NBS Source
I'm a manufacturer

"lightning conductors"

15 results found

Did you mean?

lightning conductor
Sort by:

Showing 1-5 of 5

Sponsored
University of York Student Residences

University of York Student Residences

Alumasc Roofing

Heslington East Campus Student Residences: Sustainable and Efficient Expansion Alongside the preservation of listed buildings, the University of York is investing in a flagship £130m development for students that promotes wellbeing, community, and sustainability. The initial phase sees 16 brand new student accommodation blocks and 2 communal hub buildings providing flexible social spaces. Surrounded by stunning lake views and natural habitats, the buildings are part of a huge initiative to expand the student accommodation offering.GOALSArchitects Sheppard Robson alongside Graham Construction sought to futureproof accommodation by incorporating multi-use buildings, including catering outlets and social hubs. Key to the brief was using the latest in safety, energy efficiency, longevity, and warranty credentials. Graham Construction’s use of modular external sandwich panels, prefabricated steel bathroom pods, and pre-assembled services distribution racks used Modern Methods of Construction with off-site construction techniques.CHALLENGESThe major challenge was to specify a roofing system that could keep up with the pace of the build, given the typical building was constructed from start to finish in circa 14 weeks.The roof deck comprised of precast concrete slabs which facilitated the works programme for speed of construction and consistency in build quality.Alumasc’s challenge was to find not only a waterproofing solution that was able to keep up with such speed of construction but also to meet a truly sustainable life cycle equalling the lifetime of the building.A key consideration in the design was the roofing materials’ thermal properties. To meet the u-value target of 0.15, Alumasc’s XPS Plus insulation was specified, providing a single layer of 175mm, which reduced the height of the overall build-up when compared traditional XPS.SOLUTIONHydrotech 6125 Waterproofing System / Derbigum Hybrid Upstands For over half a century Hydrotech Monolithic Membrane has been successfully used by architects and specifiers, ensuring some of the world’s most prestigious buildings and structures are kept watertight. With no product failures in over 50 years and guaranteed waterproofing integrity for the lifetime of the structure, Hydrotech offers a total life cycle solution for the building.Hydrotech was specified on the main roof areas for this project as it easily meets individual requirements of the buildings. In addition, the system is designed to last the lifetime of the building or structure to which it is applied, giving long-term waterproofing integrity and no future replacement costs.Applied in a hot liquid state to the deck, and including a polyester reinforcement, the bond of Hydrotech MM6125 is 100% absolute. There is no risk of water tracking below the membrane and because it is monolithic, no possibility of lap failure.DERBIGUM WATERPROOFINGDerbigum sustainable roof system was selected for the upstand areas. This hybrid solution was developed to improve the thermal efficiency in all areas to mitigate against cold-bridging with minimal insulant thickness. Derbigum bituminous membranes are high-performance waterproofing systems offering extended warranties and the highest levels of project support. The upstand zones benefited from Derbigum Mineral which is a mineral surfaced composite reinforced membrane.ROOFTOP MANAGEMENT STRATEGYIn addition to the waterproofing solution the buildings benefit from the full Alumasc rooftop management service. This included the design and supply of safety systems, accessories, and over 20 AOV smoke hatches meeting all British and European standards.Specific safe zones were designed by Alumasc Roof-Pro and positioned around all roofs for safe access. Purpose made clips for installing lightning conductor tape without roof penetration were also provided. All rooftop accessories are part of the Alumasc Roofing specification and therefore can be found back-to-back within the Alumasc 35-year system warranty.PROJECT DATACompletion: Autumn 2022 BuildingType: Student Accommodation ProductApplication: Hydrotech & Derbigum waterproofing systems Certification: BBA Approved & European Technical Approval Architect: Sheppard RobsonMain Contractor: Graham ConstructionAlumasc Registered Roofing Contractor: Tandragee Roofing
Sponsored
Barrisol Light® - Alfa Romeo Historical Museum - Italy

Barrisol Light® - Alfa Romeo Historical Museum - Italy

Barrisol

The production site was closed in 2009 along with the museum but Alfa Romeo wished to convert the site into a place of memory matching the Group's ambition for this brand coming back. Today, the museum homes the most important collection of cars from the Alfa Romeo brand. Indeed, you can find the 69 car models that have made mark on history of the brand. Barrisol sheet : 815 sqm of translucent blanc Venus sheet with star white harpoon. Profile used : BS 350/01 Lightning : LED strip
Sponsored
Access Ladder at The Royal College of Music

Access Ladder at The Royal College of Music

Step On Safety Ltd

Situated in South Kensington, the home of science, arts and inspiration, and directly opposite the Royal Albert Hall, the Royal College of Music is one of the world’s great conservatoires, training gifted musicians from all over the world for international careers as performers, conductors and composers. Opened in 1883 by the then Prince of Wales (later Edward VII), the RCM has trained some of the most prestigious figures in British and international music life, including composers such as Holst, Vaughan Williams, Turnage and Britten; conductors such as Leopold Stokowski, Sir Colin Davis and Sir Roger Norrington; singers such as Dame Joan Sutherland, Sir Thomas Allen and Alfie Boe and instrumentalists such as Sir James Galway, John Lill, Gervase de Peyer, and Natalie Clein. Bringing an older building up to code regarding health and safety is always a challenge. Modern amenities were squeezed into spaces as they became available, but the emphasis was always on preserving as much of the original building as possible; going back in – often decades later – to make those spaces safe for maintenance crews or to replace outdated systems that involves crawl-spaces, false walls and hidden hatches.It was just such a request we received recently. A GRP Cat Ladder and RiserDeck floor with access hatch were required to allow work on the hidden pipework within a very narrow space. The ladder needed to be positioned in such a way that the pipe behind it wouldn’t be kicked; the hatch would be small, so needed to be 100% snag-free and the ladder height required safety hoops to help prevent falls. After drawings were approved by our client, the ladder was built onsite at Step on Safety and cut in half to allow it to be loaded onto a flat bed vehicle and to ensure it could be manoeuvred into position once it reached RCM. You can see from the photos that even the two-man installation team would have been a tight squeeze! GRP is lightweight so the fact that only two people could be there to lift it into place wasn’t a problem and being GRP, now the ladder is there, it will last for decades to come.Find out how Step on Safety can fill the gaps in your Health & Safety certification by calling Amber on 01206 396 446.
Sponsored
Altro Wood adhesive-free - Yuuki, Japan

