NBS Source
I'm a manufacturer

"screen"

3,059 results found

Sort by:

Showing 73-108 of 286

Sponsored
UNIVERSITY COLLEGE HOSPITAL LONDON

UNIVERSITY COLLEGE HOSPITAL LONDON

Premier Security & Fire Consultants Ltd

Premier Security & Fire was commissioned to design, fabricate and install six sets of security doors at University College Hospital London (UCLH).Instructing clients Kyotec Group required a LPS1175 SR2 security standard on all doors, including one set of double doors with a 60-minute fire rating.Premier's portfolio of certificated doors, screens and gates ranges from LPS1175 SR2 to C5 (SR3); D10 (SR4) including fire-resistance to EI 60 and E90, and thermally-broken options.For more details of Premier Security & Fire’s extensive range of security doors, windows, screens, and gates, including Secured by Design standard, call our Managing Director Neil Johns, on 0208 559 8295. He will be happy to take your call.
Sponsored
Southern Health NHS - Cherry Ward

Southern Health NHS - Cherry Ward

Advanced Timber Systems

The new Cherry ward is an 18-bed acute mental health facility and was completed in July 2021. ATS were involved with the supply of door-sets, ironmongery and screens with many special anti-ligature features to increase patient safety and security.
Sponsored
Rochdale Riverside Cinema - Acoustic Floating Floors

Rochdale Riverside Cinema - Acoustic Floating Floors

Total Vibration Solutions Limited t/a TVS Group

As part of the Rochdale Riverside new development, the TVS Group was approached to assist in the construction of a new 6-screen Reel Cinema to ensure that Reel’s acoustic requirements for the space were met, as well as ensuring that adjacent businesses would not be adversely affected.
Sponsored
W. Bruford Jewellers - A classy jeweller requiring a safe, secure and sleek entrance

W. Bruford Jewellers - A classy jeweller requiring a safe, secure and sleek entrance

FAAC Entrance Solutions UK

Established in Eastbourne over 130 years ago, W.Bruford is proud of its reputation for exceptional service, exclusive choice and attention to detail. They are recognised as a prestigious jewellers and pride themselves in offering the highest quality products and services. We wanted to do their brand justice by working closely with them to make their vision for their entrance come to light.Project Year: 2019Product: ASSA ABLOY SL500 Transparent Sliding DoorProject Background: Having worked with Innovare Design on their shopfront redesign, the client approached us to request a bi-parting all glass automatic door with side screens and pocket screens, and for the operator to sit above the ceiling and be the closest match to the bronze finish on their sign. As a high end jewellery store, both security and a clean and sleek look, were priorities for the entrance.Solution:FAAC Entrance Solutions installed the SL500 Transparent sliding door four panel system and finished the operator cover in a 50% gloss Light Bronze RAL Finish. The pocket screens were replaced by flush mounted EN16005 compliant safety presence detecting sensors which together with the 10.8mm glass and a dotted manifestation, contributed to an elegant yet safe entrance. We integrated mechanical bolt floor locks, and first-entry switch and last-exit push buttons for the use of staff. For more information or assistance with any project, please contact enquiries.esuk@faactechnologies.com where we can provide expert guidance and detailed documentation.
Sponsored
Eggborough Power Station

Eggborough Power Station

Lionweld Kennedy Group

Contracted by the 'National Grid', Lionweld Kennedy supplied and installed protection for the Eggborough Power Station. We created 46.6m high protective blast screens and kentlidge support blocks to the transformer station. All of the steel provided was manufactured in-house and fabricated to meet the needs of the client.
Sponsored
VELUX HQ

VELUX HQ

Velfac Windows

Impressive glazed screens, featuring VELFAC slim framed windows, are a key feature of the VELUX HQ extension by Sinclair Watt Architects. The VELFAC composite system, with its low maintenance aluminium exterior and inner pine frame, also blends seamlessly with VELUX roof windows.
Sponsored
FILMWORKS

