NBS Source
I'm a manufacturer

"school"

2,710 results found

Sort by:

Showing 145-180 of 959

Sponsored
Hand Dryer Case Study (Nursery and primary school) - Queen Ethelburga’s Collegiate (Chapter House School), York

Hand Dryer Case Study (Nursery and primary school) - Queen Ethelburga’s Collegiate (Chapter House School), York

Dryflow

The challengeThe school was undergoing a refurb. It was decided they wanted a space saving and energy efficient product which was also value for money. They were to replace slow drying, high energy using conventional hand dryers.“They are sleak, stylish and quiet. The design works well with the refurb we’ve done and they dry your hands compared to previous ones we’ve had!” Joe Colannino - Assistant Project Manager, Thorpe Underwood EstateAbout Chapter House SchoolSituated on the Thorpe Underwood Estate, set in more than 220 acres of beautiful North Yorkshire countryside, Queen Ethelburga’s has provided students with a vibrant and supportive school community since 1912.Chapter House (3months to year 5) is one of four schools at Queen Ethelburga’s. Overall, the group caters for children ranging from 3months to year 13.The solutionAt just 10cm depth these hand dryers take up hardly any space. They are also very quiet whilst still doing a great job of drying the hands. Ideal for a school setting.Model: Dryflow EliteDry time range: 20 – 25 secondsRated power: 1700WGuarantee length: 5 yearsThe resultsEstimated annual cost to use old hand dryers: £3733.33 (based on 12p per kW/h) Estimated annual cost to use new hand dryers: £1078.93 (based on 12p per kW/h)Annual cost savings: £2654.40Estimated annual old hand dryer carbon production: 16800 Kg/CO2 (based on 1kW = 0.54 kg/CO2)Estimated annual new hand dryer carbon production: 4855.20 Kg/CO2 (based on 1kW = 0.54 kg/CO2)Annual carbon savings: 11,944.80 Kg/CO2Estimated return on investment period:Payback period: approx. 2.2 years
Sponsored
St Columba's School

St Columba's School

Gerflor Flooring UK Limited

St Columba’s is one of Scotland’s highest achieving schools, and the need to replace the flooring within its Junior School’s multi-purpose hall and two corridors located within the school’s extension, has brought the refurbished areas into the 21st century. Gerflor’s Taraflex® Multi-Use was the flooring product most suitable for the hall renovation as it combined the aesthetic, hardwearing and safety characteristics wanted. Whereas Gerflor’s Mipolam Elegance vinyl sheet flooring with the best abrasion resistance group T rating and high stain resistance for heavy traffic use was ideal for the busy corridors.
Sponsored
Trowse Primary School Lockers Project

Trowse Primary School Lockers Project

Helmsman

Helmsman two compartment heavy-duty lockers were supplied, delivered and installed by Helmsman professionals in Trowse Primary School corridors. Bespoke specification of 1600mm height and a range of different door colours were chosen to brighten up this primary school. Each compartment door was fitted with an oval laminated number plate, from 1 to 60 twice. Blue and grey themed lockers were fitted on the first floor, while green and grey themed lockers were fitted on the second floor to split the floors. Diamond swivel locks were fitted on the lockers for an easy use and the pleasing aesthetics.
Sponsored
ACS International School

ACS International School

DYNAMIK Sports Flooring

ACS International Schools educate over 3,300 students across four sites. Firm believers that sport plays a huge part in personal character building going far beyond physical development, the school decided to invest in the best flooring system. Basketball and Volleyball are key activities within the new sports hall so in addition to two match basketball and three match volleyball courts there is a “show court” for both with seating for 400 spectators. The ideal DYNAMIK Helsinki sports floor system fully supports bleacher seating and the DYNAMIK Athen sports floor system was selected for the Dance Studio.
Sponsored
Paxman Avenue Secondary School

