NBS Source
I'm a manufacturer

"lifts"

1,168 results found

Sort by:

Showing 109-144 of 272

Sponsored
Megapad Pedestals lifting terrace to window level on period building

Megapad Pedestals lifting terrace to window level on period building

Wallbarn Ltd

The customer wanted to build a deck on the first storey of a period building in Chicago The windows opening out on to the roof were positioned considerably higher than the rooftop itself, which meant that the structure deployed to support the deck would also need to raise it up almost a metre to meet the threshold. We recommended a number of our heavy-duty Megapads ranging from 711mm to 876mm to account for the gradual fall in the roof. The customer chose not to envelope the pedestals because he liked the industrial look created, in keeping with downtown Chicago.
Sponsored
Stannah’s NEW Microlift Evo: a Prinny-approved not-so-dumb waiter?

Stannah’s NEW Microlift Evo: a Prinny-approved not-so-dumb waiter?

Stannah Lifts

Whisking food, drink and tableware between the ground-floor dining room and lower-ground kitchen, a dumbwaiter makes life so much easier for everyone in The Charm, a plush 19th-century boutique hotel in Brighton's Kemptown. Not only does it improve service for patrons, it also protects personnel from the pressures of manual handling.
Sponsored
GlaxoSmithKline: Bespoke lifting from Penny’s for ground-breaking ‘Factory in a box’

GlaxoSmithKline: Bespoke lifting from Penny’s for ground-breaking ‘Factory in a box’

Penny Hydraulics Ltd

Penny Hydraulics has partnered with design and operations consultancy Bryden Wood on an ambitious and ground-breaking construction project for pharmaceutical giant GlaxoSmithKline which has resulted in estimated construction cost savings of 30% and a build time reduction of two months when compared to traditional building methods.
Sponsored
German online retailer improves its distribution centre performance

German online retailer improves its distribution centre performance

Lödige Industries

German online retailer improves its distribution centre performanceLödige Industries equips distribution centre with 12 goods lifts in 3 yearsOver a period of three years, Lödige Industries has delivered 12 SHERPA goods lifts to a newly built distribution centre in use of a German online retailer. The customer required a solution which would guarantee high throughput and availability together with compact construction. After installing nine SHERPA goods lifts in 2013, the customer decided to install two more SHERPA in 2015 and one in 2016. How does the customer benefit from relying on SHERPA goods lifts?Save spaceThe customer needed a compact lifting solution. Altogether four different elevator sizes were installed for this customer. The sizes fit the different pallets and picking trolleys, which the customer is using. Additional space was gained by reducing the floor space of some SHERPA freight elevators. Pallets and picking trolleys are moved efficiently and without disturbances between levels.Structural conditions do not complicate the installation of the SHERPA as the motor is located in the head room. Moreover, the control cabinet can be positioned remotly from the lift. Access for maintenance is provided via a maintenance gap above the upper door to the shaft head room. The area around the lifts can thus be used for other purposes.Flexible integration12 SHERPA goods lifts in total had to be optimally positioned. The foundations of the hall supports and the hall ceiling girders had to be taken into account. The Lödige SHERPA comes with a free-standing shaft structure and hence it does not require any rack modifications. By using 80 mm high ramps, it was possible to dispense with shaft pits for the SHERPA freight elevators. As a result, the freight elevators could be optimally positioned without any structural changes, thus achieving a high degree of flexibility for integration into the racking systems.High throughputMore importantly, the customer required a solution that offers a high throughput. Usually, goods lifts have a transportation speed of 0,2m/s. The 12 SHERPA goods lifts at this project offer a maximum transportation speed of 0,4m/s. This means, the lifting frequency for the customer was doubled.Challenges for the online retailer in doubling frequencyTaking structural conditions of the existing rack warehouse into account, as no change to the racks and building itself can be madeTransport of pallets and picking trolleys in different sizesDifferent lifting capacities and lifting heights necessaryIncreasing throughput of goods over several levels of the rack warehouseSolution from Lödige and benefits for the customerSHERPA goods lifts come with a free-standing shaft and no need for a pitCompact construction by installing goods lifts in two customized sizes, lifting capacities and heightsDoubled lifting speed of 04,4m/s leading to high throughput
Sponsored
Home elevator EcoVimec with masonry shaft