FILMWORKS

Majestic Showers

Situated in the leafy borough of Ealing, Filmworks is a striking Art Deco style development. Emulating design details from the 1930s, the bathrooms resonate beautifully within the apartments Roaring Twenties inspired interiors. Majestic were invited to supply Rio and Monaco screens from The Frameless Portfolio.
Sponsored
Chapter House, Lichfield

Chapter House, Lichfield

Velfac Windows

Described by architects Proctor and Matthews as a ‘courtyard oasis for later living’, large fixed VELFAC windows combine with smaller units and doors, all with uniform sightlines to create glazed screens fronting all 38 apartments. The internal timber frame also creates a ‘domestic’ interior finish’.
Sponsored
Warmth of red brick and terracotta

Warmth of red brick and terracotta

Powdertech (Corby) Ltd

Project OverviewMount Earl Gardens is a new residential development in Streatham, South London, built on a site formerly occupied by old garages. Modular construction has been used to create a building of one, two and three storeys, creating as little impact as possible on the views from existing houses. Walkways have been designed within the block, with 'modernist' screening which allows light and fresh air into these areas whilst still keeping them safe and secure for residents. The aluminium screening runs along the length of the buildings and is also utilised in sections, including garden division screens, throughout the entire block of thirty-two apartments. To achieve the design vision, the building needed an homogeneous appearance to blend with the external red brick facade.Off-site build and finishThe client selected the perfect shade from our Landscape™ Terrain range of powder coatings - 'Original Terracotta'. All of our architectural powder coating have excellent durability, requiring minimal maintenance. Powder coating as a process brings further benefits, particularly to a modular build. The apartments were entirely built in a factory, leading to a faster installation time, less time spent on site and a 90% reduction in on-site waste. Powder coating is also a factory controlled process, thereby reducing time spent, and waste generated on site, and not dependent on weather conditions as is the case with air drying wet paint.Powdertech Corby coated nearly 3000 linear metres of aluminium which was fabricated into screens off-site and delivered to site just in time for installation.BenefitsPowder coating is an offsite process. It is factory controlled leading to improved consistency, less wastage and reduced environmental impact.The powders have excellent weather resistance and colour stability.Powdertech's rigorous pre-treatment system will help to keep the facade elements free from corrosion for up to 40-years.Powdertech plant and the operational team have the capacity to process large quantities of material within a short time frame, with no compromise on quality.
Sponsored
BioMed Realty, Granta Park, Cambridge

BioMed Realty, Granta Park, Cambridge

Ash & Lacy

Project DescriptionBioMed Realty’s development comprises 94,000 sq.ft. of new office accommodation over three storeys located in the heart of Cambridge’s Granta Park Estate. Rated BREEAM “Very Good”.The building features a dramatic top-lit central atrium space arranged at the heart of the floorplates. It affords the client, a leading international biotechnology company, to operate in exemplar facilities in a flexible environment to meet current needs, planned growth and evolving working patterns, including future proofing for laboratory uses. Aukett Swanke’s design embodies quality, simplicity and elegance, which enabled rapid construction to meet the proposed occupation date.Specific Project ChallengesThe façade design needed to be optimised so that the building could capture heat in the winter, minimise heat gain in the summer and maximise the use of natural daylight.The south-facing elevation, therefore, required a dynamic screen, acting as a brise soleil, maximising daylight opportunities and simultaneously avoiding excessive solar heat gain in the building interior.Solutions OfferedAsh & Lacy provided a bespoke two-step facade solution, using 3mm natural silver anodised aluminium to meet both the aesthetic and practical requirements at BioMed Realty.South elevation panels were rectangular perforated and mounted on a frame in front of the glazed curtain wall to form the dynamic screen.North, East and West elevation panels consisted of matching solid castellated panels with an embossed pattern matching the dynamic screen panels.
Sponsored
National Manufacturing Institute Scotland

