NBS Source
I'm a manufacturer

"roof finishes"

6,317 results found

Sort by:

Showing 1-36 of 625

Sponsored
Woodholm Curved Metal Finish Roof

Woodholm Curved Metal Finish Roof

Polyroof Products Ltd

At Polyroof, we take pride in providing innovative liquid roofing solutions that meet the unique needs of our clients. From project conception to completion, our expertise lies in creating high-performance roofing systems that offer both durability and aesthetic appeal.This case study highlights our collaboration with Woodholm, a picturesque property located in Southerness, constrained by the Dumfries & Galloway Council Planning’s “room in the roof” design.The SolutionWoodholm’s owners were determined to create a home that would evolve organically while adhering to the council’s planning regulations. To achieve their vision, they enlisted the services of David Lamb Architectural Services to submit a Planning Application on their behalf, seeking approval for a modification from an existing apex roof design to a curved roof. After going through the rigorous process, the application successfully obtained full Planning Committee approval on 14 February 2017.To realise their desired construction, Woodholm’s owners had a preference for using wood and oak, aiming to incorporate these elements into the design. To accomplish this, they collaborated with Carpenter Oak Woodland, a renowned timber construction company known for their expertise in oak framed structures. The company skillfully designed an oak framed structure that perfectly met the owners’ requirements. By mid-November 2017, Woodholm had a stunning and aesthetically pleasing frame in place.However, finding an ideal roofing solution proved to be a challenging task for Woodholm. Initially considering a zinc roof, they encountered obstacles due to the prohibitive costs and the challenges posed by their maritime environment, as Woodholm is located directly on the shores of the Solway Firth. It was at this point that David Lamb’s initial positive impression of a roofing product caught their attention. Woodholm’s owners approached Polyroof’s simulated metal finishes with their needs and were introduced to the Polyroof technical team. The team guided them through the necessary technical specifications to meet the Scottish Building Warrant for a Warm Roof, ensuring compliance with the required standards.Fortuitously, Woodholm’s owners discovered that Polyroof would be exhibiting at the “Homebuilding & Renovating Show” from 21-22 October 2017. At the event, they had the opportunity to meet the Polyroof team as well as Contractor, Kenny Scott of LK Roofing, Lochmaben. The Woodholm team was highly impressed and reassured by the collective experience, knowledge, and technical expertise demonstrated by Polyroof and LK Roofing. Equally important, they appreciated their ability to attentively listen to and understand their concerns.Following the show, a site meeting was promptly arranged with LK Roofing, allowing all parties to discuss the project in detail. As a result, a comprehensive and competitive quotation was provided, falling comfortably within Woodholm’s budgetary requirements.By early December 2017, Woodholm’s joiner had installed the sub-decking, which served as the foundation for the roofing system. LK Roofing then expertly applied the Alutrix membrane, a high-quality waterproofing layer, providing Woodholm with a watertight working cover.Thanks to our collaborative efforts with Woodholm, the project achieved a seamless integration of their desired curved roof design, wood and oak elements, and our advanced liquid roofing system. Woodholm’s owners were delighted with the final result—a beautiful, organically evolving home that not only met their needs but also exceeded their expectations.At Polyroof, we are dedicated to providing roofing solutions that offer both outstanding performance and stunning aesthetics. The Woodholm case study is a testament to our commitment to delivering innovative products and excellent customer service, tailored to meet the unique requirements of each project.
Sponsored
Commercial Project – Surrey

Commercial Project – Surrey

Russell Roof Tiles

A stable conversion project needed an authentic clay roof finish.
Sponsored
Green Roof, Extensive, Alder Hey Children's Hospital, Liverpool, UK

Green Roof, Extensive, Alder Hey Children's Hospital, Liverpool, UK

ABG

The challenge was to incorporate a green roof finish both flat and curved to the roof areas. The roof pitch being as steep as 45 degrees in places, a pitch not conducive with a green roof system. ABG used their expertise in green roof and slope stabilisation to make the curved green roof possible. The system incorporated a series of anchor points, reinforcement geogrid (Trigrid), and geocellular technology (Erosaweb) to retain growing medium on each roof. The Green Roof system incorporates a SMART rain sensor and automated irrigation pipe system with each finger haveving its own dedicated mains operated tank
Sponsored
Bilco Roof Access Hatches & Smoke Vents Chosen for the Glasgow Transport Museum

Bilco Roof Access Hatches & Smoke Vents Chosen for the Glasgow Transport Museum

Bilco UK

Bilco UK’s special zinc-clad Roof Access Hatches and Smoke Vents chosen for the Zaha Hadid designed Glasgow Transport Museum, Scotland. The roof specification included Smoke Vents and Roof Access to blend with the roof finish. Bilco supplied modified units with zinc cladding to achieve the desired look. To enable safe roof maintenance, a modified E-50T Hatch was supplied and installed to the 46 degree sloping roof enabling maintenance staff to gain easy, safe access to roof equipment
Sponsored
Britmet Lightweight Roofing: LiteSlate Residential Roof Renovation