Paxman Avenue Secondary School

Bauder Ltd

Paxman Avenue Secondary SchoolBauderflex bituminous waterproofing system with Euroglaze rooflightsSynopsisPaxman Avenue Secondary School is a new build project situated in Colchester, Essex. The school opened its doors for the first time in September 2019 welcoming 180 year 7 students. It is expected that the school will eventually hold 900 pupils by 2023.Bauder Building BoardProject: Paxman Avenue Secondary SchoolLocation: Colchester, EssexProject type: New buildRoof size: 2500m²Architect: Concertus Design & Property ConsultantsMain contractor: Barnes ConstructionApproved contractor: G.R.M Roofing Company LtdThe specificationThe main contractor, Barnes Construction, was looking for a durable, cost effective roof with longevity, and wanted a waterproofing system which included a comprehensive guarantee with great service and full support from the supplier, and so Bauder’s bituminous system, Bauderflex, was specified. Rooflights were also specified to increase natural light into the building.Bauder’s Rainwater Calculation Software was also used to perform calculations in accordance with BS EN 12056-3:2000 based upon provided data relating to the building’s dimensions, geographical location and the flow rate performance of the selected Bauder rainwater outlet product. This helped to determine the total number of outlets needed for the roof.Products appliedBauderflexA reinforced bituminous membrane system with a choice of self-adhesive and torch-applied membranes that are resistant to high levels of structural and thermal movement. Bauder Euroglaze rooflightsThese rooflights are made to order and the size can therefore be tailor made to fit any roof aperture, with many ventilation and glazing options are available to meet the demands of any type of project.The resultThe client was supported by the Bauder Area Technical Manager, Andy Leggett, from start to finish with help being provided on the design element of the project, and the Bauder approved contractors, G.R.M Roofing Company Ltd, were supported by Bauder site technicians throughout the installation.
Sponsored
Metal lockers at Weald of Kent Grammar School

Metal lockers at Weald of Kent Grammar School

Helmsman

While the summer holidays are going on, many schools are thinking about restoring, replacing, or expanding the current lockers. The holidays are a great time to get these jobs done, as it's much quicker for installers to operate and they don’t get in the way of your students. Our Team at Helmsman manufactured and installed new lockers replacing the old ones at Weald of Kent Grammar.  Weald of Kent Grammar is a secondary school that has a strong focus on academic achievement and selects pupils based on their ability.The school requested metal lockers, with 3 compartments and 1 compartment with metal sloping tops. Metal lockers are a beneficial option for schools, as they can come in a range of compartments, colours, and sizes. The school requested sloping tops that prevent people from using the top of the lockers as a storage area, which can create a safety hazard if items fall or if students climb on top of the lockers.Our team manufactured 98 one-compartment lockers with the size of lockers 665mm high, 300mm wide, and 450mm deep. Also, three compartment that is 1775mm high, 300 wide, and 450 deep. The colour of the lockers was requested to be ‘Ultramarine Blue’ with body colour to be ‘Ice’. With sloping tops to be 'elegant grey' and extended by 80mm. With the lockers, they have requested Cam locks which would make students feel guaranteed that their belongings are safe and secure.It was great to work again with Weald of Kent Grammar on this project. If you have a similar project or want to know more about school lockers, give us a call at 01284 530 427.
Sponsored
Yorkswood Primary School

Yorkswood Primary School

Excelsior Panelling Systems Ltd

The Project Yorkswood Primary School forms part of Solihull’s Regeneration Project, investing in the area through the creation of new schools, housing, parks, village centres, and local enterprise.The £5.7m new school will replace the current outdated buildings as part of the £60m scheme in place to improve every single primary school in the North Solihull Regeneration Area benefitting the learning of over 4,000 children. The ChallengeThe Architects vision for the washrooms was to create a vibrant, innovative space with multi coloured cubicles working in harmony throughout the colour pallet. The challenge for us was to ensure full usage of the core material was utilized throughout the scheme to ensure optimal yield and competitive pricing.Construction took place alongside the existing occupied school buildings, and therefore keeping the school operational and safeguarding the pupils and staff was an important factor for this project. The SolutionRepeating the pallet throughout the washroom areas ensured as much of the core material as possible was utilised.Harlequin Mariner & Harlequin Peardrop Cubicles and Duct panelling were used through the scheme. Solid Grade Laminate is the perfect choice of material for the Education Sector offering extremely high levels of durability.SpecificationProduct Range: Harlequin MarinerDoors: 20mm Laminate Faced Compact Density FibreboardPilaster: 12mm Compact SGL, Polyrey Érable Nordique E028Partition: 12mm Compact SGL, Polyrey Érable Nordique E028Ironmongery: SBAAAvailable Finishes:These Systems Are Available In The Following Finishes:• High Pressure Laminate• High Gloss Laminate
Sponsored
Aldermans Green Community Primary School