Home elevator EcoVimec with masonry shaft

Vimec SRL

The Home Lift installed in this private house is an EcoVimec Home lift, which has been chosen to increase comfort and add value to the property. The owner chose EcoVimec home lift because it’s electric and environmentally friendly (it has reduced energy consumption and doesn’t use hydraulic oil).The EcoVimec Home lift has been designed to fit within a masonry shaft, offering a compact and space-saving solution to access multiple floors of the house. The cabin has been designed to be as discreet as possible, with a low profile and modern appearance that complements the property perfectly.
Sponsored
Royal Botanical Gardens, Kew Treetops Walkway

Royal Botanical Gardens, Kew Treetops Walkway

Radii

Working with City Axis, Radii AG designed, manufactured and installed a glazing package for the 22 metre high glass lift enclosure at the Royal Botanical Gardens, Kew.The refurbished lift shaft provided access to the site's 'Treetop Walkway'.
Sponsored
Growing Yorkshire Company Reflects on Relationship with Penny Hydraulics

Growing Yorkshire Company Reflects on Relationship with Penny Hydraulics

Penny Hydraulics Ltd

In July this year, Penny Hydraulics worked with Yorkshire Soap to install a 250KG Mezz Lift to support their operations.Yorkshire Soap, a vastly expanding soap company, reached out to Penny Hydraulics in 2020, enquiring about installing a Mezz Lift in their factory.
Sponsored
MezzLift Improves Factory Efficiency

MezzLift Improves Factory Efficiency

Penny Hydraulics Ltd

Improved handling efficiency, better utilisation of space and enhanced safety have been achieved by Bott Limited following the installation of a Mezz Lift from Penny Hydraulics to lift loads from ground floor to a mezzanine in the stores at its dedicated commercial vehicle conversion workshop facility.
Sponsored
Greenford Station

Greenford Station

AATi (Antislip Antiwear Treads International)

Greenford station has become the 67th step-free Tube station and recently has been proudly showing off its innovative new lift. The new incline lift is a first of its kind as it doesn’t travel straight up and down - it travels alongside the newly refurbished staircase and new escalator!
Sponsored
Residents benefit from space-saving PEGASOS in apartment building