Britmet Lightweight Roofing: LiteSlate Residential Roof Renovation

Britmet Lightweight Roofing

This case study focuses on the successful implementation of Britmet's Structural Conversion System, BritFrame, and composite slate tile, Liteslate, installed by ART Contracts LTD in a residential flat roof renovation project near Llangollen. The existing roof had been plagued by ponding and water ingress, necessitating repeated repairs and replacements over 20 years. This case study explores the benefits, challenges, and outcomes of utilizing the Britframe and Liteslate, providing a long-lasting and aesthetically pleasing solution. Residential flat roofs are susceptible to issues such as ponding water, water ingress and yearly inspections, which can lead to recurrent maintenance and repair requirements. This case study showcases the utilisation of Britmet Lightweight Roofing's Britframe Structural Conversion System and Liteslate to overcome these challenges and deliver a durable, low-maintenance roofing solution. Britframe is a versatile and innovative solution designed to convert flat roofs into pitched roofs, providing improved water runoff and a new more aesthetically pleasing finish, and reduced risk of ponding water and improved thermal performance. This can be covered using a variety of different roofing materials, and Liteslate, a lightweight synthetic slate roofing slate, was specified due to its excellent weather resistance, durability, and aesthetically appealing finish. Llangollen is part of the UNESCO World Heritage Site along eleven miles of canal from Gledrid to the Horseshoe Falls and required a durable yet authentic roofing solution.The project involved the renovation of a residential flat roof that had undergone multiple repairs and replacements over 20 years due to ponding and water ingress, and constant maintenance. ART Contracts LTD was tasked with implementing and installing LiteSlate to resolve recurring issues.The Britframe System converted the existing flat roof into a pitched roof, enabling efficient water runoff and preventing ponding, thereby eliminating the risk of water ingress, and reducing the need for yearly inspections and constant maintenance to site, Britmet’s Liteslate offered excellent weather resistance and durability, reducing the need for frequent repairs and replacements while offering an attractive finish replicating the appearance of natural slate. Overall offering the advantages of lightweight construction and ease of installation.Conducting a thorough structural assessment of the existing flat roof to ensure compatibility and feasibility of the Britframe required careful analysis and engineering expertise. Coordinating the installation of the Britframe and Liteslate with existing roof features, such as skylights or ventilation systems, posed challenges in achieving a seamless integration.The implementation of Britframe has effectively addressed the issue of ponding, providing efficient water runoff and preventing water ingress into the residential property. The utilisation of Liteslate offered exceptional durability, weather resistance, and longevity, significantly reducing the need for future repairs and replacements, and thereby providing long-term cost savings. Liteslate also improved the overall aesthetic appeal of the residential property, replicating the natural beauty of slate roofing while offering the advantages of lightweight construction. The integration of the Britmet Lightweight Britframe System and Liteslate successfully addressed the challenges the building was facing. The project resulted in improved water runoff, enhanced durability, a more aesthetically pleasing roofing solution, along with a new 60+ year life expectancy. This case study emphasizes the importance of selecting innovative and reliable roofing systems to overcome recurring roofing issues and deliver long-lasting and visually appealing outcomes.
Sponsored
Asbestos Roof & Cladding Refurbishment Coating

Asbestos Roof & Cladding Refurbishment Coating

Liquasil Ltd

The finish to the asbestos roof and asbestos cladding on this property was faded and the roof leaked in several places, along with the gutter. Liquasil's silicone roof coating, Asbestoseal, was chosen to seal the roof and dramatically improve the aesthetic appearance using specially made RAL colours to the match the original finishes. The asbestos cement gutter was also lined with the Liquasil liquid gutter liner to form a permanent, bonded solution.
Sponsored
Metal roof coating project in Leicestershire

Metal roof coating project in Leicestershire

Liquasil Ltd

Failing factory finishes and cut edge corrosion were present across the entire roof and Liquasil's Metalseal metal roof coating system was specified as the most appropriate solution. The roof was cleaned and all failing finishes and rust was removed as far as reasonably practicable. The roof was then coated. In this case, two colours were employed. Liquasil is the only company able to produce silicone coatings in any RAL colour.
Sponsored
Binary large objects an architectural design with single ply finishing

Binary large objects an architectural design with single ply finishing

RENOLIT Cramlington Ltd

To create a Blob... CHALLENGE For the design of a Texaco service station on the highway near Antwerp the architect decided he wanted to create a Blob (Binary large objects) architectural design. The service station consists of three functional lobes that together look like an oil stain. The actual gas stations are covered with 4 lobe-shaped canopies. To accentuate this futuristic design the architect wanted to create liquid formed shapes in a metallic look. As the walls of the main building were planned using a polurea metallic finishing coating the architect sought a suitable compatible material to finish the rest of his Blob roof surfaces. SOLUTION Synthetic roofing membranes are the most flexible materials on the market and are suited to waterproof almost all possible roof shapes. For this particular project the silver coloured RENOLIT ALKORPLAN membrane was the best solution. This silver membrane is produced with a protective coating creating a roofing membrane that is easy to clean. The RENOLIT ALKORPLAN Metallic membranes combine excellent durability with added aesthetical appearance.
Sponsored
Asbestos Roof Coating - Norwich

