Clwyd Hospital

Glan Clwyd Hospital

Roché Systems Ltd

Glan Clwyd hospital is one of Roché’s many public sector customers.The hospital required a total of fifteen shutters: a mix of M411 shutters and fire shutters.Roché’s fire shutters are linked to the building’s modern fire control and security management system, helping to prevent the spread of fire outbreaks, ensuring the safety of patients and staff.M411 shutters are used on reception counters to protect sensitive documents and controlled areas during closed hours.
Sponsored
Food & Beverage Industrial Doors - Taylors of Harrogate

Food & Beverage Industrial Doors - Taylors of Harrogate

Hart Door Systems Ltd

Bettys & Taylors of Harrogate is a fourth generation independent family business, passionate about some of the finer things in life – beautiful tea rooms, handmade cakes, traditional breads, proper tea and top quality coffee. They are the business behind Yorkshire Tea, Taylors of Harrogate coffee and the famous Bettys Café Tea Rooms.Project/doors: 5 Speedor Super, 1 Speedor Mini, 12 Fire Shutter, 21 Pedestrian doors, 1 Electric roller shutter, 1 Insulated Roller ShutterThe challenge Due to the size and weight of the insulated roller shutter at 10.5m wide and 6.3m high, this was a difficult installation in an area where the headroom was very tight. A crane was required to lift the shutter into position after opening two holes in the building’s roof so lifting chains could be dropped through to facilitate moving the shutter into position. The solutionHart was contracted by Sir Robert McAlpine to supply and install a range of industrial doors at the Taylors of Harrogate site.  This included the installation of the three-tonne insulated roller shutter completing a work package of over 40 doors. The success The installation of the shutter concluded a project which Hart was involved with through Sir Robert McAlpine and which saw almost every Hart door product installed – from Speedor high speed doors to fire shutters, security shutters and steel personnel doors. 
Sponsored
Endemol, Big Brother House

Endemol, Big Brother House

Roché Systems Ltd

Roché’s shutters were used throughout the Big Brother house to keep unwanted visitors out and housemates in, safely.Endemol, the production company behind the Big Brother reality TV series, needed a robust physical security solution that could be linked to the building management system and wouldn’t compromise the design of the set. An added challenge was that one of the shutters needed to be especially wide, at 7.8m.Roché provided the solution, installing a number of window and garden shutters, including the i95, as well a shutter for the famous Diary Room. Apart from providing physical security, these shutters also provide heat insulation and a level of soundproofing.
Sponsored
London Stadium

London Stadium

Hart Door Systems Ltd

London Stadium (formerly and also known as Olympic Stadium) is a multi-purpose outdoor stadium at Queen Elizabeth Olympic Park London.Project/doors:21 Fire and Security shutters (2010)50+ Fire and Security shutters (2015)The challengeHart assisted with the specification prior to the award. Technical collaboration was ongoing ensuring that integration and operation of the shutters went smoothly with safety and continuity in mind. Hart was subject to strict working practices and the factory was visited to review progress and audit Hart's quality system procedures.The solution2010 - Manufacture, supply, deliver and install 21 Fire Resistant and Security Shutters to the Olympic Main Stadium requiring advance battery backup and operational features. 2015 - Manufacture, supply, deliver and install over 50 Security and Fire shutters to the new build including kiosk shutters, security entrances and POD buildings surrounding the arena. The successHart was chosen out of 50+ door companies to supply all of the roller shutters to the London 2012 Olympic main stadium. Hart was again awarded all of the roller shutters under much competition on the stadium transformation project in 2015 which was transformed to cater for the multi-use environment.The review:“You should be commended for the cooperation, commitment and effort applied by your entire team. From early design discussions to your final commissioning activities of the 50 new shutters onsite, it was a pleasure to work with such proactive and knowledgeable organisation.” Jon Pepper, Project Manager, Balfour Beatty
Sponsored
Hotel La Maison in Saarlouis, Germany