National Manufacturing Institute Scotland

Planet

The National Manufacturing Institute Scotland (NMIS) is a group of industry-led manufacturing R&D, innovation and skills facilities supported by a network of Partners across Scotland, all working together to transform the future of manufacturing and provide an innovative and multi-use hub that brings together Scotland’s brightest minds in industry, academia and the public sector.The design of the space focuses on collaboration, with a variety of private spaces specified to create areas for focused work and larger group meetings in turn.Planet, working through our northern contracting team, joined the project to provide our expertise in the design, manufacture and installation of a number of our glass partition screens and door solutions to meet the interior design by architects HLM.The standout contribution to this project was the use of Planet’s PURE20XL (38dB Rw) extended screens to produce glass meeting pods, expertly cantilevered to produce an eye-catching ‘floating’ effect. Access to the pods was provided by Planet’s high acoustic performance IsoPro glazed pivoting doors (42dB Rw). Our popular single-glazed PURE20 (38dB Rw) and double-glazed PURE100 (54dB Rw) frameless partitions were utilised for the fronts for many of the meeting rooms and laboratories — along with tech panels to house integrated room booking systems — while some extended PURE100XL screens was placed on the void edge of the digital seminar rooms.Finally, structural atrium glazing facilitated the passage of natural light deep into the internal space — perfect for the inspirational innovative environment NMIS aims to provide to its users.
Sponsored
Rust finish façade Gerrards Cross

Rust finish façade Gerrards Cross

Powdertech (Corby) Ltd

Aston House is a collection of thirty-two apartments in Gerrards Cross, Buckinghamshire.The one and two bedroomed interiors are complemented by a mix of classic protruding balconies and Juliet balconies, as well as terraces for the top floor homes. The external envelope has a brick-work skin up to the 4th floor and the fifth-floor penthouse apartments have metal rain screen cladding panels. There is also rain screen cladding around the ground floor entrance lobbies.Popular earthy, natural shadesThe architects wanted a warm, natural shade to complement the pale sand coloured brick work. ‘Rusted steel’ from our Landscape/Terrain range was chosen to coat 850sq metres of mild steel forming the rain screen cladding. All the powders we use conform to fire reaction rating A2-s1,d0 and have a 25-year guarantee for gloss, colour and adhesion.BenefitsPowdertech has years of experience in applying additional coating where needed to protect vulnerable metal surfaces. We call this our Plus+ service.Powdertech’s flexible plant can coat a wide variety of shapes and sizes of architectural metal work and fabrications.Powdertech has over 30-years’ experience in professional architectural powder coating.Powdertech has a very wide range of both standard and unusual powder coating shades and textures.Powdertech's rigorous non-chrome pre-treatment system offers the best preparation for architectural aluminium.
Sponsored
West London Platform Extensions

West London Platform Extensions

Lionweld Kennedy Group

Lionweld Kennedy designed, supplied, fabricated and installed extensions to existing platforms in order to accommodate longer trains and add a new emergency end of platform staircase . The platforms we worked on was Shepherds Bush, Imperial Wharf, West Brompton and Clapham Stations.We provided GRP deck, below deck screens, mesh litter screens, end of platform steps, fencing and lockable gates as well as associated handrails, plinths, fixtures and fittings.The GRP deck panel’s increased strength allows spans of 4000mm clear span with a 5kn/m² pedestrian loading.This meets all network rail load requirements and is fully approved and in use.Additional strengthening to the deck was required to accommodate the lighting/CCTV columns shown above.We added white and yellow edge lines and safety lines as well as the tactile pavers moulded to the deck.The gritted anti-slip surface is also ideal for this application where safety is paramount.
Sponsored
Utilita Bowl

Utilita Bowl

Ecoprod Technique

The Utilita Bowl (formerly the Ageas Bowl) is the iconic home of Hampshire Cricket. We have installed three Visutal CompactActive waterless urinals in the Atrium groundfloor washroom.Each urinal saves 100,000 litres of water per year as well as enabling the venue to display video messaging on the urinal digital screens
Sponsored
Continuous louvre wall for intensive ventilation Sancroft building in London