Asbestos Roof Coating - Norwich

Liquasil Ltd

This asbestos cement roof in Norwich was soiled with moss and lichen covering the surface and had leaks in several places. Liquasil's BBA Approved Asbestoseal 20 asbestos roof coating was specified to extend the life of the roof and provide an aesthetically pleasing finish. The Contractor, ID Asbestos Ltd, carried out the works safely and efficiently.After being steam cleaned, the metal fixings were treated with our SWT Corrosion Primer and all fixings and cracks were sealer with Non-Sag Sealer. The whole roof was then coated with Asbestoseal 20 to provide a sleek new finish to the old asbestos sheets.Liquasil's Latent Defects Insurance Guarantee was provided upon completion.
Sponsored
Metal Roof Coating in Suffolk

Metal Roof Coating in Suffolk

Liquasil Ltd

The original factory finish to the metal roof of this property was failing, with the coating delaminating badly due to UV damage. The gutterless eaves construction meant that both the roofs and cladding had to be coated. Metalseal was specified because it is available in any RAL colour., In this case, Juniper Green was required. The original finish was removed with 4000psi pressure washers , before corrosion was treated with Liquasil's corrosion primer before Metalseal 20 was applied.
Sponsored
Metal roof coating with BBA Approved Metalseal from Liquasil

Metal roof coating with BBA Approved Metalseal from Liquasil

Liquasil Ltd

The existing factory finish to this metal roof was degraded and failing in multiple places. The roof was cleaned and all existing GRP roof lights were replaced. Cut edge corrosion & spot rust was treated using Liquasil corrosion primer. An initial coat of Metalseal 20 was roller applied to all corrosion treated areas, followed by a single coat of Metalseal 20, spray applied to the entire roof area. The end result looks like a new roof and will easily provide 20 years protective, water resistant finish to this once poor roof.
Sponsored
Metal Roof Coating - Merlin Grey

Metal Roof Coating - Merlin Grey

Liquasil Ltd

This metal roof in Warwick was suffering from cut-edge corrosion, delamination of the factory finish, and spot corrosion.The specification called for a full liquid roof coating in Merlin Grey, which Liquasil was able to supply for installation by Nadco Roofing Services. Liquasil's Metalseal can be made in any RAL or British Standard colour to suit the client's needs.After the corroded surfaces had been prepared back to bare metal and the substrate had been jet-washed and dried, a single coat of Metalseal was applied to the entire roof at a wet film thickness of 350 microns.Despite the steep pitch of the roof, runoff was not an issue; the product stuck to the roof and did not drip, leaving a consistent, glossy finish that left the whole roof looking like new.Metalseal can be made in more than just the standard goosewing grey - if you have an industrial roof that needs coating, Liquasil can meet your needs - no matter the colour.Give us a call on 0121 709 5352, or email us at info@liquasil.com.
Sponsored
Degaflex Flat Roofing Repair

Degaflex Flat Roofing Repair

Degafloor Ltd

London GRP Roofing Ltd, specialists in fibreglass flat roofs and terraces, recently completed a Degaflex roofing installation using our high-performance system and gave their professional opinion.Stephen Knuckey, the Director of London GRP Roofing Ltd. posted on LinkedIn photos of their project along with a comment of ‘our "Degaflex overlay. Safe to say I am extremely pleased with the finish on this. Being a felt overlay and turning out this smooth, I’ll be looking forward to applying it directly to an OSB deck.’
Sponsored
Sedum Green Roof Case Study

Sedum Green Roof Case Study

Topseal Systems Ltd

Stow House is a boutique bed and breakfast set in the heart of the Yorkshire Dales. They had the Topseal waterproofing roofing system installed and a sedum roof to finish the new extension.
Sponsored
Contempory Look Zinc Effect Roof

Contempory Look Zinc Effect Roof

Polyroof Products Ltd

The proprietors of this domestic property in Harrogate added a large extension with a total roof area of 150m2. The client wanted the new roof sections to complement the slate work and aesthetics of the original building whilst adding a contemporary and stylish look to the extension.Originally considering a zinc sheeted roofing system, the client explored alternative materials that could achieve the same visual impact but at lower cost. After discussions with Cure Roofing Ltd, a Polyroof simulated metal finish was proposed as a roofing solution that would meet all the client’s requirements.Not only do Polyroof’s range of liquids offer cost savings over traditional metals, but they are also lighter in weight, totally seamless and can be pigmented to any RAL colour. Having no scrap value, the client also had the added peace of mind that the roof would not be a target for theft.A timber warm roof was constructed which incorporated 120mm PIR insulation to achieve a U-Value of 0.18 W/m2K in compliance with building regulations. An OSB3 TG4 deck was fitted above the insulation and Polyroof pre-formed GRP standing seam trims were fixed at 600mm centres into the deck. Next, the first coat of the Protec waterproofing system was applied over the whole roof area and encapsulating the standing seam trims. The roof was finished with a second coat of Protec pigmented to RAL 7016 providing an anthracite grey colour to the whole roof, accurately simulating the appearance of zinc roof sheets.The workmanship by Polyroof approved contractor Cure Roofing was second to none and the quality of the finish left the client delighted with their new roof. With BBA approval, top-rated fire performance and Polyroof’s trusted 20 Year Accredited System Guarantee, the client has total peace of mind that their new extension could not be better protected for decades to come.
Sponsored
Degaflex Fire Rated Roofing System - Case Study - Resin

