NBS Source
I'm a manufacturer

"roller shutter"

597 results found

Sort by:

Showing 1-36 of 115

Sponsored
Dubai Metro Insulated Shutters

Dubai Metro Insulated Shutters

Hart Door Systems Ltd

AboutThe Dubai Metro Red Line, at 52.1 km (32.4 mi), is the world’s longest driverless single metro line. The planning of the metro was in response to a rapidly growing population and severe traffic congestion to relieve motor traffic and provide infrastructure for development.Project/doors200 Insulated Roller Shutters, both fire rated and non-fire ratedThe ChallengeThe Hart contract to manufacture over 200 industrial roller shutters to Dubai Metro, one of the most advanced urban rail systems in the world, was secured through the Al-Futtaim Group, who in turn were awarded by Chadwick Technology Group. Hart not only manufactured the doors but provided training to JT Metro JV, Dubai Metro Project.The SolutionManufacture over 200 Insulated Roller Shutters, both fire rated and non-fire rated for the Jebel Ali, Rashidiya and Al Qusais train depots. The shutters are designed to work in very sophisticated and complex systems including depot protection when driver-less trains are in operation.The SuccessThis was Harts largest export order to date and came on the back of large orders for Hart products for Heathrow’s T5 and the international railway terminal at St. Pancras. Once again Hart successfully delivered on a large scale project due to the engineering knowledge and project management experience.The ReviewYou have shown a high level of technical competence and professionalism in dealing firstly with the lengthy approval process, mainly due to the critical importance of the shutters for the automated operation of the Metro system, and secondly with the various site issues that invariably arrive on a project of this scale and fast track nature. Peter W. Mansell, Project Director, Chadwick SEC
Sponsored
Food & Beverage Industrial Doors - Taylors of Harrogate

Food & Beverage Industrial Doors - Taylors of Harrogate

Hart Door Systems Ltd

Bettys & Taylors of Harrogate is a fourth generation independent family business, passionate about some of the finer things in life – beautiful tea rooms, handmade cakes, traditional breads, proper tea and top quality coffee. They are the business behind Yorkshire Tea, Taylors of Harrogate coffee and the famous Bettys Café Tea Rooms.Project/doors: 5 Speedor Super, 1 Speedor Mini, 12 Fire Shutter, 21 Pedestrian doors, 1 Electric roller shutter, 1 Insulated Roller ShutterThe challenge Due to the size and weight of the insulated roller shutter at 10.5m wide and 6.3m high, this was a difficult installation in an area where the headroom was very tight. A crane was required to lift the shutter into position after opening two holes in the building’s roof so lifting chains could be dropped through to facilitate moving the shutter into position. The solutionHart was contracted by Sir Robert McAlpine to supply and install a range of industrial doors at the Taylors of Harrogate site.  This included the installation of the three-tonne insulated roller shutter completing a work package of over 40 doors. The success The installation of the shutter concluded a project which Hart was involved with through Sir Robert McAlpine and which saw almost every Hart door product installed – from Speedor high speed doors to fire shutters, security shutters and steel personnel doors. 
Sponsored
Acoustic Shutters at Hopton Holiday Village

Acoustic Shutters at Hopton Holiday Village

Bolton Gate Company

A refurbishment recently carried out at this holiday park in Great Yarmouth included the division of the large entertainment area to achieve a flexible, multi-use space. This features a sports bar one side with the other side hosting various activities such as exercise classes, kids’ activities, shows etc. Bolton Gate’s Sonaroll acoustic steel roller shutters were specified to divide the two spaces whilst providing reduced sound transmission when closed and when open, allowing the whole space to be used as a show-bar. The 100mm flat-faced laths allowed graphics to be applied depicting a boatyard scene
Sponsored
Heathrow Terminal 5

Heathrow Terminal 5

HAG Ltd. - The Door Specialists

Heathrow terminal 5 was a project over 20 years in the making. Designed to be the largest free standing building in the United Kingdom, Terminal 5 is a £4 billion development constructed to maintain Heathrow’s status as one of the premier international airports in the world. Built to handle 35 million passengers a year, Terminal 5 houses more than 100 restaurants and shops within the building for passengers to choose from. HAG’s role was to provide vital high-level security to a large number of shopping outlets, fitting our Alulink security grilles, Armourguard roller shutters and Alishield roller shutters.
Sponsored
Agriculture Industrial Doors- Cargill

