NBS Source
I'm a manufacturer

"handrails"

1,026 results found

Sort by:

Showing 37-72 of 151

Sponsored
Manchester Airport, Manchester

Manchester Airport, Manchester

Rapid Ramp Limited

PROJECT BACKGROUND: Work had begun on the airport’s 10-year, £1 billion transformation programme. The airport hoped ’the programme would “transform passenger experiences and help attract yet more of the world’s leading airlines” (The Manchester Airports Group: 2017).REQUIREMENT: Our assignment involved the installation of semi-permanent wheelchair ramps in the temporary lounge. These ramps were designed to offer temporary wheelchair accessibility for both visitors and staff.The lounge plays a pivotal role in the larger transformation initiative, facilitating the redevelopment of the current Terminal 2.END RESULT:Our skilled installers effectively constructed ramps on the airport runway's eastern and southern sides, meeting the scheduled timeline and budget requirements.FEATURES INCLUDED: Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp and to help users distinguish any level changes.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Rest Platform – a rest platform at 5 metres is required to allow the user to pause.1100mm High Rail – these handrails attach to any level sections. Continuous Handrail - this handrail system ensures the users always have support to hold onto.EXTRA FEATURE INCLUDED: Fully Compliant Step Unit – an ideal addition to any ramp installation, providing the access needed for able-bodied users. They can also be stand-alone units, independent of the Rapid Ramp System.
Sponsored
Doncaster Carr IEP Depot

Doncaster Carr IEP Depot

Lionweld Kennedy Group

Lionweld Kennedy supplied and installed both open mesh flooring and GRP light out removeable handrails to 4 twin level access gantries at the 'Doncaster Carr IEP Depot' for Hitachi Rail Group.We supplied and fixed demarcation fencing with integral gates to form the stores area within the facility.Also, we supplied and fixed internal depot protection to fork lift routes, including column protection, bollards and spring steel barrier systems.Using both steel open mesh flooring and GRP handrails was a great cost solution for the client, as we were able to utalise our products to create a safe working environment which is fully compliant with British and European standards.
Sponsored
Burton Rugby Club, Burton-on-Trent

Burton Rugby Club, Burton-on-Trent

Smart Balustrades

Client: RL HarrisonContract value: £50kProducts used:3kN loading rectangular post balustrade with glass infill panels to viewing areas1.5kN loading 48mm diameter stainless steel balustrade to main staircaseWe were appointed to provide more than 90 metres of balustrades and 25 metres of handrails to Burton Rugby Club’s new Battlestead Croft site in Burton-on-Trent. This project involved supplying and installing balustrades and handrails to the viewing areas and main staircase of the new facility – with two important factors to consider: ensuring we stayed within the client’s budget, and selecting the most suitable products to provide an optimum viewing experience for visitors. The initial design drawings showed a vertical bar system along the viewing area, but this was not aesthetically pleasing and would have limited the view of the pitch for wheelchair users. We worked closely with the client to find the correct solution – as structural glass would have exceeded the client’s budget, we chose a balustrade system with 60×30 rectangular posts that are capable of achieving 3kN loading, with clear toughened glass infill panels. We also increased the height of the handrails, both for additional safety and to ensure it would not obscure the view of the pitch for wheelchair users. 
Sponsored
GDF Suez Cygnus Bravo

GDF Suez Cygnus Bravo

Lionweld Kennedy Group

Lionweld Kennedy designed, fabricated and supplied modular flat packs of both steel and GRP gratings, handrails, barrier ladders and gates to the 'GDF Suez Cygnus Bravo' gas field, which is owned by Heerema Fabrications. Using both steel and GRP, Lionweld Kennedy were able to design a system of walkways and handrails around the 250km2 field. Cygnus Bravo is an unmanned satellite wellhead platform tied-back to Cygnus Alpha’s processing platform. Cygnus Bravo is located approximately 150km off the coast of Lincolnshire, UK.Both our steel and GRP products can withstand harsh environments, such as oil rigs due to their durability from the high-quality material.Using both products in conjunction allows for a cost-effective flooring and safety solution for the client.
Sponsored
Broadleaves Extra Care, Newark