Continuous louvre wall for intensive ventilation Sancroft building in London

Duco Ventilation & Sun Control NV

Nestled in the vibrant heart of London, Sancroft is an office building that stands tall, a commanding structure that spans over 10 floors with 2 levels of basement with a GIA of circa 429,000sqft. When the building’s architects, Buckley Gray Yeoman Ltd, were tasked with providing intensive ventilation in the building, they turned to Price Engineered Solutions for advice. Price Engineered Solutions, renowned for their leadership in supplying heating and ventilation components for key projects across the UK. They recommended the architects to work with DUCO for the installation of intensive ventilation. A Breath of Fresh Air: Continuous louvre walls with value for moneyTo ensure the Sancroft building is ventilated naturally and continuously it was decided to install the sturdy, robust aluminium louvre-wall system, DucoWall Screening 70 & 75.John Biss, Contracts Manager from Price Engineering Ltd, explains: “The selection of the DucoWall Screening 70/75 was purly down to our recommendations and budget constraints. DUCO's louvre-wall system emerged as the ideal choice in terms of cost-effectivness.” Innovative design and aesthetic appearanceWhat sets this project apart is its innovative design, which distinguishes it from the neighbouring structures.John Biss continues: “This project is truly unique due to its innovative design. For instance, we had to incorporate bracketry to support a wire trelis that over time, will host climbing plants. . The sleek appearance of the DucoWall Screening adds to the uniqueness of the building”.Super-quick assembly and high airflowThe Z-shaped louvre blades of the DucoWall Screening are clicked directly onto the support section thanks to a direct clip system, ensuring super-quick assembly. The very large span and high airflow of the louvre wall ensures high ventilation values and thus an optimal indoor climate for all office workers present.John Biss : « With Duco’s patented ‘Direct Clip’ system, the louvre blades are clicked onto the support section directly, ensuring fast installation. In a world where everything has to be delivered very quickly and the next job is waiting in line, this is a very welcome asset!”Fine collaboration and postive feedbackThe collaboration between other parties, such as Britplas, leading commercial glazing specialist in the UK, and the engineers and contractors was very great. We had open communications between all parties involved which led to yet another project going off without a hitch”. Our client expressed profound satisfied, not only with the DucoWall Screening louvre wall but also with our adapt management of the design and installation process all while minimizing disruptoin to other trades” As John Biss aptly concludes,” We’ve delivered a project that exceeds expectations, offering a breath of fresh air in every sense” Architect: Buckley Gray Yeoman LtdBuilding contractor: Price Engineered SolutionsCommercial glazing specialist: Britplas     
Sponsored
Red Rock Cinema, Stockport

Red Rock Cinema, Stockport

Stone Cladding Systems

Client: Stockport Metropolitan Borough CouncilArchitect: BDPMain Contractor: Wates ConstructionInstaller: Range RoofingRedrock Stockport is a 10 screen cinema, retail and restaurant space and a multi-storey car park. Designed by BDP and delivered by Wates Construction the Aztec Ventilated Façade with Cebecca Limestone was installed by Range Roofing.
Sponsored
Delivering a local early flood warning and monitoring system to keep people, homes and businesses safe for Kirklees Council

Delivering a local early flood warning and monitoring system to keep people, homes and businesses safe for Kirklees Council