Degaflex Fire Rated Roofing System - Case Study - Resin

Degafloor Ltd

Degaflex Fire Rated Roofing system providing a watertight finish, either smooth or textured. This installation was required to overcome a long standing issue with water ingress / leaking through the roof.The building was an outhouse in Snodland, Kent. The roof had been leaking for some time, Degaflex was installed onto a felt substrate by London GRP Roofing Ltd.Stephen Knuckey, the Director of London GRP Roofing Ltd. posted on LinkedIn ‘Our #Degaflex overlay. Safe to say I’m extremely pleased with the finish on this. Being a felt overlay and turning out this smooth, I’ll be looking forward to applying it directly to an OSB deck.’
Sponsored
Metalseal Metal Roof Coating - Lichfield

Metalseal Metal Roof Coating - Lichfield

Liquasil Ltd

This 4,000 square metre roof in Lichfield, completed by Projects UK Ltd, was in need of refurbishment and Liquasil's BBA Approved Metalseal 20 was specified for its 20 year guarantee against manufacturing defects. The roof was cleaned and the cut-edges were treated with our unique SWT corrosion primer before a single coat of Metalseal 20 was spray-applied to the roof to provide a protective and decorative finish leaving the roof sheets looking like new.To get in touch, call our team of Building Surveyors on 0121 709 5352.
Sponsored
Metal roof coating, Watford

Metal roof coating, Watford

Liquasil Ltd

A roof at teh Jaguar Land Rover premises in Watford was in poor condition and suffering from cut edge corrosion. All of the loose and flaking factory finish was removed using 4000psi pressure washers and the rusted end and mid-laps were ground back to remove the rust. The cut edge corrosion was treated with Liquasil's corrosion primer and the entire roof was coated using the BBA Approved Metalseal.
Sponsored
Green Roof - The Liner Apartments Falmouth

Green Roof - The Liner Apartments Falmouth

Sika Limited

Luxury coastal apartments able to withstand the elements with Sika roofing system. Owing to its beautiful coastal location, The Liner, a nautical-inspired £35 m residential new-build in Falmouth, presented a compelling roofing challenge. Exeter-based roofing contractor, Progressive Systems, assisted by Sika, took on the task, installing a roof to withstand the harsh seaside conditions with an immaculate finish.Green roof composed of:Sika® Sarnafil® G410 18EL PVC Single Ply Waterproofing Membrane.Sarnavap® 5000E SA Vapour Control Layer.Sarnafil® Primer 610.Sarnatherm® ‘G’ insulation.Sikalastic® 625.Sarnafil® G445-13 PVC Protection Sheet.Sika® Green Roof System.
Sponsored
Asbestos roof coating installation Birmingham

Asbestos roof coating installation Birmingham

Liquasil Ltd

This asbestos roof is being cleaned using a closed box pressure wash, with all waste water being filtered and recovered for re-use. Once cleaned, the roof is coated with the BBA Approved Asbestoseal system which includes: SWT CORROSION PRIMER - fully rust and wet tolerant, the primer is applied to all metal fixing to stop further corrosion. NON-SAG SEALER - is applied to all fixings and small holes and cracks to permanently seal them. ASBESTOSEAL 20 is brush applied to the roof sheets to provide a new finish.
Sponsored
Walsall - Metal Roof Coating

Walsall - Metal Roof Coating

Liquasil Ltd

This 6,500m² metal roof at Axcess 10 Business Park, Walsall was soiled, delaminating and affected by spot corrosion in numerous areas, which would have eventually spread and perforated the sheets if a treatment was not applied.Bosworth Cladding Services Ltd ensured that the roof was cleaned and the peeling factory finish was removed with a 4000 psi pressure washer. The laps were ground back and primed as necessary.The whole roof area was then coated with Liquasil's single-coat BBA Certified Metalseal 20 system to provide a 20 year product guarantee upon completion.The completed installation left a metal roof on its way to failure looking brand new, with a protective silicone coating that will last 20 years.For more information, or to make an enquiry, contact Liquasil on 0121 709 5352.
Sponsored
Metal roof & parapet coating project using Metalseal 20 from Liquasil

Metal roof & parapet coating project using Metalseal 20 from Liquasil

Liquasil Ltd

This project involved the removal of the existing factory finish to an industrial unit in the West Midlands, followed by cut edge corrosion treatment and full roof & parapet coating. Once the original finish had been removed using high pressure jet washing, all of the end laps to the roof sheets were coated with SWT (Surface & Wet Tolerant) corrosion primer, to prevent further rusting. Once cured, the roof was coated with the BBA Approved Metalseal 20 to a film thickness of approx 300 microns.
Sponsored
Britmet Lightweight Roofing: Slate 2000 Social Housing Roof Renovation Case Study