Broadleaves Extra Care, Newark

Smart Balustrades

Broadleaves, in Boughton, near Ollerton, is the fourth ‘housing with care’ scheme to be opened by Newark and Sherwood District Council. The state-of-the-art scheme has been designed for people aged over 60.There are 30 spacious and accessible apartments designed to meet possible future needs, with features including a wet room and wider doorways.SMART Balustrades were contracted by NMCN to design, manufacture and install their stainless steel balustrade system with oak handrail to 4 stairs as well as 15 stainless steel Juliet balconies, 250m of timber corridor handrails, and a large external terrace with 1600mm high stainless steel balustrade.SMART’s timber balustrade system comes complete with a steel core rail to ensure the balustrades meets the required 0.74kN/m horizontal line load requirements.
Sponsored
Orbis OS211 and OS251 for St John Plessington Sixth Form

Orbis OS211 and OS251 for St John Plessington Sixth Form

Delta Balustrades Ltd

Products:OS211 Orbis Glass Infill Top Fix Stainless Steel BalustradeOS251 Orbis Standalone (No Infill) Powder Coated Double Handrail BalustradeContractor: Read ConstructionArchitects: AHR ArchitectsIt was great to work with Read Construction on this new two storey extension to St John Plessington Catholic College. With a total project value of £1.3m, the vision was to create a new state of the art Sixth Form Centre with significant internal renovations prior to the extension to enhance existing spaces.Deltas role in the project consisted of supplying and fitting:68m of our Orbis OS211 Glass infill Balustrade System with Stainless Steel Handrail to the internal atrium and stairs.37m of powder-coated Orbis OS211 Top Fix Glass infill Balustrade Systems to the external retaining wall.27.5m of powder-coated Orbis OS251 no infill balustrade with a double handrails to the external steps and ramps.Aside from balustrading requirements, this education sector project introduced an open plan learning centre, media room, eight new classrooms, and new break out space with a canopy for students. The outcome has exceeded expectations and created an adult-focused learning environment for sixth form students, similar to a university setting, as well as providing more space for the increasing pupil numbers at St John Plessington Sixth Form College.Image credits: Read Construction Holdings Ltd
Sponsored
Permanently fixed roof ladder system – Ascent Aluminium Roof Steps ; Sheffield Aerospace Manufacturers.

Permanently fixed roof ladder system – Ascent Aluminium Roof Steps ; Sheffield Aerospace Manufacturers.

Safety Fabrications Limited

The Ascent Aluminium Roof Access Steps were specified to meet the clients requirement to create a safe access route up & over the “saw-tooth” roof for maintenance personnel. In this instance the Ascent steps were specified for use with an adjacent MSA Latchways climb-latch fall protection system. If collective protection is required handrails can be supplied to one or both sides of the steps. The Ascent Aluminium steps were specified for this project by Eurosafe Solutions Ltd a specialist fall protection company who also installed steps. The Ascent Aluminium walkway steps are tested for use on the aluminium standing seam roof and are secured back to the roof sheet using a proprietary support clamp. The Ascent aluminium walkway is designed in accordance with BS EN 516:2006 Prefabricated accessories for roofing, BS 4592, Industrial Type Flooring and stair treads, BS EN ISO 14122-3 Stairs, stepladders and Guardrail, BS 7976-2:2002+A1:2013 Pendulum slip resistance. And is manufactured under ISO 9001 and CE 1090 factory production control procedures, creating a walkway that is CE / UKCA compliant.The walkway steps can be configured with a handrail to withstand a loading of either 0.36 kN (general duty) or 0.74 kN (heavy duty) and can be supplied with an optional toe-board if required. The system can achieve these loadings without the need for additional bracing, allowing the walkway to be placed against the area to be accessed. UKCA / CE marked. Designed & Tested in accordance with BS EN 516:2006 Class 1 Type C. Designed & Tested in accordance with BS EN ISO 14122-3:2016 where a handrail is fitted. Designed & Tested in accordance with BS 4592-0:2006+A1:2012 for loadbearing and BS 7976-2:2002+A1:2013 for anti-slip. With or without handrail.Standardized modular system roof walkway system. Can be supplied with a range of fixing kits to suit different roof profiles.
Sponsored
Crowne Plaza/Holiday Inn Express Dual Brand Hotel, Heathrow Terminal 4