Agriculture Industrial Doors- Cargill

Hart Door Systems Ltd

Cargill is an international food, agriculture, financial and industrial products and services business. Cargill connects farmers with markets, customers with ingredients, and people and animals with nourishment.Project/doors:32 doors across six facilities12 Storm, 3 Super, 3 Mini, 6 Insulated Fast Action Roller Shutters, 4 Electric Operated Roller Shutter 4 Special Doors. Ongoing replacement of old doorsThe challenge Hart were consulted to help reduce vermin access mainly from pigeons, seagulls and geese attracted by the feed/agricultural nature of the production process. The doors needed to be capable of thousands of operations in dusty conditions allowing large vehicles fast access to the facilities. The solution With over 30 Hart doors installed across six production facilities, the latest contract replaced existing roller shutters, which remain open all day, with seven Speedor Storms, one Speedor Super and one fast action roller shutter. The emphasis was on speed of open/close cycles to significantly reduce the vermin access and improve energy efficiency. The success The investment by Cargill is also part of a drive to improve energy efficiency by 5% and to maintain a better working environment and temperatures within the building as well as preventing unauthorised access to different areas of the plant. The Review:“I wanted to say I was really pleased with the job David and guys have done. They showed great work ethic, housekeeping was spot on and their attitude to safety on site was great- whenever they were challenged they were very patient and helpful.”Gavin Dunn, Project Engineer, Cargill
Sponsored
London Stadium

London Stadium

Hart Door Systems Ltd

London Stadium (formerly and also known as Olympic Stadium) is a multi-purpose outdoor stadium at Queen Elizabeth Olympic Park London.Project/doors:21 Fire and Security shutters (2010)50+ Fire and Security shutters (2015)The challengeHart assisted with the specification prior to the award. Technical collaboration was ongoing ensuring that integration and operation of the shutters went smoothly with safety and continuity in mind. Hart was subject to strict working practices and the factory was visited to review progress and audit Hart's quality system procedures.The solution2010 - Manufacture, supply, deliver and install 21 Fire Resistant and Security Shutters to the Olympic Main Stadium requiring advance battery backup and operational features. 2015 - Manufacture, supply, deliver and install over 50 Security and Fire shutters to the new build including kiosk shutters, security entrances and POD buildings surrounding the arena. The successHart was chosen out of 50+ door companies to supply all of the roller shutters to the London 2012 Olympic main stadium. Hart was again awarded all of the roller shutters under much competition on the stadium transformation project in 2015 which was transformed to cater for the multi-use environment.The review:“You should be commended for the cooperation, commitment and effort applied by your entire team. From early design discussions to your final commissioning activities of the 50 new shutters onsite, it was a pleasure to work with such proactive and knowledgeable organisation.” Jon Pepper, Project Manager, Balfour Beatty
Sponsored
Oswestry Golf Club

Oswestry Golf Club

Roché Systems Ltd

THE PROJECTOswestry Golf Club is an award winning golf club situated on the picturesque North Shropshire/North Wales border. Home to a James Braid designed golf course, state of the art clubhouse, and two former Ryder Cup heroes.They have recently increased security for their dedicated Greenkeepers compound. Heightened security included newly installed perimeter fencing, lighting and an insulated T77 double skinned aluminium roller shutter, with electric motor and safety brake.THE CHALLENGEThe client was looking for increased security for their main shed, with the added need for insulation to improve working conditions for ongoing maintenance work through the winter months.THE SOLUTIONThe T77 is a versatile aluminium roller shutter which is suitable for a wide range of domestic, commercial and retail applications. Its 77mm insulated slat rolls into a box as small as 250mm, and a maximum area of 16m² makes this shutter suitable for windows, doors and many other openings. ‘The aim was to give us increased peace of mind for our newest equipment and also a more usable space for the team throughout the year. The install was carried out in a timely and professional manner, and I am delighted with the finished project.’ Gary Barnfield – Head Greenkeeper
Sponsored
Louis Vuitton

Louis Vuitton

HAG Ltd. - The Door Specialists

HAG provided Security Roller Shutters For one of the world’s leading fashion designers, Louis Vuitton, securing the lobby areas of several of their department stores throughout the UK. By using our Alulink and Seceurovision 9000 roller grilles we ensured the premium products were securely protected against theft and the public’s view was not obstructed, to align with the grandeur of the store. The HAG team also used our quality powder coating in order to ensure the grilles were coloured appropriately for the stores, in line with their branding and stunning visuals.
Sponsored
Yorkshire Water Security Shutters