Britmet Lightweight Roofing: Slate 2000 Social Housing Roof Renovation Case Study

Britmet Lightweight Roofing

This case study highlights the successful implementation of Britmet’s Slate 2000 product in a housing association project. The project, carried out by Saltash Construction, encompassed a total area of 290 square meters and aimed to improve the infrastructure of the existing leaking roof. This case study examines the benefits, challenges, and outcomes of utilising Slate 2000. The housing association sector plays a vital role in providing affordable and secure housing to individuals and families. To support their mission, housing associations often undertake infrastructure improvement projects to enhance the living conditions of their residents. This case study focuses on a project to revamp a housing association's infrastructure using the lightweight metal roofing panel, Slate 2000.The Slate 2000 is a durable and aesthetically pleasing lightweight roofing material with long-term performance and weather resistance. Its stylish design and robust properties make it an ideal choice for enhancing the visual appeal and durability of residential buildings. The project involved upgrading the roofing system of a housing association's properties spanning a total area of 290 square meters. Saltash Construction, a reputable main contractor, was tasked with implementing the project. Benefits and Challenges Slate 2000's robust composition ensured long-lasting performance, reducing the need for frequent maintenance and repairs. The product's Titanium Grey colour provided a modern and visually appealing finish to the housing association's properties, significantly improving their appeal for residents and building owners. The roofing material demonstrated excellent resistance to harsh weather conditions, including heavy rain, strong winds, and extreme temperatures, thus ensuring the longevity of the roofs. The installation of the Slate 2000 required skilled labour and meticulous attention to detail due to its specific design and interlocking mechanism whilst coordinating the installation across multiple housing association properties within a specified timeframeProject Outcomes The application of Slate 2000 transformed the appearance of the housing association's existing roof, making it more visually appealing and modern. The durable properties of the Slate 2000 lightweight roofing panels significantly increased the lifespan of the roof, reducing the need for frequent maintenance and repair costs. This also improved the long-term value of the housing association, offering improved durability, weather resistance, and a refreshed aesthetic, which contributed to the overall satisfaction of the residents. Conclusion The utilization of Slate 2000 in the housing association project executed by Saltash Construction proved to be a successful choice. The product's aesthetic appeal, durability, and weather-resistance qualities enhanced the project's overall value, ultimately benefiting the housing association and its residents. This case study demonstrates the positive impact of choosing high-quality construction materials and the importance of skilled execution in infrastructure improvement projects.
Sponsored
Glazed Roof Access Hatches - 97& Park, Sweden

Glazed Roof Access Hatches - 97& Park, Sweden

Surespan

Surespan designed and manufactured Glazed Roof Hatches with fixed glazed sections and a vertical end door for the 79&Park residential.The projectOscar Properties commissioned BIG (Bjarke Ingels Group) to design and construct 79& Park residential building. The building is located on the edge of Gärdet, a treasured national park. The architects made conscious decisions throughout the process to provide a sensitive, respectful building with exceptional residences with spectacular views.All Oscar Properties projects aim to add value to the city and the surrounding environment.  79&Park architecture appears like an extension of the park, a gentle hillside seamlessly blending into the nature around it. The project was named Europe’s best housing project in the Internationally recognised real estate competition The International Property Awards.ProductSurespan designed and manufactured multiple glazed roof access hatches in various sizes including 2200 x 2115, 3160 x 1553, and 4175 x 1025.  As part of the glazed roof hatches a vertical door was designed for easy access to the roof spaces. The final glazed hatches were finished off with a polyester powder-coated finish.  Features:These glazed roof hatches feature a specialist sensory control panel. A 1-minute warning sound is activated when rain is detected, and a movement sensor prevents the closing of the hatch. Other features include opening in case of a fire and a keycode pad for exiting.
Sponsored
Metal roof and cladding coating using Liqausil's BBA Approved Metalseal

Metal roof and cladding coating using Liqausil's BBA Approved Metalseal

Liquasil Ltd

Metalseal 20 was specified to re-brand a small industrial estate in Swindon. Roofs and external cladding were all stripped of existing finishes using vapour blasting. Cut edge corrosion was treated using SWT Primer and all metal surfaces were coated with BBA Approved Metalseal 20 roof & cladding coating. The finish is now graffiti proof, with any graffiti simply washing off with water, with no ghosting residue. The project is covered by the unique Liquasil latent defects insurance guarantee (including cover for professional design).
Sponsored
Wood Finish suits sustainable construction, Milton Keynes