Crowne Plaza/Holiday Inn Express Dual Brand Hotel, Heathrow Terminal 4

Smart Balustrades

Client: Grove Developments/Arora HotelsContract value: £362kProducts used:  0.74kN loading stainless steel with glass balustrade to stairs1.5kN loading structural glass balustrade to link bridgesThe dual-brand Crowne Plaza and Holiday Inn Express, which operates under Arora Hotels, is located at Heathrow Terminal 4 and opened in 2018. It consists of 300 rooms as well as business and meeting facilities. The building is directly connected to Heathrow’s Terminal 4 via an air bridge and also offers convenient access to the London Underground, Heathrow Express train service and nearby major motorway routes. We were instructed to supply and install more than 600 metres of balustrades, as well as over 300 metres of wall fixed handrails during the hotel’s construction phase. The balustrades used for the project were 1.5kn structural glass balustrades to bridges and 0.74kN loading stainless steel with glass balustrade to stairs. We provided approximately 300 metres of structural glass balustrades to the hotel’s link bridges. At the design stage of the project, we were advised that the bridges could deflect by 25mm, so our balustrade design had to accommodate this. The solution was simple but very effective – we left a 5mm gap in between each five-metre length of track, which was not noticeable when walking along the bridges but allowed for adequate movement in the structure with no damage to the balustrades or the finishes, and no compromise to the overall look. In addition, we adapted our handrail system to provide protection to the walls where guests wheel trollies and luggage into the hotel. By fixing handrails along the flooring close to the walls, it provided a functional yet attractive solution to avoid any marks or scratches that luggage might create.The overall result was a mix of balustrades to the hotel’s stairs and link bridges, plus handrail finishes to the high-traffic areas of the premises that all fit in with the building’s modern and clean design. 
Sponsored
Wall Protection - Countess of Chester Hospital

Wall Protection - Countess of Chester Hospital

Gradus

Gradus has supplied and installed a range of bespoke wall protection solutions throughout the new Same Day Emergency Care building at the Countess of Chester Hospital. Fitted by the Gradus Contracts Team, the system includes wall guards, corner guards and combination handrails.
Sponsored
Hilton Garden Inn, Terminal 2, Heathrow Airport

Hilton Garden Inn, Terminal 2, Heathrow Airport

Smart Balustrades

SMART were contracted to design, manufacture and install 250m of stainless steel with glass balustrade, 200m of wall fixed handrail, 100m of trolley bump rails as well as 100m of 1500mm high 3.0kN loading structural glass balustrade to the roof top bar.
Sponsored
Ockbrook

Ockbrook

Canal Architectural

Canal were approached to manufacture and install an exclusive feature staircase for a private residence in Derby. The Cantilever staircase structure was manufactured in mild steel and features American Black Walnut box treads with a laminated glass balustrade.The upper floor featured structural glass balustrading with a stainless-steel slotted handrail that connected to the staircase structure. The handrail was fully welded, satin polished and featured a floating balustrade. The treads underneath the staircase featured strip lights to create ambience and blended perfectly with the contemporary and minimalistic features of the property. The client commented that the finished structure ‘looked superb and was pleased with the overall result’At Canal Architectural we take on board all specification requirements to ensure that the finished staircase design is functional, practical and aesthetically pleasing. The Canal site team worked closely with the contractor to ensure smooth fitting in line with current UK building regulations.
Sponsored
Front Door Ramp, Woking

Front Door Ramp, Woking

Rapid Ramp Limited

REQUIREMENT:A ramp to the entrance of the council house.Rapid Ramp’s demountable system was ideal as it requires no groundwork.Once no longer needed, the ramp can be removed and reinstalled at a different property owned by the local authority.END RESULT:The front door ramp was installed within only a few hours. The system fully complies with Document M, Volume 1, Dwellings.FEATURES INCLUDED:Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Standard Handrail - this handrail system ensures users always have support to hold onto.Powder coated Finish – Rails are coated with thermosetting powder to provide a non-conductive, non-slip and scratch resistant surface.Telescopic Legs - these can be adjusted to accommodate different threshold heights.EXTRA FEATURE INCLUDED:Step & Gate Unit - access for able-bodied users.
Sponsored
COVID-19 Testing Site, Accrington