Aldermans Green Community Primary School

Tobermore

The warm, vibrant tones of Tobermore’s Tegula Trio block paving in Heather created a beautiful finish for the external areas at Aldermans Green Community Primary School in Coventry.
Sponsored
George Abbot School

George Abbot School

Bauder Ltd

George Abbott SchoolBauder Thermofol single ply waterproofing system with Bauder Euroglaze rooflightsSynopsisLocated in Guildford, George Abbot School is a secondary education school which provides education for 2000 people aged 11 to 18. The school had a history of leaks in the DT rooms above which a profiled sheet metal roof was installed.Following many attempted repairs, Bauder was commissioned to carry out a roof survey on the 228m² profiled sheet metal roof. The report identified issues with not only the gutter area, which was originally believed to be the problematic area, but also with the adjoining profiled roof and also with the large rooflight unit.Bauder Building BoardProject: George Abbott SchoolLocation: Guildford, SurreyRoof Area: 228m²Specifier: Baily GarnerApproved Contractor: Inspire Contract ServicesThe specification Bauder submitted a proposal to refurbish all areas of the failing roof:The gutter area needing standing water to be removed for which Bauder tapered insulation was proposed to create effective drainage falls.The adjoining profiled sheet metal roof requiring a new waterproofing system. The Bauder Profiled Roof Overlay system was determined to be the best solution, using bespoke profiled insulation boards specifically designed to fit the shape of the roof. The Thermofol U15 Fleece Back membrane was then specified as the waterproofing layer providing a robust yet lightweight waterproofing system to the roof.The existing rooflight unit, being one of the problematic areas of the rooftop, was also replaced with Bauder Euroglaze rooflights. Products appliedInsulation infill systemIntended for refurbishing profiled sheet metal roofs or increasing the thermal performance of existing insulated cladding systems.Bauder Euroglaze rooflightsModular rooflight designed to provide high standards of illumination, insulation and ventilation to the interior of flat roofed buildings. These are made to order and the size can therefore be tailor made to fit any roof aperture. The resultBauder approved contractor, Inspire Contracts, installed the roof system and rooflights. Bauder’s expert site technicians carried out over 10 site visits during the 4 months of works on the site. Following a final site visit and a leak test Bauder was able to issue a 20 year product and workmanship guarantee to the client.The choice to use Bauder, a single source of manufacturing for the roof systems and the rooflight, proved beneficial as it enabled Bauder’s flat roof technician team to design out a number of the detailing issues responsible for the historic leak problems and it also eased the installation process for the client and the approved contractor, as Bauder provided its integral service from the roof survey to the final site visit and the issue of the guarantee.System installed Bauder Thermofol PVC single ply waterproofing system 1 Bauder THERMOFOL U15 FRA 1.5mm thick, reinforced PVC waterproofing membrane. Stated within BBA certificate 06/4354, the Thermofol PVC waterproofing membranes have a service life in excess of 35 years. 2 Bauder PIR MTissue-faced flat board insulation, benefitting from a zero ODP and a Green guide rating of ‘A’.3 DeckProfiled sheet metal
Sponsored
School Feldkirchen

School Feldkirchen

Forster Profile Systems (UK) Ltd

Project: School Feldkirchen, Austria
Sponsored
ylikyla-school-and-community-centre

ylikyla-school-and-community-centre

Saint-Gobain Ecophon

ylikyla-school-and-community-centre
Sponsored
international-school-of-dusseldorf-sportshall

international-school-of-dusseldorf-sportshall

Saint-Gobain Ecophon

international-school-of-dusseldorf-sportshall
Sponsored
Sommerlyst School

Sommerlyst School

Trespa UK Ltd

North of the arctic circle, Trespa® Meteon® panels brave the elementsTromsø, Norway’s northernmost city, is located on an island well above the Arctic Circle. Tromsø has a population of nearly 80,000, and at such an exceptionally high latitude, there are only two other cities of similar or larger size anywhere in the world. Therefore, when Knut Brandsberg-Dahl of Filter/Arkitekter in Oslo decided to take part in the competition for a new school building, he was aware that the project would be unusual in more than one way.“We are a fairly small architectural firm that was founded in 1999, with two partners, Thomas Lærdal and myself, and a total of ten architects. Although we do housing projects as well, public buildings feature prominently in our portfolio – and among them, educational buildings are certainly a forte”, summarises Knut Brandsberg-Dahl. “This focussed expertise is important, because all larger public projects are competitions, and we need both good ideas and excellent credentials to win them. The Sommerlyst School in Tromsø was no exception”.
Sponsored
High School Dopiewo