Yorkshire Water Security Shutters

Hart Door Systems Ltd

Hart Door Systems has worked with a number of UK water companies to improve site security and efficiency. In particular the need to secure remote and often unstaffed but vitally important sites. Water sites have particular needs which require reliable and secure doors and the engineering expertise that Hart offer.The challenge This Yorkshire Water had 3 existing un-secure horizontal doors. These manual operation doors had fallen into disrepair and presented a security risk. Automatic doors were required to provide efficiency and security. The solution The Hart solution was to install its roller shutters, fitted in a customised way to suit the environment and to ensure security, ease of installation and minimum disruption. One of the things Hart has significant experience in is fitting doors that add security features but without the need for additional structural works. Disruption was further minimised by working in collaboration with the main construction contractor, scheduling the work to fit in with not only the day to day operations, but other work happening concurrently.Because of Hart’s experience on sites such, existing vital operations were worked around – which continued during the removal of the old doors and installation of the new. The success Several more SR rated doors are planned at the same site, so that the company can replicate the success and the improved security that has been provided.Hart has gained invaluable experience working with various water companies installing high specification SR rated security shutters. These doors meet an established set of standards to prevent unauthorised access and have been tested and shown to minimise the threat of certain intruder attacks.For those sites that need constant access by people and / or traffic, the Speedor brand of doors can provide additional high speed operation. Speedor and SR doors can be used in combination to give complete flexibility and the best of both worlds.
Sponsored
ALL TYPE ROOFING - AUTOMATIC SLIDING DOOR

ALL TYPE ROOFING - AUTOMATIC SLIDING DOOR

Next Doors Ltd

Due to the bustling activity of our client’s builders merchant business, we recognised the need to enhance the accessibility and user-friendliness of their commercial unit. The existing setup featured a pedestrian entrance alongside a roller shutter entrance designated for goods in bay, which posed challenges in accommodating the high traffic flow and meeting customer expectations.To address these concerns, we proposed a comprehensive solution that would transform the customer entrance into a wider, more inviting space. A framed shop front system was strategically installed just inside the loading bay entrance, creating a seamless transition between the outdoor and indoor spaces. To ensure continuity and functionality, a short canopy roof was added, along with a heavy duty brush seal to bridge the gap to the roller shutter entrance.The focal point of our solution was the integration of a heavy duty commercial grade silent automatic bi-parting sliding door system. This innovative addition not only enhanced user-friendliness for customers but also facilitated rapid opening and closing, crucial for a busy builders merchant environment. By combining functionality, convenience, and efficiency, we successfully transformed the customer entrance into a welcoming and efficient gateway that catered to the needs of our client’s thriving business.
Sponsored
Baldovie EFW CHP

Baldovie EFW CHP

Hart Door Systems Ltd

Baldovie EFW CHP Facility is a energy from waste site using around 110,000 tonnes of residual waste per year from Dundee and Angus to generate electricity. Project/doors:7 Insulated Roller Shutter Doors1 High Speed Door - Speedor StormThe challengeDue to the nature of the build and technical challenges from the onset, Hart worked direct with the contractor and the consultants in the design phase to provide a solution to suit each challenge faced such as corrosion, odours, noise and infestationThe solutionInsulation is a key feature of an energy saving environment. Insulated roller shutters have a thermal value of minimum 0.69w/m.sq.k and 18db to minimise operational noise. The Speedor Storm is an extremely robust door with wind class 5 up to 8m. Moisture-controlled electrics protect from varying temperatures within a building, and mechanical components are protected from dust and dirt controlling the escaping dirt, odours and noiseThe successFollowing extensive communication with the contractor and the consultants to ensure the smooth running of the project, the steelwork was designed and installed correctly to allow for the timely installation of the Hart manufactured doors. Each door was made to measure and each activator and safety device fitted to suit the environment
Sponsored
Automotive Manufacturing  Industrial Doors - Komatsu

Automotive Manufacturing Industrial Doors - Komatsu

Hart Door Systems Ltd

Komatsu is one of the world leading manufacturers of construction, mining and utility equipment.Project/doors:Over 60 doors – Speedor Cleanroom, Speedor Storm, Electric Roller ShuttersThe challenge Safety and reliability are paramount in this highly efficient 200,000 sqm facility, which has produced over 60,000 units. Although only a small part of the building, industrial doors cause the biggest problems if they are not designed with the environment and usage in mind. The solution As a British manufacturer, Hart provides Komatsu with a first-class service, offering support and parts when required and due to the reliability of the doors, maintaining the safe, efficient running of the facility. Each Hart door is made to measure and each safety device and activator is fitted to suit specific areas, giving Komatsu a safe and secure working environment for its employees The success Komatsu and Hart began their relationship in the 80’s with the installation of one of Harts earliest prototype Speedors. Due to the success of the door, 4 Speedors and 4 roller shutters were installed in 1992. Over the years, Hart has installed over 60 doors to the facility, only recently replacing some of the original doors installed in 1992. The Review:“Good customer services and support.” Scott Atkinson, Komatsu, UK
Sponsored
O2 Arena