COVID-19 Testing Site, Accrington

Rapid Ramp Limited

BACKGROUND: The facility will open at the Eastgate Car Park as part of the Government strategy to improve localised access to coronavirus tests.REQUIREMENT: Fully compliant ramps and steps in double quick time to allow the site to open before the end of the week. ADDITIONAL INFORMATION: A few hours after receiving the enquiry and measurements, CAD/technical drawings and a quotation were drawn up and sent to the client.  END RESULT: The measurements were received Monday evening, and all components were picked and packed Tuesday morning and delivered to site for Wednesday morning.The systems were fitted by our installation team Wednesday, ready for use by Thursday at midday.We were true to our name, delivering the project rapidly in less than a week. This was achieved with our in-house team, which included a site surveyor, designer, and installers.All components were available from stock and ready for installation as soon as required.FEATURES INCLUDED:Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp. Additionally, it helps users distinguish any level changes. The colour yellow is chosen because as a bright colour, it has the ability to reflect light. Therefore, it makes it easier for the user to see whilst reducing the risk of trips and falls.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Mesh Platform - this self-draining mesh platform allows water to pass through rather than puddle on the surface and potentially freeze.Rest Platform – a rest platform at 5 metres is required to allow the user to pause.1100mm High Rail – these handrails attach to any level sections.Continuous Handrail- this handrail system ensures users always have support to hold onto.EXTRA FEATURE INCLUDED:Standard Step Units - an ideal addition to any ramp installation, providing the access needed for able-bodied users. They can also be stand-alone units, independent of the Rapid Ramp System.ACCESS RAMPS & STEPS FOR PREFABRICATED BUILDINGS:Like modular buildings, our ramps & steps are prefabricated systems, carrying benefits including:A fast construction time - Ramp installations are typically completed within a 1 to 2-day turnaround time. Components are manufactured and stored in-house.Easy to remove – Once no required, ramps can be disassembled within a few hours.Design and build flexibility - Ramps can be re-designed and re-configured to suit different sized areas.Cost-effective – Our access ramp has a life span of over 25 years with no maintenance costs.Environmental benefits – Ramp components can be reused under our ramp recycling scheme.Safety features - Includes handrails for grip and a slip-resistant mesh platforms as standard.
Sponsored
Coca-Cola Enterprises, Wakefield

Coca-Cola Enterprises, Wakefield

Rapid Ramp Limited

REQUIREMENT: Able-bodied access to the cabin. ADDITIONAL INFORMATION: We quoted and produced technical and CAD drawings, with reference to the finished floor height measurement supplied by the modular building company.END RESULT:Our expert installers fitted a step system as shown. FEATURES INCLUDED: Mesh Platform - self-draining mesh allows water to pass through rather than collect on the surface.Trombone Ends - these are added to the ends of a step system to prevent clothes catching.Telescopic Legs - these can be adjusted to accommodate different threshold heights.Standard Continuous Handrail - this handrail system ensures users always have support to hold onto.Standard Colour Black - ramps are powder-coated black, to create a durable finish that is tougher than conventional paint.THE COMPLETE RAMP PACKAGE:An all-inclusive, stress-free option which we managed in-house.This package includes a site survey (if applicable), quotation, CAD and technical drawing, supply, and installation. 
Sponsored
Orbis OS221 and Mono M310/M311 for Greenhead College

Orbis OS221 and Mono M310/M311 for Greenhead College

Delta Balustrades Ltd

Products:Externals: OS221 Orbis Midrail Infill Top FixAtrium: M311 Mono Glass Infill Top FixStairs: M310 Mono Glass Infill Side FixContractor: Galliford Try Construction LtdArchitects: Ryder ArchitectureThe £25m redevelopment of the Greenhead Sixth-Form College Campus was one of the first Net Zero Carbon in Operation school buildings built by the Department for Educations Rebuilding Programme.Galliford Try Construction enlisted Delta to fulfil the requirements of this balustrade and handrail package – totalling 280 metres of balustrade system.With Greenhead College situated within the Greenhead Park Conservation Area and in close proximity to historic buildings, the more traditional tubular Orbis powder coated balustrade with midrail’s was installed to the external steps.Whereas a more sleek, modern aesthetic was decided upon for the atrium and stairs in the form of Delta’s Mono powder coated balustrade with stainless steel handrails and glass infill secured with a bolt-through banjo lug.
Sponsored
Orbis OS210 Glass Balustrades Installed at Castle Park View, Bristol