High School Dopiewo

Trespa UK Ltd

A winning combination: outstanding weather resistance with the look & feel of wood siding“For a small city like Dopiewo, which is located about 12km west of Poznań in the western part of Poland, a new high school highlights the city’s status as the centre of the‘gmina’ – as municipalities are called here in Poland”, says Bart Kosinski, trespa’s area account manager. “therefore, when the project was initiated a few years ago, the ambitions were lofty, as the city council wanted their brand new school complex to make a clear statement. It had to reflect at first sight the central part it would play in the local education system”.
Sponsored
Filton Avenue Primary School

Filton Avenue Primary School

Kingspan Insulation

Pupils at Filton Avenue Primary School are enjoying the benefits of offsite construction in their warm, vibrant new dining hall, erected in a matter of weeks using the TEK Building System
Sponsored
Jubilee Wood School

Jubilee Wood School

Excelsior Panelling Systems Ltd

The Project  A new Primary School built as part of the school’s framework agreement with Milton Keynes.  Two storey portal frame build.Jestico & Whiles Architects The Challenge Produce a system suitable for use in an open space.Open plan arrangement of Cubicles and Solid Surface Vanities located directly off the corridor.Ensure safety of the user and create an anti-bulling, completely visible space. The Solution Excelsior Skyline Cubicle Range, a full height system with overhead panel. This extremely popular range is an ideal choice for school environments meeting the demands of modern education and providing complete privacy and comfort to the user.Full height cubicle systems have increased in popularity over the past few years. Skyline Range enables Schools, Colleges and the like to ensure both safety and anti-bulling objectives are met and Excelsior’s rise and fall hinge paired with the bespoke door design enables lift off access in the event of an emergency.Skyline range is an extremely durable system and comes as standard with a ‘P’ section headrail, ‘U’ channel base rail and over-panel providing maximum stability. Optional bolt through fixings are available and recommended.The successful open plan arrangement of cubicles and solid surface vanities in Orange and Pomme Verte is in keeping with the modern vibrant atmosphere of the school.
Sponsored
Hand Dryer Case Study (Junior School) - South Farnborough Junior School, Farnborough

Hand Dryer Case Study (Junior School) - South Farnborough Junior School, Farnborough

Dryflow

The challengeThe school had conventional hand dryers in place that were about 15 years old. They had a slow dry time of around 30 seconds and a rated power of 2300 kW, which isn’t very energy efficient for a hand dryer. They wanted something more cost effective, as they were renting the machines and it was costing them a lot of money year on year. “They are really good, compact, quiet, easy to keep clean and most of all reliable. The children seem to like the fact there is no button to push” Graeme Davie - Premises ManagerAbout South Farnborough Junior SchoolThis is a non-denominational Junior School catering for boys and girls from seven to eleven years of age, situated in Farnborough, Hampshire.It caters for approx. 400 pupils and has a Resourced Provision for Learning Difficulties that provides provision for 20 children.The solutionProviding a great balance between low noise levels, energy efficiency and quick dry times, this highly robust hand dryer has a motor expectancy that exceeds all others on the market Model: Dryflow Classic PLUS MKIIDry time range: 15-20 secondsRated power: 1400WGuarantee length: 7 yearsThe resultsEstimated annual cost to use old hand dryers: £644*Estimated annual cost to use new hand dryers: £235.20*Annual cost savings: £408.80*Estimated annual old hand dryer carbon production: 2898+ Kg/CO2Estimated annual new hand dryer carbon production: 1058.40+ Kg/CO2Annual carbon savings: 1839.60 Kg/CO2Estimated return on investment period:Payback period: approx. 2.4 yearsEstimated annual savings using new high-speed hand dryers compared to if paper towels were used**: Cost Savings: £4,804.80Carbon Savings: 5,241.60kg/CO2Trees Saved: 33.6* Based on 12p per kW/h; + Based on 1kW = 0.54 kg/CO2; **Based on 3 paper towels used per dry, 0.6p per paper towel, 22.5gms/CO2 per dry)
Sponsored
Torquay Boys Grammar School