Wood Finish suits sustainable construction, Milton Keynes

Powdertech (Corby) Ltd

Powdertech Wood Finish (Roughwood R047) is being used for a prestigious sustainable logistics development in Milton Keynes, built by Glencar Construction for client Baytree Logistics, a pan-European company. BREEAM has specified the development scheme as “Excellent”. It is also “WELL” ready – the WELL Building Standard is the world’s first building standard focused exclusively on sustainability, human health and wellbeing. The building, on a 10.4-acre site at Fenny Lock, will feature the latest in technology-enabled sustainable design features providing an environment beneficial to the health and wellbeing of the building users. Wherever possible, “Cradle to Cradle” (circular economy) principles have been adopted meaning that materials used can be repurposed in the future, being returned into the construction cycle for re-manufacture with no detriment to quality.The Benefits of Powdertech Wood FinishWood Finish on aluminium fits this approach perfectly. Aluminium itself is endlessly recyclable and our powder coatings do not affect the process. The finish can be removed, and the metal returned to its original bare state. Powder coatings are also free of VOCs, halogens and heavy metals – all compounds which are damaging to health. We are very pleased that the sustainability of Wood Finish on aluminium, and the ‘clean’ qualities of the product have been recognised as such. It is also the case that the use of Wood Finish on external features is in harmony with the aesthetics of the building design.Wellbeing for people and planetRoof garden terraces, and onsite water attenuation form part of a sustainable drainage system which includes harvesting of rainwater for re-use on site. Wood Finish in Roughwood shade R047 has been used to coat eleven enormous aluminium drainpipes which form part of this scheme; they stand 13m high with a 600mm x 600mm top section tapering to 150mm square at the ground. The scheme also includes outdoor gyms and training areas, edible vegetation and reclaimed timber seating. Internally, sensors constantly monitor air and water quality.Baytree intend that this should be one of the most sustainable logistics developments ever built in the UK and we are very excited to be a part of this ambition.
Sponsored
Roof Hatches Overlooking Alexandra Palace

Roof Hatches Overlooking Alexandra Palace

The Access Panel Company Ltd

Our Roof Hatches have been installed on top of many buildings around the world. For this project, our Roof Hatches were installed with stunning views of Alexandra Palace.To suit the building's style, these hatches feature an anthracite powder coat finish, not only enhancing their durability but also adding a contemporary and stylish touch to the overall aesthetics.Thanks to the gas struts, opening and closing these hatches is effortless, ensuring convenience and ease of use.
Sponsored
Metal Roof Coating Project using BBA Approved Metalseal 20 from Liquasil

Metal Roof Coating Project using BBA Approved Metalseal 20 from Liquasil

Liquasil Ltd

This is an installation of the BBA Approved Metalseal metal roof coating system from Liquasil Ltd. The project is in North Shields and involved removing the delaminating factory finish, treating the cut edge corrosion and then coating the whole roof in Metalseal 20, in Goosewing Grey.
Sponsored
Metal roof coating and liquid gutter liner

Metal roof coating and liquid gutter liner

Liquasil Ltd

The metal roof was first prepared using high powered jet washing equipment, to remove loose and flaking materials. Liquasil corrosion primer was applied to the corroded cut edges and the entire roof was sprayed with a single coat of Metalseal 20. The metal box gutter was heavily corroded. The loose and flaking material was removed and Liquasil’s Corrosion Primer was applied all along the gutter. The joints in the gutter were sealed with Liquasil’s unique Non-Sag Sealer and then the entire gutter was coated with Liquasil One to provide a seamless gutter finish.
Sponsored
Glazed Sliding Roof Hatch - London

Glazed Sliding Roof Hatch - London

Surespan

Surespan manufactured a double-glazed sliding access hatch for use in a private residential apartment in London. Product2640 (103?) x 2020mm (79?) hatch was electrically operated via a key switch for easy operation and allowed access to the roof providing views across the London skyline. The sliding cover was finished in grey external polyester powder coating with a white internal finish. The 35.5mm sealed double glazed unit comprised of Pilkington 6mm toughened K polished all-round outer pane, 20mm Warm Edge silver spacer Bar argon filled, Pilkington 9.5mm toughened & laminated inner pane, divided into two panes.
Sponsored
Canonmills Gardens

Canonmills Gardens

MOY

Canonmills Gardens is a stunning luxury apartment development overlooking the Water of Leith in the northern part of Edinburgh. Working within a bustling City Centre location the project offered a multitude of logistical challenges.The City Centre location always provides the main challenges, particularly with the green roof finishes. Co-ordinating deliveries as the works progressed for the various component parts of the green roof following by the living finishes themselves.
Sponsored
Cheswick Place

Cheswick Place

Marley Ltd

Bloor Homes has chosen Marley's Edgemere slates in Smooth Grey and Smooth Brown as a cost-effective roof finish for 95 new homes in the Solihull village of Cheswick Green.
Sponsored
Key Theatre

Key Theatre

Bauder Ltd

The Key Theatre in Peterborough’s city centre combined Bauder’s reinforced bitumen membrane waterproofing system and sedum blanket green roof finish with a photovoltaic solution, which the council’s contract manager.
Sponsored
Grand Designs: Green Roof Project