Andel Ltd

Slaithwaite suffered extensive flood damage in 2015 after a blocked debris screen caused Crimble Clough Stream to back up, demolishing the wall at the end of Clough Road, flooding the area and causing extensive damage to local homes and businesses.Slaithwaite is a village within the Metropolitan Borough of Kirklees in West Yorkshire, situated in the Colne Valley five miles south west of Huddersfleld.The devastating flood of 2015 in Slaithwaite The 2012 Kirklees Flood Risk Management Strategy identified that around 2,000 properties were at high risk of flooding with a potential £70 million of damage. When we started our conversation with Kirklees Council, they clearly expressed an interest in a local flood warning and monitoring system to proactively respond to future flood risk.Kirklees Local Flood AuthorityKirklees Council in West Yorkshire is the third largest metropolitan council in the region. As the lead local flood authority for the district, Kirklees manages local flood risk from surface water, groundwater and smaller watercourses and ensures cooperation between local risk management authorities. As part of a smart monitoring project for flood risk areas, funded by Chester University, Andel worked with the Kirklees Council flood risk team to design a local flood alert and monitoring solution for Crimble Clough, enabling the Kirklees Council to better manage the risk of flooding in Slaithwaite.The challengeThe project is designed to monitor high water levels at Crimble Clough caused by debris washed down from the upper wooded catchment and blocking the debris screen. The sensor-based system monitors the difference between water levels, before and after the debris screen, automatically sending alerts for pre-set trigger points.No real-time information: in 2015 the Crimble Clough debris screen became blocked by debris washed down from the upper wooded catchment, with no warning system in place to alert the screen contractors.No strategic information: in 2015, there were many flood hotspots that needed attention but with limited council resources. Because there was no remote monitoring system in place, it was difficult to choose where best to deploy support.Extensive damage: In 2015, due to the stream backing up and demolishing the wall, homes and businesses downstream from Clough Road were flooded and severely damaged.Disruption: following the flood, the clear-up and restoration process for the affected area meant residents had to leave their homes and businesses were closed for months. The economic damage from the 2015 flood was significant with many hours of Kirklees Council labour invested into the recovery. With a monitoring and alert system in place, all of this could have been prevented.The solution – Andel FloodAlertAndel FloodAlert provides 24/7 local monitoring and alerts for areas at risk from flooding. FloodAlert provides real-time information on rising water levels and automatically sends out early flood warnings. The robust and reliable system is easy to install and set up and tracks water levels in watercourses and other parameters for up to 15km from a gateway.From a single water-level sensor to a catchment sensor network monitoring water levels, soil moisture, rainfall data and water quality, FloodAlert provides real-time local flood monitoring and alerts for projects of any size.Installing Andel’s FloodAlert system now means that Kirklees Council has:A cost-effective, real-time local flood monitoring and alert system. A water level monitoring system at the debris screen that sends out SMS and email alerts when water levels reach critical. A system that recognises that the debris screen is blocked by monitoring water levels before and after the screen, sending out SMS and email alerts when the difference is too much. A dataset with detailed catchment data including rainfall, water levels at strategic points and soil moisture in the surrounding farmland – all helping to develop future flood risk models and flood alerts. Live monitoring of sensor data via a cloud-based portal with easy-to-use visualisation accessible from any device with internet connectivity. A system that can communicate with an unlimited number of designated users. Communication via a low-power, low-impact LoRaWAN ® network.The resultsAn effective early warning system: Kirklees Council now receives real-time alerts, allowing for timely response to blockages of the debris screen at Clough Road that has historically caused flooding during periods of heavy rain.Data collection: Kirklees Council can now collect detailed data about how the Crimble Clough catchment responds to rainfall and can develop models to predict future response.Impact measurement: Kirklees Council is developing a baseline to measure the effectiveness of natural flood management interventions at critical locations within the catchment.What the customer saidWorking together on the ‘buildbacktogether’ project was a pleasurable experience, it was essential to have the complimentary skills that made the outcome of the project much more effective. The support from team Andel was very useful and Gerbren Haaksma especially was extremely supportive and efficient with his quick response and stimulating input through the term of the project. I am keen to continue our collaboration and work with the local communities on more engagements like the Slaithwaite project.Namrata Bhattacharya-Mis, Programme Leader, Natural Hazard Management (BA/BSc), Chester University
Sponsored
Chatham Waters

Chatham Waters

Akzo Nobel Powder Coatings Ltd

Part of the regeneration of Chatham Docks, Chatham Waters comprises of two blocks of 193 PRS apartments linked by a single-storey podium level.Y2206F Steel Bronze 1 and Steel Bronze 2 Y2217F applied to solid and perforated cladding panels, whilst YW387I Ordos Sable adorns both balconies and window frames and screens.
Sponsored
Heathrow Airport Industrial Doors