Hotel La Maison in Saarlouis, Germany

Hawa Sliding Solutions AG

The automated floor-to-ceiling folding sliding shutters on the facade of Hotel La Maison in Saarlouis not only provide protection from the sun and noise, they are also an important element of design: when guests open and close the shutters, they exert an influence on the design of the façade. the façade consists of room-high folding sliding shutters equipped with HAWA Frontego 30 matic hardware. Guests can open and close the shutters at the touch of a button. In doing so, they determine their privacy and view and also create a new façade appearance every time.
Sponsored
Transport for London

Transport for London

Roché Systems Ltd

Roché are proud to be a specified supplier for Transport for London (TfL).Our shutters are installed throughout the TfL underground and overground network, including the much-anticipated, state-of-the-art Crossrail (Elizabeth Line) project.By collaborating with Walker Construction, amongst others, on various TfL projects, we are playing our part in keeping the capital moving and improving the vital transport infrastructure.Roché’s aluminium and steel shutters are installed on station entrances, ticket offices and kiosks (including Krispy Kreme and Lola’s Cupcakes). Our fire-rated shutters are keeping people safe, whilst security-rated shutters are protecting property.
Sponsored
John Lewis Flagship, Ipswich

John Lewis Flagship, Ipswich

Roché Systems Ltd

The flagship Waitrose and John Lewis at Home store in Ipswich required a particularly large shutter to secure a high-value goods loading bay. After exploring various options, they came to Roché for help.Working with their main contractor, Bowmer & Kirkland, we installed a 65m2 Eurolook shutter. This couples high security protection with maximum visibility.Roché’s expertise in physical security meant that a bespoke shutter could be deployed quickly and simply.
Sponsored
Selfridges, Oxford Street

Selfridges, Oxford Street

Roché Systems Ltd

Selfridges & Co’s iconic store at 400 Oxford Street first opened its doors in 1909 and now includes a range of experiences including a creative playground, late-night dining restaurants, a cinema, and even wedding services. It’s also one of the only stores on Oxford Street not to have its windows smashed by the Suffragettes back in the day.In partnership with Souvenir Scenic Studios we were tasked with manufacturing security shutters to cover 2 voids, one facing the Edward Mews road and the other for a temporary space on Orchard Street.The client was keen to maintain vision once the shutters were installed in preparation for a new exhibition area and therefore decided to proceed with our Tube & Link steel security shutter. Both security shutters were over 4m in width and can be operated electrically via an external key switch. Manual overrides were provided so that each shutter could be used in the rare event of a power cut. Our Tube & Link security shutter was the perfect solution with the ability to maintain 75% visibility while making sure both areas remained secure. Due to the size of both openings, a three-phase motor was provided.  The steel tubes, guides, and housing were all powder coated grey to meet the client’s requirements.
Sponsored
UBS Broadgate

UBS Broadgate

Roché Systems Ltd

Broadgate, at the heart of the City of London, is home to a mix of prestigious buildings and architectural designs. One of the latest building designs is UBS’s new headquarters, by Ken Shuttleworth of Make Architects, which promises to be one of the world’s greenest buildings.With the project well underway, ISG Construction called-upon Roché to assist, thanks to our track record in handling unique, high-profile projects. We installed a number of fire curtains, fire shutters (including a bespoke design 9m-wide fire rated shutter) and V77 vision shutters.
Sponsored
ExCel London Phase II - Fireroll Acoustic