Torquay Boys Grammar School

Ecoprod Technique

Torquay Boys’ Grammar School was established in 1904 and has been on its current site since 1983. At that time it had 750 boys but the number has now risen to 1,120 so extensive building programmes have taken place over the last 30 years to keep its facilities up to date.In 2018 the decision was made to switch to waterless urinals throughout the school as part of a refurbishment of all the washrooms, funded through condition improving funding administered via Hookway – a firm of chartered surveyors. It was Hookway who suggested that the school consider switching to waterless urinals, based on its experience of installing them in other schools.Peter Richardson, TBGS’s site manager, went to look at the waterless urinals installed at Colyton Grammar School and decided to make the switch. In July 2018 22 waterless urinals were installed, with a further 11 added in September 2020."The main benefit of the waterless urinals for us has been the money that we have saved on our water bill. In the South West we pay one of the highest rates for water in the country and so saving water and cutting usage was a big motivation for us. Now that the waterless urinals are installed I estimate that we are saving between £4,000 and £6,000 per year just off our water bills – it makes a big difference.""Another big benefit we’ve noticed is that there’s no longer any smell in the urinals. It used to be absolutely awful. We had tiled floors so splashes of urine would go on the floors, and of course the boys can’t aim, but now the combination of vinyl floor and waterless urinals has completely removed the issue with odour. The waterless urinals have made a vast improvement to the washrooms in the school.""When we did the initial installation we had some toilets that were quite new and didn’t need refurbishing so we kept them as they were, but recently we bought more waterless urinals and fitted them into those areas as well because we found that they had been such a success. We fitted them ourselves in house and the process of swapping over to the waterless urinals was very straightforward.""I would highly recommend waterless urinals. We can see that our water bill has really gone down and down and down, and on a day to day level the issue with smell has been completely taken care of – we don’t get anything at all now."
Sponsored
Elementary school

Elementary school

Forster Profile Systems (UK) Ltd

Project: Elementary school, Dresden, Germany
Sponsored
Christ Church Primary School - School hall fit for playtime thanks to F Ball

Christ Church Primary School - School hall fit for playtime thanks to F Ball

Ball, F and Co Ltd

F. Ball’s high performance subfloor preparation and adhesive products have been used to renovate the floor of a 160m2 school hall at Christ Church CE Primary School in Kent. A combination of Stopgap 600 deep section base compound and Stopgap 200 Smooth acrylic floor smoothing underlayment was used over a Stopgap Waterproof Surface Membrane, firstly to build up the subfloor to the required thickness and then create a smooth, durable surface on which the final floorcovering could be laid. Styccobond F46 pressure sensitive acrylic adhesive was used to secure the vinyl Polyflor XL floorcovering to the finished subfloor...
Sponsored
Aberdeen City Council Schools

Aberdeen City Council Schools

Heckmondwike FB

Aberdeen City Council’s 3Rs Project (Reorganise, Renovate, Rebuild) focused on the regeneration of its school estate. The project required durable and aesthetically-pleasing floor-coverings on a fast-turnaround.
Sponsored
Les Quennevais School

Les Quennevais School

Wetherby Building Systems Ltd

Les Quennevais School - Education New Build
Sponsored
Halcyon Way School, Oldham

Halcyon Way School, Oldham

Fixfast Ltd

The new Halcyon Way school was constructed for the community in Oldham - a Special Educational Needs (SEN) school for just over 150 children to grow, learn and develop in a caring and encouraging way.ChallengeMetal roofing and cladding contractor Decron Ltd were contracted to provide the façade for the new school. Turning to Fixfast for a solution for the support system to secure the façade, Fixfast assisted with the intricacies of the project itself - including the large letters that spell out 'Halcyon Way School' at the front of the building.SolutionFixfast were able to provide a detailed façade calculation for Decron, which included details and advice on using our SPIDI Max bracket and rail support system for the wall façade.SPIDI Max is a one-bracket design system that emphasises strength and simplicity - just one bracket can be used in vertical or horizontal applications and can be used for both fixed and sliding points within a façade.The brackets are available in a range of sizes to allow for contoured elevations, and to accommodate a range of cladding zone/cavity depths - from 80mm to 600mm in wall applications, and up to 946mm in soffit applications.Supplied in aluminium or stainless steel to cover a wide range of applications, the unique ribbed bracket design puts strength and ease of use first."Decron extends its sincere appreciation to Fixfast for their invaluable support. Fixfast's expertise in providing a detailed façade calculation and guidance on utilising the SPIDI Max bracket has been instrumental in the project's success. Fixfast's commitment to excellence and innovation reflects the high standards we uphold in our collaborations. Thank you for being a crucial part of our team."Ian Wallbank - Director at Decron Roofing & Cladding
Sponsored
Chailey School, Brighton