Heathrow Airport Industrial Doors

Hart Door Systems Ltd

Heathrow Airport is the UK’s largest and busiest airport connecting the UK to over 80 long haul destinations and flying over 80 million passengers worldwide. Project/doors: Hart has over installed over 280 doors across all terminals including high speed smoke screens, fire conveyor shutters, security shutters, internal and external high speed doors, insulated fast action doors, sectional doors and pedestrian doors.The challenge Terminal 5 baggage handling system serves around 32 million passengers per year and handles around 6000 bags per hour.  Hart were asked to design, manufacture and install a specialist and unique automatic smoke screen system capable of handling over 6000 bags per hour, while providing a seal for 30 minutes in the event of fire. The solution Hart were the only company to provide a solution that fully met all the design requirements. Two years after the initial talks with the client, Hart successfully completed the manufacture and installation of all of the high speed smoke/fire screens within the main check in area, comprising 102 check in desks. Hart also installed a mixed package of roller shutter and fire doors in the lower ground service area and fire shutters on the Tube access tunnels leading directly to Terminal 5. The success Hart was chosen for the quality of engineering and the ability to meet the clients demanding specification and operating requirements. Hart continues to work with contractors and OEM’s such as Vanderlande, Mace and Balfour Beatty on site supplying upgrades and new doors when required
Sponsored
Socially distanced greenery and closer to nature

Socially distanced greenery and closer to nature

Mobilane

The world is focused on social distancing, safety and health; this latest project brings nature a little closer to help improve on all counts with socially distanced greenery. Leicester City Council’s urban environmental goals called upon the flexibility and experience of a rapid taskforce of installers from Hedera Screens to bring green elements across the City during lockdown and beyond.
Sponsored
ONE HYDE PARK

ONE HYDE PARK

Majestic Showers

With interior design and material specification by Candy and Candy, One Hyde Park is the most exclusive address in the world. Majestic supplied approximately 150 bespoke frameless shower screens for the One Hyde Park development. A mixture of Rio, Portofino and Maine models, perfectly in keeping with the minimal, high quality finish that is the signature of the bathroom designs at One Hyde Park.
Sponsored
Consort Claudgen’s Wi-Fi Enabled Heaters Upgrade for Cambridge School of Visual & Performing Arts (CSVPA) Student Accommodation

Consort Claudgen’s Wi-Fi Enabled Heaters Upgrade for Cambridge School of Visual & Performing Arts (CSVPA) Student Accommodation

Consort Claudgen

Cambridge School of Visual & Performing Arts (CSVPA) required energy-efficient heating solutions for their student accommodation units. To reduce ongoing energy costs, CSVPA approached Consort Claudgen for an upgrade to their existing heating system. Consort Claudgen recommended Wi-Fi enabled heaters with bespoke screens to meet the heating requirements of CSVPA’s 286 student apartment units.
Sponsored
Acoustic zoning across multiple spaces for leading AV company

Acoustic zoning across multiple spaces for leading AV company

Allsfar

Design and fit out of a new 5,000 sqft HQ in Reading in just 7 weeks. The project was across two floors and was very much designed with video production in mind with several specific areas that needed to be created including a large screen demo studio, a training centre, a tech support lab as well as a creative working environment to inspire all staff.
Sponsored
Dana Petroleum Offices, Aberdeen

Dana Petroleum Offices, Aberdeen

Silent Gliss Ltd

Dana Petroleum is an oil and gas company and the project was to refurbish their UK offices in Aberdeen. The multiple floors in this office block required blinds coordinated to specific colour themes. Silent Gliss SG 4910 were specified - 233 blinds installed, some with a screen fabric, some with a blackout option. This was achieved by installing double systems with the blackout blind to the back of the window.
Sponsored
CHELSEA WATERFRONT

CHELSEA WATERFRONT

Majestic Showers

Built in 1904, Lots Road power station generated electricity to power London’s Tube network until the mid-1960s. Chelsea Waterfront is the glamorous transformation of this fabulous piece of British industrial architecture and its surroundings. Now a bohemian urban neighbourhood within walking distance to the fashionable end of Kings Road. Majestic were invited to supply Napoli and Genoa screens for the residences.
Sponsored
The Wrapper, Edgware Road