Residents benefit from space-saving PEGASOS in apartment building

Lödige Industries

Residents benefit from space-saving PEGASOS in apartment buildingElegant apartment building in the modern residential area of Königstein gets more parking space through boundary development with PEGASOS car lift.In the wooded slopes of the Taunus mountains in the catchment area of Frankfurt lies the climatic health resort of Königstein. People who want to escape the big city find a pleasant home in this modern and preferred residential area outside of Frankfurt. Rents have been rising throughout the Frankfurt area for many years. Also in Königstein rents are well above the average in Germany. Lödige Fördertechnik GmbH supplied a PEGASOS car lift for an apartment house in Koenigstein, Germany. The lift is used as an access to the garage in the basement.Creating attractive living space despite rising rentsMany residents and commuters in this region are dependent on own cars because of public transport connections. Anyone who has visited Königstein is familiar with the parking conditions: hilly, narrow streets lead to a low number of parking spaces. The owner of this project was faced with the question of how living space could be designed attractively despite the rising prices and lack of parking spaces?The Karl Dudler Architects had a vision for the centrally located private building in the heart of Königstein: a modern and comfortable apartment building with straight and clear structures, consisting of 2- and 4-room flats.Installed in November 2014, Lödige Industries was able to successfully implement the architects' vision with the PEGASOS ® car lift. As the shaft head in this project was installed outside the building and thanks to the narrow shaft geometry of the lift, it looks like a single garage from the outside when equipped with roller doors, which underlines the modern design of the building. The PEGASOS car lift also stands out for its ease of installation, as this model does not require a pit and can thus reduce underground engineering costs. Also, a machine room is not required. Residents can easily reach the desired floor with the help of a remote control.  The building, which was completed in November 2014, is a KfW Efficiency House (55). Thanks to reduced drive power and higher efficiency, the PEGASOS is significantly more energy-efficient than hydraulic car lifts and can therefore also be used in KfW-efficient houses, as here in Königstein.We are pleased to have achieved an all-round positive result for the customer. The car lift is maintained by Lödige Industries as part of a service contract.Application of the elegant, space-saving solutionDue to the surroundings and the layout of the building, the owner was looking for a space-saving parking solution. The property did not have a straight side boundary. The PEGASOS® car lift offers the ideal solution for, this situation, because due to its low shaft head height, this model can be used as a boundary construction.The parking space regulations in Königstein set a precise number or parking spaces for residential buildings, which could not be achieved here using the conventional way, an access ramp. Thus, the owner was threatened with a high redemption sum.The owner could reduce civil engineering costs due to the simple installation and the fact that this model does not require a pit.Compared to hydraulic car lifts, the PEGASOS is significantly more energy-efficient thanks to reduced drive power and higher efficiency.Due to the outside installed shaft head and the narrow shaft geometry of the lift, it looks like a single garage from the outside when equipped with elegant roller doors.
Sponsored
Easy Move home elevator in South Africa: a perfect synthesis between the customer and our partner

Easy Move home elevator in South Africa: a perfect synthesis between the customer and our partner

Vimec SRL

DescriptionModel: Vimec Easy Move cabin liftStops: 2  Type of building: Private House  Country: South Africa  The customer’s desire was to have a lift that would allow him to move around comfortably and stylishly. After an on-site talk with our partner, in order to fit well into his home design, the customer sought a modern and robust solution like Vimec Easy Move homelift.
Sponsored
Life-Changing Equipment Provides Freedom & Independence

Life-Changing Equipment Provides Freedom & Independence

Guldmann Limited

The Aquatic Centre in the Northern Rockies Regional Recreation Centre has installed a ceiling lift system that enables wheelchair users to be independent when using the changing rooms.During the downtime in the COVID-19 lockdown, the people working at the Aquatic Centre decided to upgrade the changing room with a Guldmann GH3 ceiling lift solution. They knew that several of their visitors would benefit from this upgrade and they also knew of customers that were not able to use the facilities because they needed more assistance.Their vision was to make the Aquatic Centre accessible for a wider group of people, and they succeeded: When the Aquatic Centre re-opened to the public, the result was life-changing.On the first day, the crew had tipped a regular customer whom they thought would benefit from the ceiling lift to come swimming.The customer brought her support worker but ended up being able to do everything herself because she was able to use the new lift in the changing room.As she worked through getting ready to go for a swim, she used the lift to get herself out of her wheelchair and into the sling, changed herself, lowered herself into one of the aquatic chairs and got into the pool all on her own.She was then able to do it all over again when she was finished.Previously, a wheelchair user who wished to swim in the pool would have to hire helpers or ask family members to come with them and help transfer them from the wheelchair to the aquatic chair.Now, wheelchair users can come to the Aquatic Centre and be just as independent as the majority of the visitors.
Sponsored
Soho House & Co select Penny Hydraulics: Electric Cinema chandelier winch system

Soho House & Co select Penny Hydraulics: Electric Cinema chandelier winch system

Penny Hydraulics Ltd

The main focal point at the Portobello site is a huge vintage chandelier which hangs beautifully within the main auditorium. Penny Hydraulics, having been selected as the lifting equipment partner on other projects throughout the Soho House chain previously, were contacted to specify a winch system to mechanically lift and lower the chandelier, so that it could be quickly and easily accessed at regular intervals for cleaning, to have the bulbs changed, or for routine maintenance.
Sponsored
Wellington Hospital, London