Orbis OS210 Glass Balustrades Installed at Castle Park View, Bristol

Delta Balustrades Ltd

914m of Orbis OS210 balustrades and handrails installed in the tallest residential building in the city centre of Bristol, Castle Park View. With Orbis balustrades with glass infill installed to 48 flights of stairs in just 14 days.The 26-storey residential tower provides 375 new homes, hosting a rage of sustainable features and achieving a level four in the Code for Sustainable Homes certification.
Sponsored
Bognor Regis, West Sussex

Bognor Regis, West Sussex

Rapid Ramp Limited

REQUIREMENT: A robust step system with handrails to aid a visually impaired tenant in accessing their garden.The council owns the property; therefore, the specifier required a product that can easily be removed in the future and leave little to no impact on the building.Our system was ideal because safety features, including yellow tread strips, could be fixed along each step nosing, and a rubber crumb cover could be laid over the surfaces to prevent the tenant from slipping.The product is also easily removable and only requires minimal bolting.ADDITIONAL INFORMATION: CAD and technical drawings were designed by our specialist designer in-house.END RESULT: A step system with three risers and a platform was installed in less than a day. The steps fully comply with Part M and K of Building Regulations for dwellings. All council properties must adhere to these guidelines. FEATURES INCLUDED:Trombone Ends - these are added to the ends to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Standard Handrail - this handrail system ensures users always have support to hold onto.Standard Colour Black – Systems are powder coated black to create a durable finish that is tougher than conventional paint.Telescopic Legs - Legs can be adjusted to accommodate different threshold heights.EXTRA FEATURES INCLUDED:Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp. Additionally, it helps users distinguish any level changes.Safetread Rubber Surface - This is a soft, slip-resistant surface that reduces the impact of falls. The product is made from the same materials used in soft play areas and is ideal for nurseries, schools, and public facilities. It is available in a range of colours and will continue to perform in all weather conditions.
Sponsored
Old Trafford

Old Trafford

Lionweld Kennedy Group

Lionweld Kennedy designed, fabricated and supplied the vomitory stairs and handrails for Old Trafford, the home of Manchester United, East Stand Development.Due to an expansion in 1999, Manchester Unites ground undergone works to add a second tier to the East stand of Old Trafford, this increased the capacity to 61,000.We supplied and designed the stairs to ensure all fans were comfortable, while ensuring all health and safety standards were met.
Sponsored
Conquest Hospital, St Leonards-on-Sea

Conquest Hospital, St Leonards-on-Sea

Rapid Ramp Limited

PROJECT BACKGROUND:As pressure continues to build on the UK’s health service, Conquest Hospital's Emergency Department urgently needed to transform their current staff welfare area with additional space, achievable with a modular extension.The design included a canteen space, toilets, shower rooms, storage areas and lockers for NHS staff.REQUIREMENT:External developments included an accompanying ramp to overcome the exterior door threshold. The works needed to be achieved within a quick turnaround time and with minimal disruption to the daily running of the department.SITE SURVEY & DRAWINGS:We responded rapidly with a site survey soon after the initial enquiry.This project benefitted from the Lidar scanning technology used by our site surveyors.The machine scanned and plotted the heights and widths of the objects in view, including different floor levels.Our in-house designer then created a 3D visual of the ramp on top of the lidar model, ensuring to draw around any obstructions.The final 3D & 2D drawings were after given to the client with their quotation.END RESULT:Once the extension was near completion, the ramp was fitted in an L shape configuration within a day, minimizing disruption.FEATURES INCLUDED:Standard Handrail - this handrail system ensures users always have support to hold onto.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Powder Coated Finish – rails are coated with thermosetting powder to provide a non-conductive, non-slip and scratch resistant surface.Telescopic Legs - these can be adjusted to accommodate different threshold heights.EXTRA FEATURES INCLUDED:Yellow Powdercoated Handrails – yellow is one of the easiest colours to see because of its ability to reflect light.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp and any level changes.
Sponsored
Carlisle Park Pavilion Cafe, Morpeth