ExCel London Phase II - Fireroll Acoustic

Bolton Gate Company

The SiteExCel London opened in November 2000 and was the integral component of a huge regeneration project in the area of the Royal Victoria Docks next to the River Thames. The Phase 2 project had the primary objective of increasing the existing flat floor space by 32,500m² resulting in an incredible one million square feet of flexible floor space. This projected the already highly regarded Excel  London into the position of a world class exhibition and conference venue.  Close to London City Airport and with it’s own dedicated station on the Dockland Light Railway the centre manages to attract millions of visitors per year and is a major employer within the local community.The ProjectHaving worked with Sir Robert McAlpine on numerous projects, Bolton Gate Company were extremely pleased to be chosen to again work alongside this Main Contractor particularly on this prestigious project.   The contract initially involved the supply and installation of a range of 30 and 60 minute fire rated shutters to satisfy the requirement for fire compartmentation between different exhibition spaces and to communal walkways throughout the Exhibition Centre. As the fire strategy developed it became evident that, for particular areas including some of the largest openings (7m x 10m), the fire shutters were required to provide fire integrity but this also had to be combined with an acoustic rating of up to 17dB RW. At the time, acoustic rated fire shutters did not exist on the market as a single product solution and consequently it was typical to supply two separate shutters with one to satisfy each requirement but, given space limitations, this was not a viable option. The SolutionDrawing on years of experience, Bolton Gate Company were committed to developing a workable solution in order to fully satisfy the project requirements.  Moving away from the standard ‘single skin’ type fire rated rolling shutter, efforts were concentrated upon manufacturing a new insulated type shutter that would be capable of providing the acoustic rating. The new shutter design was subjected to a series of rigorous testing, include both fire and acoustic tests all of which were in keeping with the very latest standards. The testing proved to be highly successful and we were pleased to complete our contractual obligations using the very first Fireroll Acoustic shutters which had achieved an E120 fire rating and 22dB RW acoustic rating. The Fire Shutter - Fireroll Acoustic provided a compact, hard wearing, yet aesthetically pleasing single shutter solution which was entirely suitable for incorporation into such a highly regarded exhibition and conference centre.   
Sponsored
Résidence étudiante Rabanesse-Kesseler featuring EQUITONE facade materials

Résidence étudiante Rabanesse-Kesseler featuring EQUITONE facade materials

EQUITONE

This incredible design, that uses EQUITONE [natura], features hidden shutters to windows and Juliet balconies for the residents of this 10 story student accommodation to enjoy. The random opening of the shutters gives the building a new appearance daily, as the dark grey of EQUITONE [natura] in Anthracite [N251] works perfectly to maximise the effect of the exposed orange metal framing that lies beneath.
Sponsored
HANOVER STREET

HANOVER STREET

Metalline Architectural Fabrications

Sandwiched between a retail unit and some 2000 square feet of office space, the seven storey shuttered façade reflects the historical military tailors that used to occupy this part of London. Their tailoring techniques, forms of embroidery and bronze detailed shop fronts were an inspiration for the architects Squire and Partners, whose detailed design of the bronze panelled façade, included glimpses of deep red in the shutter reveals with 45mm diameter punched holes intended to replicate the stripes on a Sergeants uniform. Fabricated on a CNC turret punch press using high grade J57S UP aluminium, the exterior featured hook on Unity rainscreen panels finished in bronze anodised and aluminium infills in a red polyester powder coating. The balcony detail was enhanced with impressive folding shutter doors designed to offer, security, shading, ventilation and noise control from the streets below. The outer skin to the shutters was finished in bronze anodised to match the exterior panels. They also featured a regency gold anodised finish to the side plates and a red polyester powder coating to the interior screen that when folded added to the aesthetic design of the building.
Sponsored
Living space as a power plant: Solar house

Living space as a power plant: Solar house

Hawa Sliding Solutions AG

The «Plus-Energie-Haus» constructed by the Technische Universität Darmstadt is a Solar Decathlon winner. The competition has been held each year since 2002 by the US Ministry for Energy. The task is to design and build a residential house to suit life that is self-sufficient with regard to energy. The houses must cover their entire energy requirements through self-produced solar power. Between two layers is a protected external area with sliding windows and folding slat shutters that can be opened and closed as needed. The folding sliding shutters are equipped with HAWA Variofold 80 H.
Sponsored
Economical housing replaces factory: Merker-Park, Baden, Switzerland

Economical housing replaces factory: Merker-Park, Baden, Switzerland

Hawa Sliding Solutions AG

The Merker site in Baden now houses 45 low-cost apartments where the enameling plant once stood. The five-story structure sets new standards with regard to insulation and energy consumption. Architects Zulauf & Schmidlin have designed 45 apartments as the second stage of converting the site of the former Merker factory in Baden. The owners wanted an energy-efficient building and apartments with different layouts – suitable for singles and families. The folding sliding shutters made of lasered, perforated metal plate are equipped with the HAWA Frontfold 20 hardware.The shutters are powered by the building's electric system.
Sponsored
Folkart Narlidere, Izmir, Turkey