The Wrapper, Edgware Road

A J Wells & Sons

A.J Wells designed, manufactured and installed around 1500 square metres of vitreous enamel artwork cladding at the New Griffith House building and boundary wall at Chapel Street, London, as part of a London Underground Upgrade Package.Renowned textile artist Jacqui Poncelet provided the design which was screen printed onto each panel measuring 1.8 x 1.2 metres.
Sponsored
Case Study: M7 Roof Terrace

Case Study: M7 Roof Terrace

RYNO

The screened rooftop garden which sits atop the new Westfield M7 commercial office development offers outstanding views out over London's skyline. PaveRail™ substructure system from RynoPaveSupport was used across the terrace. With a build-up of over 400mm to finished floor level and high-levels of foot-traffic, PaveRail will stay completely rigid and keep slabs in place.
Sponsored
Accoya chosen for Blackwood Street apartments in Melbourne

Accoya chosen for Blackwood Street apartments in Melbourne

Accoya

Distributed by Britton Timbers, Accoya was selected for the louvres/external screening on the North Apartments, Blackwood street in Melbourne. Accoya was chosen due to its durability, stability and FSC certification. The 40 x 40 mm were coated using Woca external tinted Primer and an additional coating of Woca external Walnut oil. The louvers were then fixed from behind onto powder coated black material frames.
Sponsored
Accoya cladding at Geosouthern Energy’s corporate headquarters

Accoya cladding at Geosouthern Energy’s corporate headquarters

Accoya

Accoya selected for the renovation of the GeoSouthern Energy’s corporate headquarters. Distributed by Mason’s Mill & lumber, the Accoya cladding was milled into a Vanish Rain Screen profile with a walnut stain for the exterior of the building. Various sizes of Accoya were used ranging widths between 5”-8”. In total 80 m3 of Accoya was used for the project. Accoya was chosen due to its stability & durability making it the perfect fit for designers Kirksey.
Sponsored
Meridian Coping at Skelton Lakes

Meridian Coping at Skelton Lakes

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Skelton Lakes Motorway Services, Leeds Project Type: Retail, Infrastructure, Leisure, Mixed-use Development Cost: £60m Products: Meridian Coping, Fascia Soffit, Privacy Screens, Rainscreen Cladding Finish: RAL 7014 Graphite Grey Client: Extra MSA Group Architect: Architecture 519 Main Contractor: Morgan Sindall Group PLC Sub Contractor: Cawston Roofing Ltd
Sponsored
Ashmole Primary School - Tarnhow Mono Free Standing

Ashmole Primary School - Tarnhow Mono Free Standing

Able Canopies Ltd

Morgan Sindall had secured an ESFA project to build a brand new 7.5 million school at Ashmole Primary School in London which would provide 2,072 sq ft of teaching space for 420 pupils aged four to 11.In June 2017, they sent an invitation to tender to Able Canopies for the supply and installation of the Early Years canopy; a free standing timber canopy with side screens. They gave us the opportunity to put our prices forward because they had worked with us on many occasions and more recently at Oak Lodge School in Barnet, London where we installed a large aluminium wall mounted canopy. Whilst working with Morgan Sindall on these previous jobs, we have built good working relationships.In April 2018, we received the sub-contractor order for both the canopy and the timber screens for installation in July 2018. They chose us for the project because they found our service to be exemplary as explained by Neil Parratt from Morgan Sindall: “The customer service they provided was exemplary. Josh Foord came to site and was very helpful and worked closely with the designs and requirements. The customer service was just very good!”
Sponsored
Marketfield Way, Redhill - Basement - Watertight Concrete