Wellington Hospital, London

Planet

Balfour Beatty approached Planet Partitioning with a high-performance refurbishment specification for the UK's largest private hospital. For all the patient and treatment rooms, Planet Partitioning used p20 demountable glass partitioning with Eclipse sliding doors. FireStop partitioning ensured that lift lobby partitioning has a fire integrity and insulation rating of EI120/120. Doors for the lift lobby are fire rated for EI 60/60 and steel framed.
Sponsored
North Pole Depot

North Pole Depot

Lionweld Kennedy Group

Lionweld Kennedy provided 'North Pole Depot' with the supply and installation of 2nr maintenance access gantries with integral lifting beams, end stairs, demarcation fences and removeable polyester powder coated lift out handrails.Owned by Hitachi Rail, the North Pole Depot gives direct access to both West London and North London Lines.Utalising our range of safegrids and saferails, we created a accessible and safe platform, which complies with British and European standards.
Sponsored
IKO Permatrack Bridge Surfacing Saves Tower Bridge

IKO Permatrack Bridge Surfacing Saves Tower Bridge

IKO PLC

The bridge was closed in September 2016 for three months while necessary repairs were made to the lifting sections, walkways and approaches.
Sponsored
The Nook - 21st Century State Of The Art Hospice

The Nook - 21st Century State Of The Art Hospice

Guldmann Limited

The initial design consultation took place in February 2015 and owing to the complex nature of the building, the pitch of the roof, the angled internal ceilings and seamless patient transfer requirements from room to room, it was clear that a fully co-ordinated design approach was required.Throughout the design and subsequent construction phase, the Guldmann team adopted the 4 C’s method (Coordination, Cooperation, Collaboration and Communication), to realise the optimum specification, installation and various commercial benefits with all of the stakeholders (including the site team RG Carter), to deliver the hoist systems as agreed by EACH.In total, a mixture of 22 GH3 and 3 GH3+ ceiling hoists were installed in 27 rooms, with Combi-lock systems incorporated to enable effortless transfers between rooms.The award-winning GH3 ceiling hoist is a unique lifting module with a simple yet elegant design that is user-friendly and powerful enough to handle lifting and moving procedures in all professional care settings. The GH3 module also charges itself through the rails in the bedrooms, ensuring that the hoist is always ready to use.The GH3+ lifting module offers a number of more specialised advancements over the standard GH3, allowing Guldmann, when required, to tailor a hoisting system to a facilities specific needs.Tailoring includes adding modules such as an Integrated Weigh Scale or Care Lift Management (CLM) which can be used for monitoring and improving procedures for safe patient handling and for optimising resource planning.
Sponsored
CapaCITY Two Tier Racks

CapaCITY Two Tier Racks

Cyclepods Ltd

The CapaCITY two tier is a highly convenient gas assist two-level bicycle parking system. The lifting system ensures that a bicycle can be parked on the top level effortlessly. Galvanised steel upper arm Upper arm on casters for easy glide action. Upper arm reaches to the floor for ease of loading bike. European manufacture for quality assurance. Welded and bolted construction. Security bolts give additional security. Gas assist action: Dampers stop upper arm from falling down uncontrolled. Lifts loaded upper arm with little effort.
Sponsored
Regather Install a MezzLift to Aid Growth Throughout Pandemic

Regather Install a MezzLift to Aid Growth Throughout Pandemic

Penny Hydraulics Ltd

Regather, is a not for profit, community food business which aim to create value-based food chains. Established for over a decade, the locally sourced fruit and veg box section of the business has doubled in size during the Covid-19 Pandemic. Regather only had a very small area for a goods lift to be installed due to the main entrance and a staircase. Goods Lift Design Engineer Umar Lodhi was up to the task and created a MezzLift design that not only fits the space but does not block the entrance to the building when the doors were open
Sponsored
The Royal Opera House

The Royal Opera House

CAT (Carpet Accessory Trims) Limited

Our 19mm solid brass turned stair rods were installed to complement the classic theme and give that subtle lift to the large, grand staircases.
Sponsored
Eclisse supply the Lukas Koch foundation with Eclisse Hoist Pocket Door Systems.