Folkart Narlidere, Izmir, Turkey

Hawa Sliding Solutions AG

Generous outdoor areas and a clear, reduced use of materials are characteristic of the gated community in Narlidere constructed by Emre Arolat. Folding sliding shutters play their part in the fascinating interplay between inside and outside. The new development near Izmir is characterized by the urban structure of a gated apartment complex with 168 units with floor areas ranging from 180 to 480 square meters. The wooden folding sliding shutters feature HAWA Frontfold 20 hardware which bathes the rooms in light when open. When closed, they offer an effective screen delicately integrated to protect from the sun and provide privacy.
Sponsored
Heathrow Terminal 5

Heathrow Terminal 5

HAG Ltd. - The Door Specialists

Heathrow terminal 5 was a project over 20 years in the making. Designed to be the largest free standing building in the United Kingdom, Terminal 5 is a £4 billion development constructed to maintain Heathrow’s status as one of the premier international airports in the world. Built to handle 35 million passengers a year, Terminal 5 houses more than 100 restaurants and shops within the building for passengers to choose from. HAG’s role was to provide vital high-level security to a large number of shopping outlets, fitting our Alulink security grilles, Armourguard roller shutters and Alishield roller shutters.
Sponsored
Agriculture Industrial Doors- Cargill

Agriculture Industrial Doors- Cargill

Hart Door Systems Ltd

Cargill is an international food, agriculture, financial and industrial products and services business. Cargill connects farmers with markets, customers with ingredients, and people and animals with nourishment.Project/doors:32 doors across six facilities12 Storm, 3 Super, 3 Mini, 6 Insulated Fast Action Roller Shutters, 4 Electric Operated Roller Shutter 4 Special Doors. Ongoing replacement of old doorsThe challenge Hart were consulted to help reduce vermin access mainly from pigeons, seagulls and geese attracted by the feed/agricultural nature of the production process. The doors needed to be capable of thousands of operations in dusty conditions allowing large vehicles fast access to the facilities. The solution With over 30 Hart doors installed across six production facilities, the latest contract replaced existing roller shutters, which remain open all day, with seven Speedor Storms, one Speedor Super and one fast action roller shutter. The emphasis was on speed of open/close cycles to significantly reduce the vermin access and improve energy efficiency. The success The investment by Cargill is also part of a drive to improve energy efficiency by 5% and to maintain a better working environment and temperatures within the building as well as preventing unauthorised access to different areas of the plant. The Review:“I wanted to say I was really pleased with the job David and guys have done. They showed great work ethic, housekeeping was spot on and their attitude to safety on site was great- whenever they were challenged they were very patient and helpful.”Gavin Dunn, Project Engineer, Cargill
Sponsored
HM Prison Belmarsh

HM Prison Belmarsh

Roché Systems Ltd

HM Prison Belmarsh is a category A prison containing some of the UK’s most dangerous and high profile criminals. Being one of the UK’s most secure prisons, it is often used to contain prisoners in cases where national security is threatened.Roché are proud to play a key part in keeping the prison safe and secure. We worked alongside Protec Fire Detection PLC to deliver 14 fire-rated shutters that were tied into the prison’s security and fire management system. As well as being used for fire containment, the shutters are used as emergency segregation barriers, to reliably close-off and lock down cell blocks in case of prisoner unrest.
Sponsored
Heathrow Airport Industrial Doors

Heathrow Airport Industrial Doors

Hart Door Systems Ltd

Heathrow Airport is the UK’s largest and busiest airport connecting the UK to over 80 long haul destinations and flying over 80 million passengers worldwide. Project/doors: Hart has over installed over 280 doors across all terminals including high speed smoke screens, fire conveyor shutters, security shutters, internal and external high speed doors, insulated fast action doors, sectional doors and pedestrian doors.The challenge Terminal 5 baggage handling system serves around 32 million passengers per year and handles around 6000 bags per hour.  Hart were asked to design, manufacture and install a specialist and unique automatic smoke screen system capable of handling over 6000 bags per hour, while providing a seal for 30 minutes in the event of fire. The solution Hart were the only company to provide a solution that fully met all the design requirements. Two years after the initial talks with the client, Hart successfully completed the manufacture and installation of all of the high speed smoke/fire screens within the main check in area, comprising 102 check in desks. Hart also installed a mixed package of roller shutter and fire doors in the lower ground service area and fire shutters on the Tube access tunnels leading directly to Terminal 5. The success Hart was chosen for the quality of engineering and the ability to meet the clients demanding specification and operating requirements. Hart continues to work with contractors and OEM’s such as Vanderlande, Mace and Balfour Beatty on site supplying upgrades and new doors when required
Sponsored
Oswestry Golf Club