O2 Arena

ASSA ABLOY Opening Solutions UK & Ireland

AEG Europe, new owners of the Millennium Dome have transformed London’s landmark in to a major entertainments facility. The redevelopment of the 02 Dome, valued at over £600million was completed by main contractor Sir Robert McAlpine. ASSA ABLOY Security Doors Powershield designed, manufactured and installed over 250no doors including Powershield Personnel, Powershield Fire and Powershield Acoustic. Also included within the sub-contract works was the procurement and management of the roller shutter doors required... Click on the link below to read more.
Sponsored
Shell

Shell

HAG Ltd. - The Door Specialists

Bonny LGA on the Atlantic coast of Nigeria, where the huge multi-billion dollar Nigeria Liquefied Natural Gas (NLNG) industry and the terminals of several oil and gas companies, (including ExxonMobil - trading in Nigeria as Mobil Producing Nigeria Unlimited (MPNU), are established. HAG supplied and installed Armourguard & Alishiled Range roller shutters to numerous locations in the Niger delta to enhance the security of the Shell premises. HAG also trained local representatives of the main contractor to enable them to install HAG products on a supply only basis.
Sponsored
Primark

Primark

HAG Ltd. - The Door Specialists

HAG secured shop fronts, doorways and loading bays with a wide range of products including our Armourguard Roller Shutters and HAG Steel Security Doorsets. These were chosen to fully protect the store during closing hours, against theft and vandalism. Having tight security is extremely important for such a big store so we were honoured to be tasked with such a big part of the store’s running. While maintaining our trademark high standards, the contract was successfully completed within deadline and budget; a great success for all those involved.
Sponsored
Bolton Gate secure retail units in refurbished Victorian Market Hall Vaults

Bolton Gate secure retail units in refurbished Victorian Market Hall Vaults

Bolton Gate Company

As part of a £14 million redevelopment of Bolton’s Market Place Shopping Centre, the extensive historic vaults that lay beneath were uncovered and developed into bar and restaurant units. Bolton Gate were engaged to design, manufacture and install nine collapsible steel gates which spanned the openings some of which were arched and in keeping with the surrounding metalwork, a clear powder coating was applied over the galvanised substrate to match. In addition to the vault gates, Bolton Gate also supplied a series of roller shutters, smoke and fire curtains in the upper development of the project.
Sponsored
Specialist Speed Doors for a well-know British baker.

Specialist Speed Doors for a well-know British baker.

Tekta UK

This well known producer of bakery products was experiencing repeated damage and rising repair costs on their loading bay roller shutter doors. Beings a BRCGS accredited site, they could not afford to have their external doors damaged (or left open) for any period of time, as this creates an ingress point for rodents. Tekta were pleased to work with this site to create an effective solution. The Rapidor Impact high speed door was specified due to it's self-repairing feature and it's anti-rodent functionality. Click the "View More" button above to view the full case study.
Sponsored
Zi-Box Roller Blinds in Ikon Tower

Zi-Box Roller Blinds in Ikon Tower

Bandalux Industrial SA

Ikon Tower is an ambitious residential project located in Valencia (Spain) and designed by Ricardo Bofill architect. Nowadays, is the tallest building in the city with a hundred meters. The building was designed thinking in its inhabitants. The common areas include a gym, a swimming pool with a solarium, a gourmet area, and a Mediterranean garden. Being a skyscraper, light management was another important part of Bofil’s work. The façade has big openness in which our Zi-Box roller shades replace the classic shutters. They are configured with a blackout fabric that provides visual, acoustic, and thermal comfort. Thanks to its Easy Zip guides, the Zi-Box system offers total concealment and privacy. 
Sponsored
Rolls Royce - HAG supplies doors for the worlds largest exhaust pipe

Rolls Royce - HAG supplies doors for the worlds largest exhaust pipe

HAG Ltd. - The Door Specialists

2021 sees Rolls Royce unveil Testbed 80, the world’s largest & smartest indoor aerospace testbed, as part of a £90million investment. It has been a hard year for the aerospace industry, with production slowing, and cuts in jobs, however this ground breaking facility shows Rolls Royce’s confidence in the future of aerospace for decades to come.HAG Ltd. have proudly worked alongside Buckingham Group to assist in this ground breaking facility that will not only test propulsion systems of the future, but also secure jobs in Derby, UK for many years to come.HAG Ltd. were tasked with designing & manufacturing a roller shutter for this distinctive & state of the art facility, to enable Rolls Royce to test the largest, smartest and most powerful engines in the world by MDS Aero Support Corporation of Ottawa, Canada.HAG Ltd. designed, manufactured and installed 2 Armourguard F1 insulated roller shutters that were 7.5m by 15m. The F1 model is a high quality insulated security shutters delivering the highest level of security and offering thermal protection. A composite of foam filled sections is encased in a flat double skinned interlocking galvanised steel lath.The project:£90million project3 years of construction7,000 square metres, the same size as a Premier league football groundHouses the world’s largest exhaust pipeContains 3,218 tonnes of steelAnd 27,000 metres3 of concreteEquipped with a 40,000 litre fuel tankCapable of testing engines on Sustainable Aviation FuelThe most capable & complex testbed ever designed & builtWarren East, Chief Executive, Rolls-Royce, said: “Testbed 80 is the largest facility of its type in the world. However, it is not only big, it is also smart and features the most advanced testing technology we have ever used. As the new global hub of our testing capability, it will support the next stage of our UltraFan programme as we begin ground testing the first demonstrator in 2022. This incredible piece of infrastructure is a very visible sign of our commitment to this site and secures the future of Derby as the home of large engine development, continuing a history that began in the late 1960s with the RB211.”HAG Ltd. are proud to be part of this monumental development in the aviation industry.
Sponsored
Procter & Gamble