Carlisle Park Pavilion Cafe, Morpeth

Rapid Ramp Limited

BACKGROUND: The Pavilion was being refurbished, ready to be re-open as a new café to help increase tourism to the town.Plans included creating a new terrace at the front, a small rear extension, and a portable office/store at the back.REQUIREMENT: A modular ramp to the terrace for pedestrian and wheelchair use. END RESULT:Our installers fitted a Rapid Ramp, which included a pedestrian walkway with a loading capacity of 1,000kgs. It is designed to safely support the weight of varies public traffic, including walkers, prams, wheelchairs, and mobility scooters.The installation was completed within a few hours on a snowy late evening.FEATURES INCLUDED: Mesh Platform - self-draining mesh allows water to pass through rather than collect on the surface.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Telescopic Legs - these can be adjusted to accommodate threshold heights.Continuous Handrail - this handrail system ensures users always have a support to hold onto.Standard Colour Black - ramps are powder-coated black to create a hard finish that is tougher than conventional paint.EXTRA FEATURES INCLUDED:Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp and helps users distinguish any level changes.CONCRETE VS PEDESTRIAN METAL RAMP INSTALLATIONS:Unfortunately, newly poured concrete must be protected from freezing for the first 24 to 48 hours and requires drying time before use. Therefore, concrete installations are heavily reliant on good weather conditions, and cannot be completed in snow or frozen temperatures.Unlike concrete, our pedestrian ramps can be installed in most weather conditions, including snow. Plus, the product is manufactured from galvanised steel.Galvanising is a process where a protective coating of zinc is applied to prevent rusting and to kill moss.
Sponsored
Fulham Road

Fulham Road

Canal Architectural

Canal were approached to manufacture and install an exclusive feature staircase for a private residence in Fulham. The staircase structure was installed from the basement to the ground floor and then leading upto the first floor and master bedroom. The staircase was manufactured in mild steel, featured oak box treads with a laminated glass balustrade and stainless steel handrail. The team added a high build deep black finish to each of the treads to blend with the contemporary and elegant staircase design.
Sponsored
Crawley Down lifted to new FA standards

Crawley Down lifted to new FA standards

Zaun Limited

League regulations demand the installation of a rigid mesh fence with a spectator handrail around the perimeter of the pitch to a height of 1.1 metres. Zaun completed the complex supply and installation as changing ground levels required adaptation to ensure maintaining the 1.1m height around the whole pitch. Zaun contracts manager Steve Hancock visited the Haven Sportsfield Ground to take all of the site details for manufacture and supervised the installation, which was completed a week ahead of schedule.
Sponsored
Matfen Hall Hotel

Matfen Hall Hotel

Saint-Gobain Weber

Nestled in the Northumberland countryside is Matfen Hall – a mansion built in the early 1800s. To ensure the Grade-II listed property retained its Gothic architecture, a "thoughtful and stylish" transformation was required. The age of the building meant lots of preparation was required to guarantee a smooth finish. Tiling specialist WRS overcame complexities including cutting around hexagonal stone columns, chamfered steps, work with handrail base plates, and adding nosing details to the spiral staircase.
Sponsored
Orbis Balustrades for Sapphire Ice & Leisure

Orbis Balustrades for Sapphire Ice & Leisure

Delta Balustrades Ltd

Orbis OS211 Glass Infill Top FixOrbis OS231 Perforated Infill Top FixOrbis OS200/OS201 Vertical Bar InfillBorn from Havering Council’s vision to improve the sports and fitness facilities available in the borough, the £28 million investment is set to be a catalyst for regeneration in Romford.Named in honour of the Sapphire anniversary of Queen Elizabeth ll’s reign, the centre comprises of an eight-lane competition pool, gymnasium and first floor 56m by 26m ice rink.Appointed by contractors Willmott Dixon, Delta Balustrades were responsible for the supply of 579m’s of balustrading and 246m’s of handrails throughout the entire complex.With two extreme environments coexisting the specifications for the balustrade finishes were of upmost importance.Balustrades and handrails in the warm, chlorine filled air of the swimming pool environment received our Ultra (Marine) finish, providing a bright polished surface to prevent corrosion.First floor ice rink balustrades received our HiBuild powder coating finish, which boasts a ‘warm to touch’ feature that doesn’t allow the transfer a cold environment to bare hands.A visually striking, stainless steel staircase with perforated panels connects the floors within the ceiling void atrium spanning four floors.
Sponsored
Wall Protection - UCLH, National Hospital for Neurology and Neurosurgery