Altro Wood adhesive-free - Yuuki, Japan

Altro

A lightning-fast flooring solutionIssueYuuki, a commercial flooring installer in Japan, wanted to try the adhesive-free floor concept for themselves before recommending it to their customers. With the opening of a new office and store, and needing the opening to be completed quickly, installation of an adhesive-free floor posed a good option. Yuuki also wanted to demonstrate adhesive-free floors to customers, helping them to understand the concept and the benefits.ApproachPresident Oshima of Yuuki Flooring said: “When I first heard about adhesive-free floors I was surprised. This is a new concept in Japan to have flooring without adhesives. However, I was very curious to see how it would install, and what the outcome would be. The installation was very fast, and I thought this floor is an amazing solution for me and my customers. This floor is easy to install even in busy areas and has great potential. It’s been more than six months since the installation, and we have not experienced any problems with the floor.”SolutionYuuki flooring wanted to open their new flooring store as soon as possible, and without compromising on design. Yuuki decided to use Altro Wood adhesive-free due to the speed of installation, minimal downtime and the wide range of wood designs."The installation was very fast, and I thought this floor was an amazing solution for me and my customers. This floor is easy to install even in busy areas."  President Oshima Yuuki Office"It’s been more than six months since the installation, and we have not experienced any problems with the floor." President Oshima Yuuki Office
Sponsored
Protecting the Fabric of the Building: New Avenue Case Study

Protecting the Fabric of the Building: New Avenue Case Study

illbruck – a brand of Tremco CPG UK Ltd

In the construction industry, contractors move at lightning speed to source the best products at the right price for their projects, all with the goal of ensuring client satisfaction and meeting tight deadlines. Renowned for our leading sealing, bonding, and insulation solutions, a selection of illbruck products were chosen through our extensive distribution network for the New Avenue project in Oakwood, London.The ProjectErected in an affluent neighbourhood within the London Borough of Enfield, New Avenue is an idyllic development boasting the peace and tranquillity of suburban life, whilst being only a stone’s throw from the hustle and bustle of Central London.Due to consist of over 400 mixed-type homes, ranging from apartments, maisonettes, as well as houses, this eight-year development will also include a community and energy centre, in addition to a new nursery. The SolutionDuring phase two of the new housing scheme, illbruck’s expertise were called upon to provide a vapour control layer for the Reinforced Concrete (RC) frame element of the project. This was to restrict warm, moist air from the interior of the finished structure from entering the fabric of the building. For the 11-storey block of flats, Central Essex Interiors required a solution at a competitive rate from a manufacturer with a good supply chain, due to the extensive size of the project.As a brand of CPG UK, illbruck has been recognised for over 70 years across the UK, Europe, and around the globe for supplying high performing solutions that meet the stringent requirements of the construction industry. Catering to a wide range of installation environments for both interiors and exteriors, from major building schemes to home improvements, our solutions can be tailormade to you or your client’s specification.The ApplicationProcured through one of our distribution partners, AC Fixings Ltd, illbruck ME003 Vapour Barrier was stapled into the party walls of the construction to achieve adequate vapour control. 500 rolls of this innovative 3-ply solution were required to protect the fabric of the building and its insulation, by providing a vapour and airtight seal. This in effect will help to improve the overall energy efficiency of the New Avenue apartment block, due to the product’s high-grade granules, which means that the SD value (resistance to vapour diffusion) is not lowered. The flexible and tear-resistant nature of this product boasts ease of application due to its lightweight properties, and is compatible with a number of illbruck’s intelligent window membranes and adhesives.Following the installation of ME003, illbruck’s ME315 Total Protection Tape was used to provide a high performance air and weather tight seal. This special tape is suitable for a wide variety of applications, and achieves a permanent bond to all illbruck indoor and outdoor building protection membranes. This fully compatible solution is highly UV and moisture resistant, quick and easy to install, and can be used within partially open facades. ME315 is also certified to EMICODE EC1 due to its low emission production, contributing to the energy efficient properties of ME003 to provide a total green solution for New Avenue.Scott Hurry, Area Sales Manager for illbruck, commented: “It has been a pleasure to work with our valued customer, AC Fixings, who in turn have supplied Central Essex Interiors with two of our leading products from our sealing and vapour control range.“illbruck was chosen due to being a highly recognised name within the marketplace, and we have been able to work with the Client to supply the products at a competitive rate and turn the project around quickly. The installation is due to span over a course of seven months with completion scheduled for late 2023.“When working with illbruck, however, you will receive more than just products. Behind our brand is a team of experts beholding a wealth of knowledge and industry experience, all of whom are well versed in applying the technique of illbruck’s innovative, high-quality products into the complexities of today’s construction environments. “As a customer of illbruck, you will receive technical support as and when is required, in addition to our suite of training, which encompasses everything from CPD seminars for architects, application tutorials for contractors and installers, as well as trade mornings for distributors.”

Showing 1-5 of 5

Feedback