Procter & Gamble

Hart Door Systems Ltd

Procter and Gamble is the largest multinational consumer goods company in the world with 65 brands ranging from home care to skin care. Project/doors:Manufacture, install and service over 70 industrial doors across 6 sites. The challengeP&G’s first goal against climate change was to reduce greenhouse gas emissions at its facilities. The UK Environmental Agency also regulates the emissions at P&G Thurrock under an Integration Pollution Prevention & Control permit. Another important factor at the facility is efficiency and any works must cause minimal impact on production.The solutionHart has supplied over 70 industrial doors to the site. High-speed doors and insulated fast action roller shutters allow efficient traffic flow while controlling the heat, odours and noise. LPCB approved fire shutters safeguard employees and keep the building compliant with the latest legislation. Regular servicing maintains the reliability of the doors and the efficient running of the facility.The successThe relationship between Hart and Procter and Gamble spans 30 years, with more than 70 installations across six facilities. We have worked together to maintain and upgrade these manufacturing facilities without disrupting production.
Sponsored
Heathrow Airport Industrial Doors

Heathrow Airport Industrial Doors

Hart Door Systems Ltd

Heathrow Airport is the UK’s largest and busiest airport connecting the UK to over 80 long haul destinations and flying over 80 million passengers worldwide. Project/doors: Hart has over installed over 280 doors across all terminals including high speed smoke screens, fire conveyor shutters, security shutters, internal and external high speed doors, insulated fast action doors, sectional doors and pedestrian doors.The challenge Terminal 5 baggage handling system serves around 32 million passengers per year and handles around 6000 bags per hour.  Hart were asked to design, manufacture and install a specialist and unique automatic smoke screen system capable of handling over 6000 bags per hour, while providing a seal for 30 minutes in the event of fire. The solution Hart were the only company to provide a solution that fully met all the design requirements. Two years after the initial talks with the client, Hart successfully completed the manufacture and installation of all of the high speed smoke/fire screens within the main check in area, comprising 102 check in desks. Hart also installed a mixed package of roller shutter and fire doors in the lower ground service area and fire shutters on the Tube access tunnels leading directly to Terminal 5. The success Hart was chosen for the quality of engineering and the ability to meet the clients demanding specification and operating requirements. Hart continues to work with contractors and OEM’s such as Vanderlande, Mace and Balfour Beatty on site supplying upgrades and new doors when required
Sponsored
Infrastructure Rail

Infrastructure Rail

Hart Door Systems Ltd

Hart has supplied hundreds of industrial doors to infrastructure projects both across the UK and internationally.Project/doors:9 Electric insulated roller shutters14 Speedor Super high speed doorsThe challengeOld rail shutters are unreliable with a potential to free fall due to mechanical failure. Doors that are past their ‘asset life expectancy’ should be replaced to ensure up to date legislations are met. These areas tend to have varying traffic and need to be secure for safety. These dangerous situations can be remedied by replacing with new doors designed for purpose. The solutionHart completed a major contract to replace old and unreliable shutters at the Stewarts Lane depot, Battersea. The contract included the removal of old doors and re-installation of nine doors of varying sizes, the largest being 8.5m wide and 4.7m. Safedrive motors delivered quiet and smooth operation despite the size and improved security and safety for staff.The successHart replaced 14 of it’s own Speedors installed at Laira Depot, Plymouth which were still operational after 22 years. This is an astonishing length of service and a testament to the quality of product. Hart’s reputation for technical excellence developed over many years has given Hart a distinct edge when involved such contracts.The Review:“Your installation staff were extremely efficient and friendly workers. They carried out the work safely in a professional manner and there were no issues or problems on site. Both of them were a credit to your company.” First Great Western Ltd
Sponsored
Dupont - Manufacturing