Wall Protection - UCLH, National Hospital for Neurology and Neurosurgery

Gradus

A complete wall protection system from Gradus has been installed at the newly refurbished Lysholm Department of Neuroradiology at the National Hospital for Neurology and Neurosurgery (NHNN). Supplied and fitted by the Gradus Contracts Team, the system includes wall guards, corner guards, kickplates and bollards from the stainless steel range, plus handrails from the 450 timber range, which is designed to meet guidelines in Approved Document M, BS8300:2009+A1:2010 and HBN00-04.
Sponsored
Amazon Logistics Centre, Leeds

Amazon Logistics Centre, Leeds

Brandsafe

Brandsafe supplied and installed a wide range of impact protection products at this site. Armco safety barriers, bollards, flexible delineators, speed bumps, wheel stops, lamp post protectors, pedestrian guardrail and handrail were all specified. Secure cages with digital locks were also supplied by Brandsafe to protect key equipment within the building. Click the link to read more about how Brandsafe provided full external and internal protection for this industrial workplace.
Sponsored
North Pole Depot

North Pole Depot

Lionweld Kennedy Group

Lionweld Kennedy provided 'North Pole Depot' with the supply and installation of 2nr maintenance access gantries with integral lifting beams, end stairs, demarcation fences and removeable polyester powder coated lift out handrails.Owned by Hitachi Rail, the North Pole Depot gives direct access to both West London and North London Lines.Utalising our range of safegrids and saferails, we created a accessible and safe platform, which complies with British and European standards.
Sponsored
East West Rail Phase 1

East West Rail Phase 1

Lionweld Kennedy Group

Lionweld Kennedy supplied the walk ways for the 'East West Rail Phase 1' for Network Rail.This new rail has connected Oxford to Bicester, with the second phase expected to connect Oxford even further.We supplied GRP walkways and approximately 1km of GRP parapet handrails to bridges in multiple locations along the new East West rail road.GRP and Flowdeck is an efficient material for this due to its lightweight and high-strength which makes it a great solution for walkways and platforms.
Sponsored
Easy Glass 3kN glass balustrade - Dutch university campus

Easy Glass 3kN glass balustrade - Dutch university campus

Q-railing

Extensive use of glass, and the careful articulation of forms, ensure a wonderful feeling of openness, whatever side you view it from. Q-railing’s Easy Glass 3kN glass balustrade system more than fulfilled the demanding safety requirements while still providing maximum transparency. In total, around 600 metres of glass balustrade were installed alongside stairs and landings. Attractive finishing touches were provided by wooden handrails and base shoes powder-coated in black.
Sponsored
Clipper Group Warehouse, Northampton

Clipper Group Warehouse, Northampton

Brandsafe

The Clipper Group warehouse in Northampton provides a distribution and logistics hub for multiple retail and high value brands. As such, Brandsafe were brought in to ensure that the warehouse is able to operate in a safe and efficient manner. Keeping the flow of pedestrian and vehicular traffic moving smoothly and safely is the priority here, which was achieved by implementing secure caged walkways and Armco barriers with built-in pedestrian handrail, safety ends and gates. As a result, the employees and high value goods at Clipper are protected from potential vehicle impacts.
Sponsored
Oxburgh Hall, National Trust