Grand Designs: Green Roof Project

Polyroof Products Ltd

The Protec System was used to waterproof the domed green roof areas of this striking, sustainable house development which was featured on Chanel 4’s Grand Designs. With an ambitious vision and a tight budget, Robert and Milla Gaukroger set about transforming a dated 1980’s house overlooking Lake Windermere into a state-of-the-art, eco-conscious home. Since the house lay in beautiful hillside surroundings, in order to blend into this setting, the domed roofs of the house were to be covered with a wildflower meadow mix to provide a green roof construction.The SolutionThe Protec System was chosen as a waterproofing membrane for the roofs as it is ideally suited for green roof applications. Lightweight, flexible and highly durable, the system can easily accommodate structural expansion movements and is tough enough to resist root penetration. The Protec system was applied to over 350m2 of domed roof to provide a long-lasting waterproofing membrane.The key reasons why Eastleigh chose Protec are the same reasons that has seen it become one of the fastest growing cold-applied liquid roofing systems in both the new build and refurbishment markets. Combined with the timber cladding to the verticals of the building, the finished aesthetics of the development blended seamlessly with the surrounding areas.A warm roof build-up that can be made waterproof at multiple stages:For larger projects the Protec system can be made temporarily waterproof at two stages prior to the application of the full waterproofing system. The first stage is upon installation of the sealed, aluminium-faced vapour barrier.The second phase follows the reinforcing of the foil-faced insulation board joints with Protec resin and taping mat. This enables a much more controlled approach to the installation with a greatly reduced chance of rain causing disruption and damage during the works.Highly flexible membrane:Regardless of the size of the roof, Protec forms a homegenous membrane, without a single joint or seam and without the need for any expansion joints.RapidCure technology for quick installation:The application of Protec as a liquid, through to the curing process where a solid, tough membrane that can be walked over, takes only 30 – 60 minutes. This enables large sections of the roof to be fully completed in a short space of time.Installing the Roofing SystemsThe Protec System provided waterproofing to all flat roof areas as well as the extensive parapet wall sections. The roof areas were made up of two designs: the Protec Warm Roof System (approx 7,500m2) and Protec applied to concrete as part of an inverted roof design (approx 1,000m2).The roof installation was carried out with a planned, phased approach that was synchronised to the wider construction schedule. For the warm roof areas, the first stage was to fill the troughs of the structural metal roof deck with acoustic insulation infills that will dampen external noise within the leisure centre. Next, the crowns of the deck were primed ready to receive the self-adhesive vapour barrier.The use of a high-performance aluminium vapour barrier not only eliminates the risk of condensation within the roof, but also provides temporary waterproofing protection, which is extremely useful on larger works such as this.The Polyroof RES Insulation boards, which comprised of a two layer system totalling 170mm to achieve a U-Value of 0.14 W/m2K, were bonded using high-performance PU adhesive to the vapour barrier. Following the wind uplift calculations it was determined that mechanical fixings were not required for this application – making for an extremely rapid installation. As you can probably imagine, fixing through 170mm of insulation into the crowns of the metal deck can be a tricky and time-consuming task.A key advantage of using a tongue and groove insulation system is that the finished surface of the roof is smooth and level without any unsightly board steps that can also lead to standing water issues. The insulation board joints were sealed using Protec resin with Polymat Taping Mat 450 which, in addition to providing additional strength to the joints, also creates a temporarily waterproof layer.For the inverted roof sections, Protec was applied directly to the primed concrete/screed surface. The membrane was inspected by Polyroof Technical Services, signed off and then covered with inverted roof components. An interesting fact when using Protec in inverted roof situations is its incredible durability performance – as tested by the BBA, Protec “can provide an effective barrier to the transmission of liquid water and water vapour for the design life of the roof in which it is incorporated”.Monitoring and CompletionThroughout the duration of the contract, Polyroof Technical Services carried out regular site visits that were reported back to Interserve as part of Polyroof’s free-of-charge contract monitoring service. This enabled the client to keep up-to-date with the progress of the roof installation in detail and also provided peace of mind that the original specification was being closely followed and implemented.Polyroof worked closely with the Roofline Group during the installation, enabling the challenges were identified and solved in an efficient and coordinated manner – saving the client time and money.
Sponsored
Museum of London - Visionary Roof