Dupont - Manufacturing

Hart Door Systems Ltd

DuPont Teijin Films is a leading global producer of polyester films, specialising in film products and related services for many industries.The Project17 Hart doors including Speedor Super, Speedor Storm, Speedor Mini, Fire ShutterThe ChallengeDuPont required a company that could offer the reliability of both the industrial doors and the service provided. When doors are left open or closed for any length of time, it can directly affect the manufacturing process. DuPont needed a product and a company they could trust to provide reliable and consistent service, saving them money by reducing downtime.The SolutionHart has manufactured, installed and serviced a range of industrial high-speed doors for a range of benefits to the customer, including increasing efficiency by giving faster alternative access to the area, rather than using a large, slow roller shutter.The SuccessDuPont has chosen Hart as their door supplier for over 35 years due to the dependability of the product and service. DuPont put the investment in Hart due to the quality and longevity of Hart doors, understanding they are value for money with a low total cost of ownership and better return of investment than a cheaper product. Hart maintain 36 doors in total. The first Hart doors were installed in 1985.
Sponsored
Wolverhampton Market

Wolverhampton Market

Roché Systems Ltd

Wolverhampton market has recently undergone a major overhaul. The project involved closing all of the indoor stalls and moving them elsewhere; mainly into shipping containers which had been specially designed for the purpose.Project managers White Circle are at the forefront of the shipping container upcycling trend. While markets don’t traditionally tend to require much security at a stall level, relocating to permanent outdoor structures posed a new challenge. This was solved by installing a T55 security shutter on each of the 16 cabins. Openings measured from 1.6m to 2.9m wide, all at 2.3m high and with manual operation. An anthracite grey finish was chosen to complement the brightly coloured containers.T55 security shutters have 55mm slats, enabling a box size between 165mm and 250mm. The compact design makes them perfect for small openings where aesthetics are important.In Wolverhampton, stall owners were happy with their new accommodation. The Snack Bar café was based indoors for 19 years before the move. Co-owner Donna Walton said: “For us it’s been much busier outside. It’s been a big change but it’s for the best, and we love our new home now”.She continued: “At first I was worried whether the business would be more vulnerable being outside, but when the council told us we’d have roller shutters I felt relieved. They’re unobtrusive and really easy to open and close, too”.in addition we provided 9 of the Markilux 3300 patio awnings designed for widths of up to 5600mm and with a projection of 1500mm projection. These were manufactured with manual operation due to the reduced projection and gave stall holders ease of use depending on the conditions.The angular design was well suited to the shipping containers and the grey frame and fabric colour were chosen to keep a uniform look across all the different containers. 
Sponsored
Hyundai Workshop, UK

Hyundai Workshop, UK

Vebro Polymers

After 15 years service, the previously installed high-build coating system in this 900 m² Hyundai repair workshop was in need of some attention. Not only was the floor area damaged, dirty and drab, the risk of slips and trips across the facility was becoming problematic.After suitable mechanical preparation, repairs and infills, the substrate was coated with vebro EP OT Primer, a two-component epoxy priming product that is tolerant of residual oil contamination in concrete and cementitious floors, improving the adhesion of subsequent polymer floor systems.Chosen in RAL 7038 Agate Grey, Vebro Polymers’ high build coating system, vebrores EP HBC was able to deliver the perfect level of resistance to chemical attack from petrol, engine oils and other substances typically present in car workshop environments.The inclusion of anti-slip aggregates, encapsulated between the two coats of vebro EP Universal that make up the FeRFA Type 3 epoxy high-build floor system delivered additional slip resistance in critical foot-fall areas where rainwater may be present such as in front of the facility’s roller shutter doors, doorways and fire exits.
Sponsored
Required Testing and Certification Regime For CE marked fire shutters

Required Testing and Certification Regime For CE marked fire shutters

A1 Shutters Ltd

CE marking for fire shutters to BS EN 16034, BS EN 13241 following a fire test to BS EN 1634-1 is a legal requirement in the UK. https://a1sgroup.com/blog/a1s-group-policy-when-quoting-ce-marked-fire-shutters 
Sponsored
Queenborough School & Nursery - Coniston wall mounted canopy

Queenborough School & Nursery - Coniston wall mounted canopy

Able Canopies Ltd

The BriefQueenborough School and Nursery in Kent were looking to upgrade their outdoor space to create an all-weather outdoor learning and play area adjacent to one of their classrooms. As such, they contracted Carré Consultancy to source a supplier to help them create this new area and they chose Able Canopies.They wanted to create an outdoor area which could be used all year round. This created some challenges; outdoor spaces can become wet and slippery during rainy periods and too much exposure to UV rays can be harmful to our health.The SolutionThe staff at Queenborough wanted the area to look good whilst also offering functionality for lessons and play. As such, we proposed a 17.04m x 4.65m Coniston Wall Mounted Canopy that was supported by rear steel goal posts as the supporting wall was not suitable for a wall mounted structure. It was agreed that the canopy should feature side fills on both ends to block wind driving in from either side of the canopy and would be enclosed along the front with secure roller shutters and commercial fire doors. As we offer the whole package, we were also able to include the supply and installation of soft play safety surfacing underneath and leading to the canopy.
Sponsored
Flipper's Roller Boogie Palace, London