Eclisse supply the Lukas Koch foundation with Eclisse Hoist Pocket Door Systems.

Eclisse UK

Sliding pocket doors are hugely beneficial when designing new or refurbished accommodation for people with disabilities where inclusive design is deemed important. More than 30 sliding pocket door systems and 11 Eclisse Hoist pocket door systems have been installed inside the new building. The Eclisse Hoist pocket door system has meant that a hoist lift can be between rooms to transport the young people from one area to another. Three ECLISSE Hoist pocket door systems have been installed in the physiotherapy area and a motorised lifting system in the pool area.
Sponsored
Easylift Premium Two Tier

Easylift Premium Two Tier

Cyclepods Ltd

The Easylift Premium is a highly convenient gas assist two-level bicycle parking system. The lifting system ensures that a bicycle can be parked on the top level effortlessly. - Easy to use: a. Light aluminium upper arm b. Upper arm on casters for easy glide action c. Upper arm reaches to the floor for ease of loading bike - European manufacture for quality assurance - Welded and bolted construction. Security bolts give additional security - Gas assist action: i. Dampers stop upper arm from falling down uncontrolled ii. Lifts loaded upper arm with little effort
Sponsored
122 Leadenhall Street

122 Leadenhall Street

KONE plc

122 Leadenhall is a building of global firsts, boasting the world’s largest and fastest suite of panoramic lifts. But the real stunner is the design – nothing comparable has ever been attempted before.
Sponsored
London School of Economics - Saw Swee Hock Student Centre (SAW)

London School of Economics - Saw Swee Hock Student Centre (SAW)

A J Wells & Sons

A.J Wells manufactured three hundred square meters of coloured vitreous enamel cladding covering a lift shaft in the new students centre at the London School of Economics and Political Science on its Aldwych campus.The striking building, known as the Saw Swee Hock Student Centre (SAW), was designed by Dublin based practice O’Donnell & Tuomey Architects with the aim to transform the student social experience by creating a student hub at the heart of LSE’s campus. The centre houses a number of student facilities and offices including a gym, media centre, internet cafe and a pub!Vitreous enamel was specified for the external cladding of the lift shaft because of its durability, low maintenance and unique, vibrant surface finish.
Sponsored
Worth Abbey School

Worth Abbey School

Gooding Aluminium Ltd

Gooding Aluminium were delighted to be asked to proved the ceiling panels for this project. Fabricated and powder coated in a vibrant yellow, this featured ceiling is a fantastic example of how you can really lift a ‘ordinary’ space.
Sponsored
Quayside House, Gloucester

Quayside House, Gloucester

Cellecta Ltd

Quayside House is a multi-purpose 3-storey health and wellbeing centre that includes two GP surgeries serving around 17,500 patients, a pharmacy, office space, and 81 parking spaces. A redevelopment was appointed by Gloucestershire County Council as the building was a vacant asbestos ridden 1960s building. There are four staircases and integral lifts to the second floor as well as a further 3 lifts dedicated to first floor, serving both GP practices.Cellecta’s ScreedBoard 20 was specified by ADP Architecture due to it being the ideal overlay floorboard for acoustic applications. ScreedBoard 20 was laid upon a first floor over PIR to achieve U Values as the build was unable to accept a wet screed due to weight restrictions upon the ground.Kier Group was awarded this 2,500m² contract to construct this development in the centre of Gloucester.
Sponsored
North Court, Jesus College, Cambridge

North Court, Jesus College, Cambridge

Anderson, GEC Ltd

New GEC Anderson stainless steel worktops lift the shared kitchen environment within the college accommodation. The practical, durable yet aesthetically pleasing worktops feature integral upstands and wet zones around sinks for ultimate functionality combined with an uncluttered appearance.
Sponsored
Silk district - MEET IP