Marketfield Way, Redhill - Basement - Watertight Concrete

Sika Limited

Reigate & Banstead Borough Council is transforming Marketfield Way, Redhill, with a brand-new leisure, retail and residential development. The 0.59-hectare site will turn the western side of Marketfield Way into a vibrant destination for both property seekers and visitors to the local area. It is made up of the Council’s former Marketfield Way surface car park and a group of retail and commercial buildings fronting 18-44 High Street.Features of the scheme include:A new multi-screen cinema hosting 7 screens11 new units for restaurants and shops on the ground and first floors150 new one- and two-bedroom homes to be privately rented within buildings up to thirteen storeys in heightLandscaping and public space improvements including a ‘galleria’ pedestrian route through the site flanked by shops and restaurants.The waterproofing and gas proofing of the new mixed use scheme basement area and ground floor was a crucial element of phase 2 of the project. Reigate and Banstead Council therefore called upon contractor Vinci Construction to undertake the waterproofing works, utilising Sika’s solution provided through subcontractor Oliver Connell & Son Ltd
Sponsored
New Fencing at Elland Road, home of Leeds United Football Club

New Fencing at Elland Road, home of Leeds United Football Club

Lang+Fulton

49ers Enterprises Ltd, the corporate venture capital arm of The San Francisco 49ers focused on sport, has acquired full ownership of Leeds United Football Club with a commitment to bring fresh leadership, management and investment.Recent improvements at the Club have included a steel louvred fence.Lang+Fulton supplied an Italia-100 steel louvred fence to screen the parking area for coaches at the Club. Italia-100 provides a high level of security with anti-climb properties and 100% visual screening. The fencing stretches to 111 linear metres behind the West stand of the stadium.Each RHS post was double-holed to allow for the installation to be stepped along the entire length of the fence run to accommodate the gently rising ground. Access for the coaches was provided through an extra wide 7450mm double leaf gate.The specification for the fencing and gates was for a height of 2500mm. This was achieved by seamlessly stacking an extension panel on top of the standard 1975mm panel with a flat bar frame on either side.The panels posts and gates were hot-dip galvanized and polyester powder coated Grey (RAL7016) for a durable, long lasting finish.
Sponsored
Corten Steel Louvres chosen to match Heritage Site

Corten Steel Louvres chosen to match Heritage Site

Lang+Fulton

Ashton Old Baths is a Grade II listed building which Tameside Metropolitan Borough Council has transformed into a business hub and data centre; an idea for heritage sites which could be transferred to many other ‘at risk’ buildings.The primary concern for the project was to create a sympathetic dialogue between the historic and the modern.Lang+Fulton were approached by the architect to provide an appropriate solution for a compound to surround and screen the unsightly sub-station, data centre generators, and cooling plant that were required to service the new complex. Their Corten louvre, made from weathering steel was selected to match the tonal qualities of the original red brick façade of the Victorian bath house and preserve the sensitive context of the site. The Italia-Corten panels sit between an expressed steel framework, which was hot-dip galvanized before polyester powder coating in a dark grey to reference the regeneration of the site to the area’s industrial past. The continuous structure creates 80% visual screening and the robust steel louvres provide excellent security.The compound was supplied with double-leaf and tri-fold gates to provide the required access.
Sponsored
STAR AND GARTER, RICHMOND

STAR AND GARTER, RICHMOND

Majestic Showers

With a view protected by an Act of Parliament and famously captured by JMW Turner in his painting ‘Richmond Hill’, it’s no surprise the Star and Garter mansion on Richmond Hill is one of the most exclusive addresses in the capital.The meticulous refurbishment of this Grade II listed landmark provides a stunning range of luxuriously specified residences. Majestic were invited to supply Rio and Portofino enclosures as well as Genoa and Valletta bath screens from The Frameless Portfolio.
Sponsored
Jacobs Biscuit Factory

Jacobs Biscuit Factory

Lonsdale Patent Glazing & Rooflights

Above food preparation areas, the existing rooflights needed replacing, but it was vital no broken glass could ever enter the production chain for obvious reasons. Our PlasGard patent glazing system combined with ‘unbreakable’ multi-wall polycarbonate was the obvious solution. Ventilators were fitted with fly-screens to prevent insects entering the building as again everything had to be done to prevent contamination of the food-stuffs being produced below.

Showing 73-108 of 286

Feedback