Flipper's Roller Boogie Palace, London

Junckers Ltd

When Flipper’s Roller Boogie Palace planned a London venue for its roller-skating experience, it needed a durable, sprung hardwood floor that could withstand the heavy traffic of a busy roller-skating rink. The choice fell on Junckers SylvaSport beech flooring, a trusted floor system suitable for a multitude of activities. Working closely with the designers 93ft, the experienced team at Junckers’ approved flooring contractor Hutchison Flooring devised the optimal layout and choice of flooring system for the best roller-skating performance possible. A meticulous installation plan which encompassed working alongside all trades on site was formulated and consequently followed to the letter in order to bring the project in on time and budget. The building for the new venue is a Grade II listed former power station, which meant there were restrictions on fixing to the original fabric of the building. The brief was that no alterations to the substrate were allowed, nor could the floor be fixed down, the entire flooring system had to be floating. The existing surface to build the floor from was a concrete substrate that was not completely level. To overcome the problem, Hutchison Flooring used a low-level New Era cradle and batten system from Junckers, which provided a laser-perfect level floor surface. Hutchison Flooring lay a polythene membrane with a 150mm overlap and taped joints to ensure sufficient vapour barrier followed by the cradle which involved carefully packing to the exact tolerances for every sprung cradle to ensure a perfectly level and flat floor for the skating ring. 22mm battens where laid in the cradles, brick bond staggered to create a perfect and reliable bond to the floor when nailed onto the battens. Junckers SylvaSport beech flooring was laid using a compression nailer on every batten on every row and 0.4mm spacers were included on every row to allow the correct expansion within the floor. Inspiration for the interior came from the original Flipper’s venue run by Ian Ross in the late Seventies and early Eighties. The client brief was for an immersive roller-skating experience with world-class sound and lighting. Central to the state-of- the-art indoor rink was a jet-black floor, an element the client insisted on. The black surface amplifies the atmosphere by maximising the reflection of the overhead lights, LED screens and mirrored panels on the sides. Junckers black-stained beech SylvaSport flooring has the desired jet-black, matt finish to provide the perfect backdrop to Flipper’s logo which is placed in the centre of the rink. Specialist court marking company MJ Courtmarkers custom made CNC laser cut vinyl templates of the logo which was painted with Junckers’ HP Sportsline line marking paint before being overcoated with HP Sports lacquer. 
Sponsored
Archies Restaurants - Shutters & Grilles

Archies Restaurants - Shutters & Grilles

Roché Systems Ltd

ARCHIES (Birmingham & Manchester)Archie’s is not only the place to be because of its vibrant décor, extravagant menu and celeb hot spot status, but at Archie’s, they are passionate about the quality of their food. They strive to ensure all their food is of the best quality and is all Halal and locally sourced with top food hygiene ratings.THE CHALLENGEThe client was looking for increased security for their restaurants in Birmingham and Manchester. We worked with their contractor Interiors UK to work out the best solution and for each site.  For Manchester we supplied and installed our E37 shutterFor Birmingham the Vulcan X2 Grille was the choice.Both products were supplied powder coated in the brands iconic Telemagenta, a vibrant pink. Just part of the service we can provide for you.
Sponsored
Folding shutters at Deptford Fire Station

Folding shutters at Deptford Fire Station

Bolton Gate Company

Deptford Fire Station is a Grade II listed building in Lewisham having been originally constructed in 1903. Bolton Gate supplied the folding appliance bay doors in the 1960’s and although still functional after fifty years, they were in need of replacement due to frequent usage. Since the building is listed, every effort was required to replace the doors on a like for like basis and Bolton Gate were engaged to supply new folding shutters to the same design which were installed and handed over recently. This is the latest in a list of several fire station contracts undertaken in London.
Sponsored
CASE: Motorised and concealed roller blinds and awnings across sliding doors

CASE: Motorised and concealed roller blinds and awnings across sliding doors

Blindspace

CASE: Motorised and concealed roller blinds and awnings across sliding doors
Sponsored
Special grille / shutter provided by Bolton Gate for refurbished building in London.

Special grille / shutter provided by Bolton Gate for refurbished building in London.