Oxburgh Hall, National Trust

Rapid Ramp Limited

BACKGROUND: Oxburgh Hall is a moated mansion set within 70 acres of formal gardens and woodlands.A £6 million improvement project was underway at the site, with works including repairing the roof, windows, chimneys, and medieval gatehouse.REQUIREMENT: As part of enhancements, a fully compliant ramp was needed from the south entrance and chapel to improve wheelchair accessibility. SITE SURVEY:Oxburgh Hall was the first project to benefit from the Lidar scanning technology used by our site surveyors.The machine scans the whole area, including the building and terrain.Once the photographing process was completed, our CAD designer was able to plot a 3D visual of the ramp on top of the lidar model.The final CAD designs were given to the client with their quotation.The lidar modelling process helps contextualise the drawings by placing the systems in a virtual representation of the real environment; in this example, a historic setting with grass & dry terrain.We aim to carry out site surveys efficiently and within a minimal time frame. This technology enables us to continue to achieve these objectives and more.END RESULT:The two systems were installed within a week and included a compliant 1:15 gradient and width of 1500mm.FEATURES INCLUDED: Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp and level changes.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Continuous Handrail - this handrail system ensures users always have support to hold onto.Standard colour: Black - Ramps are powder coated black to create a durable finish that is tougher than conventional paint.EXTRA FEATURE INCLUDED:Compliant Step Unit - an ideal addition to any ramp installation, providing the access needed for able-bodied users. They can also be stand-alone units, independent of the Rapid Ramp System.
Sponsored
Newton Aycliffe Rail Facility

Newton Aycliffe Rail Facility

Lionweld Kennedy Group

Lionweld Kennedy supplied open mesh flooring, handrails, stairs and removeable chains to the Hitachi Rail Facility in Aycliffe Industrial Estate. We supplied three 250 metre long inspection walkways and eighteen 27 metre long access platforms around their 460,000 sq ft factory.Hitatchi have been involved in the HS2 development, designing, building and delivering a fleet of bespoke high speed trains. Their new installation helps the team to be proactive with their work, ensuring their health and safety at all times with ball-proof grating.
Sponsored
Neaco’s balconies and balustrade offer visual appeal

Neaco’s balconies and balustrade offer visual appeal

NEACO Ltd

Neaco have supplied a wide-ranging balcony balustrade and internal balustrade specification at a development of luxury waterside apartments in Guisborough, North Yorkshire. The company’s glass panelled Juliet balconies and bespoke walk-on balcony designs are featured alongside balustrade installed to an interior mezzanine and a communal roof terrace. Handrails and balustrade have been precision-manufactured in aluminium featuring a powder coated finish in one of Neaco’s standard metallic colours. The rails and stanchions combine superbly with tinted toughened glass infills for a stylish modern aesthetic.
Sponsored
Easy Glass MOD 0760 stand-off railing system + Easy Glass Slim frameless glass balustrade - Shopping centre

Easy Glass MOD 0760 stand-off railing system + Easy Glass Slim frameless glass balustrade - Shopping centre

Q-railing

Parc Central shopping centre in Tarragona, Spain, has been one of the leading shopping centres in the Tarragona province. In 2013 the second floor was fully refurbished. For the interior, the architects chose Easy Glass MOD 0760 balustrade and a combination of stainless steel and wooden handrails. On the roof terrace 100 metres Easy Glass Slim were installed, with a stainless steel cap rail to create a stylish finish. The full glass balustrade ensures the safety of people sitting outside while they enjoy a clear view of the surroundings.
Sponsored
Easy Glass Pro glass railing - Museum Vlaardingen (NL)

Easy Glass Pro glass railing - Museum Vlaardingen (NL)

Q-railing

In Vlaardingen Museum, the Netherlands, old meets new. The use of concrete, aluminium and glass creates a powerful sense of open space and transparency. The many level changes and loft-like spaces meant it was important to find a balustrade solution unobstructed by a conventional handrail or metal grip. The Easy Glass Pro structural glass balustrade offered the ability to make fine adjustments to the positioning of each glass panel from the installation side – invaluable when being installed on the various sections of finished concrete flooring levels.
Sponsored
M&S Distribution Centre, Bradford

M&S Distribution Centre, Bradford

Brandsafe

Marks & Spencer has a vast distribution centre located in Bradford. Despite its massive size, they still required a new three-storey mezzanine in order to increase their overall storage capacity. With pallet trucks being operated on these floors, Brandsafe were brought in to provide the required custom solution. A combination of 2.4m high security fencing with built-in pedestrian handrail and low-level Armco protection was produced and installed on-site by Brandsafe. Polymer column protectors were also supplied to protect the mezzanine supports at ground level.

Showing 37-72 of 151

Feedback