Chailey School, Brighton

Senior Architectural Systems Ltd

With a proven track record of successful work in the education sector, Senior Architectural Systems was more than qualified to deliver the fenestration package for this new secondary school in Brighton.The new Chailey School in South Lewes has been designed by leading architects Jestico + Whiles and features a full range of aluminium fenestration solutions including Senior’s thermally-efficient, slimline SF52 aluminium curtain wall system and robust SPW501 aluminium commercial doors. The new school has also reunited Senior with main contractor Bowmer & Kirkland, with whom Senior has an established supplier framework agreement. The two companies have collaborated together on numerous projects, with Bowmer & Kirkland being the first contractor to specify Senior’s patented low U-value PURe® aluminium window system when it was launched back in 2015. The main contractor has gone on to work with Senior and specify its aluminium windows, doors and curtain wall systems on many other education projects across the UK.Chailey School is itself part of Department of Education construction framework agreement to modernise educational facilities and improve the environmental efficiency of this sector. Senior worked closely with specialist contactor RKN Aluminium to design, fabricate and install the fenestration package for the new school building which comprises some 85 windows, 14 section of curtain wall and 12 door sets!
Sponsored
Two Rivers Primary School

Two Rivers Primary School

Forbo Flooring Systems

FORBO’S FLOORING ELEVATES THE SUSTAINABILITY ETHOS IN NEW ECO-FRIENDLY PRIMARY SCHOOL  Two Rivers primary school in Keynsham, Somerset, is only the second school in the country to achieve Passivhaus Plus accreditation. To achieve this impressive milestone, architects Hatcher Prichard had to make conscious choices when it came to choosing materials for this project. With outstanding sustainability credentials and a wide portfolio of solutions suitable for the education sector, Hatcher Prichard specified a variety of Forbo Flooring Systems’ contemporary floor coverings, including its Tessera carpet tiles, Sphera and Eternal vinyl floor coverings, as well as both its Surestep and Safestep safety flooring. A new build primary school for 420 pupils, Two Rivers Primary School was designed to add the much-needed provision for primary education to children in the Keynsham area, whilst also following sustainable building practices. With the requirement to achieve Passivhaus Plus accreditation, which meant the building had to produce as much energy as the occupants use, Hatcher Prichard had to carefully consider the materials used in the construction of this building.  Simon Hatcher, Director at Hatcher Prichard explains further: “Two Rivers achieved Passivhaus Plus accreditation in February 2023 and is only the second school in the country to do so. It is also the first to be built using standard building materials, including a steel frame with concrete floor slabs. When it came to specifying materials for the building, we looked for manufacturers that had strong sustainability credentials. With Forbo’s environmental goals so aligned with our own, and that of the building as a whole, it meant they were the perfect fit! In fact, Forbo’s sustainability credentials and flooring solutions were key to finishing this wonderful building.” However, as well as the sustainability objectives that Simon had to keep in mind, he also had to meet the design requirements. Simon commented on this, saying: “We were supplied with a document by the Department for Education on the Employer’s Requirements, which includes a section on floor coverings and the factors to consider when specifying materials for schools. The main area of consideration though was the functionality of the flooring; it had to withstand the heavy foot traffic we would expect to see in a school, whilst also being easy to clean and maintain.  “Additionally, the floor coverings needed to be installed seamlessly alongside each other to keep the joints between them flush, as well as provide some slip resistance. The chosen floor coverings also had to be suitable for the usage of each room, with the colourways used also needing to be appropriate for the age of the children using the space. The Forbo account managers really helped with this, thanks to their understanding of how specific products from Forbo’s portfolio met the individual requirements of each room in the school.” With the suitability of colours in mind, Simon looked to incorporate elements of the local environment into the design, as well as take inspiration from the school name too. He explained: “The design of the school draws from its location at the heart of Hygge Park, Keynsham. The surrounding area has a calm, Scandinavian palette of colours and materials, with the local houses made from light buff brickwork with white render above. We opted to use matching buff brick and white render externally, with complimentary blues, greys and whites for the walls and other surfaces inside. All the floor finishes were supplied using the contemporary and durable range of Forbo products required for each individual space. For example, Forbo’s Eternal vinyl was specified in the Washed Beech wood décor for the hall, hall store, studio and servery areas, which provided a natural contrast to the white paint on the walls, without being too distracting. “We also specified Forbo’s Sphera homogenous vinyl in a clear blue colourway, to represent the ‘two rivers’ of the school’s name, which runs along the ground floor corridor and extends back up along the first floor. We also used Forbo’s Eternal vinyl in the Smoke colourway for all the ground floor classrooms, which created a calm and neutral feeling.” What’s more, a selection of Forbo’s Tessera carpet tiles were chosen in a muted blue colourway for the first-floor classrooms, which helped to make them feel bright and spacious. Speaking on this decision, Simon said: “With the first-floor classrooms designed for the older students, we felt it would be more appropriate to use a textile flooring, as opposed to the vinyl flooring used in the Key Stage 1 classrooms. As such, Forbo’s Tessera Teviot carpet tiles were installed in the Mid Blue and Blue Moon colourways, both of which fit the colour theme running throughout the school. Additionally, the Tessera carpet tiles are really easy to clean, another requirement set out in the brief, so it ticked all the boxes.”  In addition to the above, Forbo’s Surestep and Safestep safety flooring were used across the project to ensure the safety of students throughout the building. Specified in the Smoke and Silver Grey colourways to match the colour scheme, the safety floors were installed in the wet rooms on both floors, as well as in the DT classroom on the first floor.  Simon concluded: “We’re really happy with the finished project, as are the school and students’ parents. The school held an open evening in mid-January where the Head and Deputy Head showed visitors around the building; both were delighted with every aspect, especially the hardwearing finishes throughout.” With the initial design stage beginning in August 2020, the school was completed in December 2022 and opened for students shortly afterwards in the new year. To find out more about Forbo’s offering for schools, visit: www.forbo-flooring.co.uk/education
Sponsored
Pencoed Primary School