Bolton Gate Company

As part of the refurbishment of this 1970’s building, Bolton Gate were specified to provide a hybrid grille / shutter to the loading bay. In addition to providing vehicular entry / egress with the requisite ventilation for such an application, matching side panels were required with integral hinged doors to allow personnel access and provide emergency exits. The grille / shutter was provided with a special bottom rail and operates via a keypad outside, loop detectors inside and photocells / safety edge to meet H&S requirements. The whole assembly was powder coated brown in keeping with the surrounding structure.
Sponsored
RHS Hilltop

RHS Hilltop

HAG Ltd. - The Door Specialists

OverviewThe UK’s first dedicated horticultural scientific centre of excellence has opened to the public – protecting the future of plants, people, and the planet at the iconic RHS Garden Wisley, situated in Woking, just 30 minutes outside London. RHS Hilltop has been dubbed The Home of Gardening Science, and at a cost of £35 million, is the largest ever investment in horticultural science. The site boasts 3 purpose-built laboratories, a herbarium and digitisation suite, learning studios & a teaching garden, interactive displays and a world class collection of horticultural exhibits across 3 gardens that brim with ideas that reflect the latest research. RHS Wisley’s library and archive contain rich and varied collections, including botanical art, 28,000 horticultural books & records, which places itself as the most complete record of the UK’s horticultural heritage. PartnershipHAG Ltd. were chosen by Geoffrey Osborne Ltd. to work on RHS Wisley’s impressive and forward-thinking purpose-built space to offer fire protection & security solutions across the site, including in the herbarium and café. With over 35 years of industry experience, and being well known for our quality, integrity, and reliability, we were the perfect choice to offer solutions to fire protection and security needs, meaning a more streamlined experience for the main building contractor. Andy Jasper, Programme Director of the Wisley Strategic Investment Programme:“We are so proud to announce the opening date of RHS Hilltop – The Home of Gardening Science. Working so closely and collaboratively with Contractors and Consultants was wonderful and together we have overcome the challenges of Covid-19. We would like to express our most sincere thanks to all the teams and individuals involved in this project who have worked so hard and with such passion and commitment.” The ProjectLike many new builds, RHS Hilltop used the very latest in environmentally friendly techniques in their build process. This included installing their own renewable energy sources, using high levels of insulation and astonishingly, 99% of waste during construction was recycled. The RHS Hilltop facility measures 4,750 square meters and was part of a wider 5-year transformation program at RHS Wisley. With an investment of £35 million, it is easy to see how seriously the Royal Horticultural Society are taking their legacy and setting themselves in good stead for scientific research in the future. HAG installed fire curtains and fire shutters across the site, which are essential to ensure safety and time to exit the buildings in the event of fire. Our insurance-certified roller shutters were supplied and fitted to their exacting standards and are fully covered by LPCB Certification, to give optimum security protection. We were pleased to be involved in such a stunning development and look forward to working with both Geoffrey Osborne Ltd and the RHS again in the future.
Sponsored
Superior Folding Shutters, Hong Kong Fire Stations

Superior Folding Shutters, Hong Kong Fire Stations

Bolton Gate Company

Bolton Gate’s Superior folding shutters have been specified and used on over 100 Fire Stations in Hong Kong & Macau, the latest being the station built to service the infrastructure associated with the new Hong Kong–Zhuhai-Macau bridge, the longest sea-bridge in the world. The doors are designed to meet an onerous specification including typhoon loads up to 3kPa and fast operating speeds (approximately 700mm per second). They are designed and manufactured in the UK and shipped to Hong Kong where they are installed by Deacon & Co., Bolton Gate’s local agent.
Sponsored
Premium Plus roller blinds in Loyola University

Premium Plus roller blinds in Loyola University

Bandalux Industrial SA

The project is distributed on several buildings connected by a corridor , completely bathed in light, but under sustainable and ecological purposes. Our Premium Plus roller shades contribute to cover its high ceilings and provide perfect sunlight management in the classrooms while maintaining the views. The combination with the Polyscreen ® 351 White allows great solar reflection, and acoustic absorption. They contributed to achieving the LEED Platinum Certification, being the first university to get it in the entire world.
Sponsored
Premium Plus roller shades in Le Thémis

Premium Plus roller shades in Le Thémis

Bandalux Industrial SA

The project Le Thémis is a display of sustainability . The north façade is made out of glass to attract natural light and create reflections . Thanks to our Premium Plus Roller Shades with Polyscreen ® 550 , thermal and visual comfort is achieved . The fabric guarantees an excellent thermal protection , managing up 94 % of solar heat, while being a highly efficient sunlight filter .The entire building received several recognitions in terms of energetic efficiency such as HQE, Breeam , Effinergie + Biosourcé .

Showing 1-36 of 115

Feedback