Museum of London - Visionary Roof

Bauder Ltd

Museum of London - Visionary RoofSynopsisThe Museum of London opened in 1976 on the historic London Wall and is a few minutes’ walk from St Paul’s Cathedral. A visionary approach to roofing had been adopted on a building that, will not only green as much of the exposed roofs as possible, but also provide a strong research aspect for future green roof projects. As with many buildings, the original roofs needed to be upgraded or replaced, at the same time as being brought up to date using environmental and sustainable solutions.Through the recommendation of waterproofing and green roof manufacturer Bauder Ltd, the Museum invited Dusty Gedge, one of the UK’s leading independent green roof consultants, to work directly with them to design 3500m² of varying habitats that encompassed the museum’s sustainable vision. and help in the provision of environments that would attract a range of wildlife, as well as being able to help the city adapt to climate change.Bauder Building BoardProject:Visionary roof, Muesum of LondonLocation:LondonProject type:RefurbishmentRoof size:9512m²Specifier:Museum of LondonRoofing contractor:Russell Trew LtdThe specificationAn independent consultant had previously carried out an energy model on the Museum of London buildings. When the museum inputted the green roof specification, it showed a potential energy saving of 10% per year, as well as a reduction on the future replacement costs of the heating and cooling plant. Some of the green roofs were funded through Drain London, a partnership project led by the Greater London Authority and funded by Defra. The project aims to better understand surface water flood risk across London, with a view to promote interventions (such as green roofs) to reduce surface water flooding. The museum has used the Bauder green roof system and worked closely with Dan Costen of Bauder and the roofing contractor Russell Trew Ltd, to deliver the various green roof spaces.These include:The refurbishment of the lower garden in the central courtyard with hard landscapingThe installation of Bauder’s new wildflower blanket to the upper garden in the central courtyard (funded through Drain London)Plug planting the roofs of the recently completed garden and terrace rooms that provide high quality corporate hire (matching the colour scheme chosen for the rotunda garden refurbishment and integrated with the new rainwater harvesting system funded by Renaissance London)An integrated sustainable urban drainage system (SuDS)Plug planting in other individual small roof areas including outside the boardroom and committee roomsTwo different planting schemes on an area of the main museum roof where the Drain London Project aims to carry out water attenuation researchThe resultRetrofitting green roofs will help to realise the Mayor of London’s ambition, to increase green cover in central London by 5% by 2030. The Museum of London is one of the largest retrofit green roof projects in the City and is certainly to be commended for allowing its roofs to be used for research purposes. Not only will it provide a benchmark for best practice, but it also demonstrates that retrofitting green roofs onto existing buildings is both environmentally and economically viable and is the way forward in helping London adapt to climate change.System installedBauderflex Green 1 BauderPLANT E 42A torch applied SBS elastomeric bitumen capping sheet. This product features chemically treated bitumen to deliver superior root resistance which has been tested and approved by the FLL2 BauderTEC Sprint DUOA self-adhesive elastomeric bitumen underlayer with DUO lap technology. This product has a glass fleece reinforcement feature for stability and strength.3 BauderPIR FA-TEFlatboard insulation boards containing rigid polyisocyanurate (PIR).4 BauderTEC KSD FBSA self-adhesive SBS elastomeric bitumen air & vapour control layer, with a mica finish.XF 301 Sedum System1 BauderGREEN XF 301Sedum vegetation blanket instantly providing at least 90% coverage on an extensive green roof. Integrated water retention and filter layer.2 BauderGREEN AL 4040mm high perforated edge/drainage trim frames and retains the Bauder XF 301 sedum system.3 BauderGREEN SDFMulti-functional drainage and filtration layer which prevents the roots of sedum plants from becoming waterlogged.4 BauderPLANT ETorch-on root-resistant capping sheet green.AdvocacyGavin McCourt MRICS, Project Manager for The Museum of London said:“In producing the business case for installing green roofs, reference was made to the extensive published documents on the benefits of green roofs. In this case as the museum building had already been energy modelled by outside consultants, it was decided to input the green roof specification into the model. The results showed a potential energy saving of 10% per year, as well as a reduction in future replacement costs for heating and cooling plant. These factors, combined with the longer life cycle replacement of green roofs compared with normal felt roofing systems, enabled me to produce a robust business case for green roofs. With increasing energy prices the economic benefits of installing green roofs can only become more viable”Dusty Gedge added:“One of the major issues that London faces is flash floods during the summer, when sudden rainfall levels overwhelm the current drainage network. With the support of Drain London we will be researching the rainwater run-off for different green roofs. This will help us validate the kind of roofs and depth of substrates that will negate the costly effects that the sudden rainfall has on the infrastructure of the City.”
Sponsored
Metal Roof and Gutter Coating - Well Lane, Wolverhampton

Metal Roof and Gutter Coating - Well Lane, Wolverhampton

Liquasil Ltd

Liquasil's BBA Approved Metalseal 20 roof coating and Gutterseal system were specified for use on the Airspace Trampoline Park in Wolverhampton. The whole roof was pressure washed and a historical cut-edge corrosion treatment was removed before application; the cut-edges were treated with our SWT Corrosion Primer, with additional reinforcement to the mid-laps through the installation of Liquasil's optional HP Butyl Tape.The whole roof was then coated with Metalseal 20 in Goosewing Grey at a filmweight of c. 300 microns to provide a protective, aesthetically pleasing finish.The gutters were cleaned out and dried before being primed with our SWT Corrosion Primer. Once touch-dry, the joints could then be sealed using our Non-Sag Sealer and a single coat of Liquasil One was applied to the entire gutter. Liquasil One can be immediately applied over the top of Non-Sag Sealer, meaning no time is wasted waiting for it to cure before the works can continue.The end result was a revitalised metal roof with a protective, water-resistant coating that is guaranteed for 20 years.

Showing 1-36 of 625

Feedback