Silk district - MEET IP

Fermax UK Ltd

674 residents Across 4 phases and three buildings.Using 262 x NEO 7” IP Monitors and 412 x WIT 7” IP Monitors within the apartmentsWith 12x Marine Digital IP Entrance panels. Lift control and Concierge. 
Sponsored
Aluminium Sliding Door System - MasterPatio

Aluminium Sliding Door System - MasterPatio

Reynaers Aluminium

Introducing the next generation of sliding systems. MasterPatio is a high insulation and high performance lift-slide system with minimalistic look and clean design, down to the details. The system combines top thermal performance with slim sightlines and a maximum element height of 3.7 m.
Sponsored
Landmark Modern 6 Storey Building – 2 City Walk Leeds

Landmark Modern 6 Storey Building – 2 City Walk Leeds

Resopal

Resopal® High Pressure (HPL) Digital Print Laminate was used to create a stunning impact in a six storey development in Leeds. The panelling to lift surrounds in the office tower atrium was designed by Oblong Furniture and manufactured and installed by Absolute Interiors in Malachite LED 7273-60
Sponsored
Hand Loaded MezzLight Helps Canterbury Archaeological Trust Move Boxes Safely and Efficiently

Hand Loaded MezzLight Helps Canterbury Archaeological Trust Move Boxes Safely and Efficiently

Penny Hydraulics Ltd

Canterbury Archaeological Trust chose a Hand Loaded MezzLight to safely and efficiently move archive boxes between floors in their new premises. The lift was designed and installed by Penny Hydraulics to avoid the need to manually move items the boxes between floors, speeding up the process and reducing the risk of injury.
Sponsored
Lendlease Barangaroo, Sydney

Lendlease Barangaroo, Sydney

SAS International Ltd

Design and integration of services was a key element to the success of the Lendlease Barangaroo fit-out. SAS International worked alongside both Lendlease and Hassell's project teams to ensure the SAS products integrated into the existing base build ceilings. SAS330, SAS500 and SAS750 were used in the office areas, cafe, lift lobbies and circulation areas.
Sponsored
New London Stock Exchange

New London Stock Exchange

Albion Stone plc

Block was pre-purchased by Stanhope for the project. Finished stone was manufactured at Albion’s Factory over a 50 week period. The Grove Whitbed was also used on the internals through the foyer and up onto the lift lobbies.The Building Research Establishment “BRE” provided the testing, which was completed in advance of the production programme as a direct result of the block pre-purchase.
Sponsored
Homelift Easy Move – Private House, Port Laois

Homelift Easy Move – Private House, Port Laois

Vimec SRL

The completion of the hydraulic home lift with stainless steel cabin and masonry shaft in the UK home was a remarkable success, surpassing the homeowner's expectations for both aesthetics and functionality. The stainless steel cabin's innovative design significantly improved the residence's visual appeal while providing enhanced durability and longevity. The masonry shaft's blend with the home's architectural elements ensured a seamless and elegant installation.
Sponsored
Regency Place featuring Reynaers SL 68 Slim line aluminium window system

Regency Place featuring Reynaers SL 68 Slim line aluminium window system

Reynaers Aluminium

Comprised of 82 luxurious one and two bedroom apartments in the heart of Birmingham City centre, featuring Reynaers CF 68 single leaf bi-fold door, SL 68 slim line window, CW 50 curtain walling and the beautiful CP 130 lift and slide door. These high-spec apartments are located in an unrivalled location making it attractive for both tenants and investors.
Sponsored
SIEGENIA produces its 100,000th COMFORT UNIT

SIEGENIA produces its 100,000th COMFORT UNIT

Siegenia-Aubi Ltd

Six years ago, SIEGENIA became the first manufacturer the world to facilitate the purchase of thresholds for lift and slide elements in the form of customised complete solutions – on 4th July, the 100,000th COMFORT UNIT left production from the Hermeskeil site. The all-in-one trouble-free package from SIEGENIA, which is now being produced at more than 2,500 units a month, is continuing its successful development.

Showing 109-144 of 272

Feedback