Oswestry Golf Club

Roché Systems Ltd

THE PROJECTOswestry Golf Club is an award winning golf club situated on the picturesque North Shropshire/North Wales border. Home to a James Braid designed golf course, state of the art clubhouse, and two former Ryder Cup heroes.They have recently increased security for their dedicated Greenkeepers compound. Heightened security included newly installed perimeter fencing, lighting and an insulated T77 double skinned aluminium roller shutter, with electric motor and safety brake.THE CHALLENGEThe client was looking for increased security for their main shed, with the added need for insulation to improve working conditions for ongoing maintenance work through the winter months.THE SOLUTIONThe T77 is a versatile aluminium roller shutter which is suitable for a wide range of domestic, commercial and retail applications. Its 77mm insulated slat rolls into a box as small as 250mm, and a maximum area of 16m² makes this shutter suitable for windows, doors and many other openings. ‘The aim was to give us increased peace of mind for our newest equipment and also a more usable space for the team throughout the year. The install was carried out in a timely and professional manner, and I am delighted with the finished project.’ Gary Barnfield – Head Greenkeeper
Sponsored
The Links ELC – Coventry

The Links ELC – Coventry

Roché Systems Ltd

The Links ELC – CoventryCoventry ELC is a Pupil Referral Unit for Key Stage 3 & 4 pupils who have struggled to access mainstream school education due to Social, Emotional & Mental Health (SEMH) issues.They have recently increased security around the whole facility. Heightened door and window security was delivered thanks to our E37 electric shutters.THE CHALLENGEThe client was looking for increased security for their facility, to cover windows and doors.We worked with their contractor the Darwin Group to work out the best solution and completed the installation of 31 E37 shutters of varying sizes to the external doors and windows.THE SOLUTIONThe E37 is made from an strong extruded double skinned aluminium slat which can be powder coated any RAL colour. With a narrow 37mm slat it is capable of rolling tightly with a 2m high shutter capable of rolling into a 180mm box. It is widely used for domestic and light commercial applications for securing windows and doors up to 4m wide. It is very popular with schools, offices and modular building companies.The E37 comes with numerous control options including manual, key switch or remote control, including group control options.
Sponsored
CHARLIE BIGHAM'S, SOMERSET, UK

CHARLIE BIGHAM'S, SOMERSET, UK

MIDDAS

BACKGROUNDSomerset based premium ready meal producer, Charlie Bigham’s, required a new production facility as part of their continuing expansion plans. The original building design specified standard, non-fire rated vison panels with automatic fire rated shutters to close off the openings in the event of a fire. This solution required complicated and costly controls and additionally, the surface-mounted shutters would create ledges and inaccessible areas that were not suitable for hygienic environments.BRIEFTurnkey technical contractor TSL required a cost-effective alternative to the proposed fire rated window solution that would maintain the fire rating and hygienic requirements for a food manufacturing facility. Having worked with MIDDAS previously on other projects, TSL turned to the team for a viable solution.SOLUTIONMIDDAS designed and manufactured a solution from its wide range of independently tested, flush triple-glazed vison panels. The vision panels are designed so the outer glazing of the cassette finishes flush with the walls, ensuring a hygienic, wipe-clean surface. The third inner pane of the triple glazed vision panels provided the fire barrier.MIDDAS vision panels are engineered to integrate into any third party wall type, including fire rated walls supplied and installed by others, negating the need for the originally proposed fire shutters.
Sponsored
Infrastructure Rail