Pencoed Primary School

Gerflor Flooring UK Limited

The new flagship Pencoed Primary School near Bridgend in Wales needed the ideal flooring for the project across a range of environments within the school. They specified a range of Gerflor products included their award-winning Taralay Impression Control and Taralay Impression Comfort, their Tarasafe Ultra and Ultra H20 together with Mural Calypso shower wall and 300m2 of Taraflex Multi Use sports flooring.
Sponsored
Didsbury Road School

Didsbury Road School

Dart Valley Systems Ltd

DVS recently provided several hand sanitising stations to Didsbury Road School ahead of it's reopening after the pandemic. Encouraging excellent hand hygiene has never been so important as it is today. We were thrilled to provide two Dart Valley branded AC00-050 free standing sanitiser dispensers for the entrance of the school before children returned on March 8th. 
Sponsored
Writable wall paint for schools and classrooms

Writable wall paint for schools and classrooms

ESCREO

Think Forward uses whiteboard paint to redesign a classroom for digital creators. Writable walls improve creativity, engagement and communication, following the main trend in school architecture, which aims to design the most flexible, open and communicative spaces that create school communities. ESCREO dry erase paint gives everyone the freedom to rediscover the white wall and the childish feeling of creating without limits beyond the fixed literal and metaphorical frames of an A4 format. It is no coincidence that ESCREO is also in Think Forward’s office. You can read more about this project in the interview with our partners where they also share why they use ESCREO not only in educational projects but also in private residential and office spaces.
Sponsored
Tunbridge Wells Grammar School For Boys, Sevenoaks

Tunbridge Wells Grammar School For Boys, Sevenoaks

Cellecta Ltd

Tunbridge Wells Grammar School for Boys is one of three secondary schools in the Tunbridge Wells area. The school has been extended and modernized to offer further school places to the local community. The expansion includes a new a three-storey satellite facility that houses general teaching classrooms, ICT and food technology spaces, and a five-court sports hall. An expanded dining room has also been created through the refurbishment of the existing sports hall.Cellecta’s YELOfon HD10+ was specified by Bond Bryan Architects due to its unrivalled acoustic performance in isolating a floating screed from a structural concrete floor. This product is lightweight making it easy to install. YELOfon HD10+ is also delivered in rolls to ensure it’s easy to handle.Willmott Dixon were awarded this 7,950m² contract to construct this latest school project in Sevenoaks.
Sponsored
Education | York High School

Education | York High School

Venesta Washroom Systems Ltd

“If you ask pupils what aspect of the facilities is their top priority for the school to improve, it will always be the toilets. We now have a space that is bright, colourful and looks smart. These facilities are great!” - Ian Parnaby, School Business Leader. The washroom area at York High School was a unisex block, which meant that privacy was a key priority when selecting their cubicle range. They also had to be smart, robust and easy to clean and maintain. With all this in mind York High School selected Centurion Full Height cubicles and Venesta’s pre-plumbed panelling system, Vepps®.For more details read the full case study.
Sponsored
Hillside School

Hillside School

Boyco (UK) Ltd

We were commissioned to supply and install cloakroom fittings and a bespoke ‘classpack’ package for a four-classroom extension at Hillside School in the north-east of Scotland... all to seriously tight deadlines.Portlethen is one of Aberdeen’s fastest-growing commuter towns and, within two years of completion, the local primary school needed space for more pupils... quickly. What’s more, the four-classroom extension had to be completed while the existing school and nursery operated as normal.Boyco were approached to simply provide fixed furniture and equipment but, instead, proposed a fully managed, supply and installation service that would ease the pressure on main contractor Bancon Construction. Our end-to-end package included the design, manufacture and installation of a bespoke system of cloakroom fittings, teacher walls, kitchen units and height-adjustable worktops.Challenging lead times were made more difficult by the coronavirus pandemic and new construction site rules. However, we put together a plan of works for accelerated manufacture and installed the systems in just two weeks at the end of 2020. The extension was handed over to the client in January 2021.“It was satisfying that even in the midst of a global pandemic, the Council and its partners could work together to ensure the completion of the project,” said Cllr Gillian Owen, chair of Aberdeenshire Council’s Education and Children’s Services Committee.Throughout, we liaised directly with the architect and the end client, combining our skills and experience to provide a fully-managed service designed to take the pressure off the main contractor. “Hassle-free” was how they described it. The project contributed to a portfolio of successful supply-and-fit projects in Scotland. “I will be recommending that Bancon Construction use Boyco on future projects,” said site manager Colin Smith.The service from Boyco couldn’t be faulted - from the drawings and delivery schedule to the quality of fittings, and an installation team who worked diligently without fuss to get the work completed on time.Colin Smith, Site Manager, Bancon Construction
Sponsored
Thundersley Primary School - Walkway Canopy

Thundersley Primary School - Walkway Canopy

Able Canopies Ltd

The staff at Thundersley Primary School required a large, versatile walkway at their school to create a covered pathway between two of the school's buildings. This covered walkway would allow pupils and staff to travel easily between the two buildings whilst providing shade from the sun and shelter from the rain. Due to the location of the two buildings, the walkway needed to incorporate two corners in order to link the buildings effectively.
Sponsored
Castle Wood School, Shade Sails

Castle Wood School, Shade Sails

Able Canopies Ltd

Castle Wood School required a number of outside shaded areas for the pupils at their school. A local architecture consultant created a suitable design and colour scheme which met the client’s requirements.
Sponsored
Mulberry Park School and Community Hub

Mulberry Park School and Community Hub

Proteus Facades

The eye-catching Mulberry Park School and Community Hub features Proteus SC perforated TECU Gold panels with a PPC coated aluminium support frame on the school hall and the third floor cantilevered above the main entrance and Public Square. This section, installed by Cladanco, acts as an enterprise space and was inspired by the temporary floating Mulberry Harbours once used for the Allied invasion of Normandy during the Second World War.
Sponsored
Hatch End High School, Harrow

Hatch End High School, Harrow

Broxap Ltd

A series of shelters provide playground cover at Hatch End High School.
Sponsored
Headington School - Auditorium

Headington School - Auditorium

Acoustic Products Ltd

This wonderful acoustically treated auditorium at the Headington School featuring TOPAKUSTIK Lungern micro perforated and solid panels.Architects: Lyons+Sleeman+Hoare ArchitectsContractors: BeardFor any questions or queries do not hesitate to get in contact.

Showing 145-180 of 959

Feedback