Infrastructure Rail

Hart Door Systems Ltd

Hart has supplied hundreds of industrial doors to infrastructure projects both across the UK and internationally.Project/doors:9 Electric insulated roller shutters14 Speedor Super high speed doorsThe challengeOld rail shutters are unreliable with a potential to free fall due to mechanical failure. Doors that are past their ‘asset life expectancy’ should be replaced to ensure up to date legislations are met. These areas tend to have varying traffic and need to be secure for safety. These dangerous situations can be remedied by replacing with new doors designed for purpose. The solutionHart completed a major contract to replace old and unreliable shutters at the Stewarts Lane depot, Battersea. The contract included the removal of old doors and re-installation of nine doors of varying sizes, the largest being 8.5m wide and 4.7m. Safedrive motors delivered quiet and smooth operation despite the size and improved security and safety for staff.The successHart replaced 14 of it’s own Speedors installed at Laira Depot, Plymouth which were still operational after 22 years. This is an astonishing length of service and a testament to the quality of product. Hart’s reputation for technical excellence developed over many years has given Hart a distinct edge when involved such contracts.The Review:“Your installation staff were extremely efficient and friendly workers. They carried out the work safely in a professional manner and there were no issues or problems on site. Both of them were a credit to your company.” First Great Western Ltd
Sponsored
The Burrell Museum, Glasgow

The Burrell Museum, Glasgow

HAG Ltd. - The Door Specialists

OverviewThe Burrell Collection in Glasgow reopened in March 2022 after over 5 years of being closed for a significant restoration project. The ProjectBritish door specialist HAG Ltd. supplied & fitted fire shutter systems & fire curtains across the building to meet stringent fire regulations and also provide significant peace of mind in protecting the ensuring the safety of the priceless collections housed within the building. The museum houses a world class array of treasures, exhibited in an architecturally significant home, set in the Pollok Country Park which is a few miles outside of central Glasgow. The building & collection is known as one of the flagship cultural venues in Scotland, and an extensive restoration project has seen a £68million investment to significantly increase both museum & gallery spaces. Our bespoke designed fire shutters & curtains offer an exceptionally high standard of specification, performance, and protection for your premises. Fire compartmentalisation allows the building to be split into smaller areas or units to withstand fire and smoke for a much longer period of time. Fire shutters can limit the spread of fire & smoke, ensure safe escape routes for human lives, and limit the damage to property and its contents. Our Complete Guide to Fire Protection Products can tell you more about up to date fire legislation and regulations, as well as how products can be used to meet your needs. As part of the guide, there is a RIBA CPD approved on-demand video to assist you.Sir Angus Grossart, chair of Burrell Renaissance, said: "The Burrell Collection has a reputation as being one of the finest in the world. The wonderful new displays have enhanced and informed what visitors will see. They will find great cultural diversity, much beauty and wonder and the great achievement of one enquiring and questioning mind, that of Sir William Burrell."
Sponsored
Wolverhampton Market

Wolverhampton Market

Roché Systems Ltd

Wolverhampton market has recently undergone a major overhaul. The project involved closing all of the indoor stalls and moving them elsewhere; mainly into shipping containers which had been specially designed for the purpose.Project managers White Circle are at the forefront of the shipping container upcycling trend. While markets don’t traditionally tend to require much security at a stall level, relocating to permanent outdoor structures posed a new challenge. This was solved by installing a T55 security shutter on each of the 16 cabins. Openings measured from 1.6m to 2.9m wide, all at 2.3m high and with manual operation. An anthracite grey finish was chosen to complement the brightly coloured containers.T55 security shutters have 55mm slats, enabling a box size between 165mm and 250mm. The compact design makes them perfect for small openings where aesthetics are important.In Wolverhampton, stall owners were happy with their new accommodation. The Snack Bar café was based indoors for 19 years before the move. Co-owner Donna Walton said: “For us it’s been much busier outside. It’s been a big change but it’s for the best, and we love our new home now”.She continued: “At first I was worried whether the business would be more vulnerable being outside, but when the council told us we’d have roller shutters I felt relieved. They’re unobtrusive and really easy to open and close, too”.in addition we provided 9 of the Markilux 3300 patio awnings designed for widths of up to 5600mm and with a projection of 1500mm projection. These were manufactured with manual operation due to the reduced projection and gave stall holders ease of use depending on the conditions.The angular design was well suited to the shipping containers and the grey frame and fabric colour were chosen to keep a uniform look across all the different containers. 