NBS Source
I'm a manufacturer

"fire escape equipment"

4,365 results found

Sort by:

Showing 109-144 of 466

Sponsored
Supply chain scrutiny key to minimising fire door risks

Supply chain scrutiny key to minimising fire door risks

Promat UK

The Hackitt Review has brought to the broader public attention the myriad of standards and testing or assessment methods that specifiers and the fire protection sector has had to carefully navigate for many years. And whilst the debate continues about the best way forward in respect of specific applications, one positive step that fire door manufacturers can take right now is to go back to basics and check whether their supply chain for fire resisting components is opening the door to risk.Fire resistant products like fire rated glass, intumescents and core materials are composed to precise specifications.
Sponsored
Folding shutters at Deptford Fire Station

Folding shutters at Deptford Fire Station

Bolton Gate Company

Deptford Fire Station is a Grade II listed building in Lewisham having been originally constructed in 1903. Bolton Gate supplied the folding appliance bay doors in the 1960’s and although still functional after fifty years, they were in need of replacement due to frequent usage. Since the building is listed, every effort was required to replace the doors on a like for like basis and Bolton Gate were engaged to supply new folding shutters to the same design which were installed and handed over recently. This is the latest in a list of several fire station contracts undertaken in London.
Sponsored
Smart Fire Prevention System Installed in Luxury Apartments

Smart Fire Prevention System Installed in Luxury Apartments

Firechief Global

One Crown Place is the latest high rise addition to London’s skyline. Home to 246 luxury apartments, high-quality office space, a boutique hotel and members’ club, it is located between the City of London and Shoreditch. Designed by internationally renowned architects Kohn Pederson Fox (KPF), the development features two prismatic towers of 28 and 33 storeys.For the apartments, interior designers, Bowler James Brindley specified custom designed kitchens by Italian company Arclinea featuring a dark lacquered finish with engineered stone worktops and glass fronted cabinets.The Fire regulations which apply to high-rise living accommodation meant that the open plan kitchens in each apartment would require a fire suppression unit complete with sprinklers to be fitted. These units need to be installed and maintained by a specialist engineer and can also cause damage within a property should they be activated due to a fire.  Therefore, the team of architects, designers and builders were open to the idea of an alternative, unobtrusive design-led fire prevention solution, such as the Firechief Kitchen Stove Guard.
Sponsored
Erith and East Ham Fire Station

Erith and East Ham Fire Station

Langley Waterproofing Systems Ltd

The purpose: Energy savings of £¼million over 20 years at just two of its sites are predicted to be achieved by London Fire Brigade through effective roof refurbishment using our Roofing Solutions. The brigade identified that the roofs at Erith and East Ham Fire Stations were in need of refurbishment. Numerous intermediate repairs had already been undertaken. An efficient solution was needed to help London Fire Brigade optimise best value in its asset management and reduce its requirement for planned- or unplanned- maintenance.London Fire Brigade therefore turned to Currie & Brown construction management consultants to oversee the design and execution of the refurbishment projects under a contract management framework agreement in place between the two organisations. We was called in to assess the roofs and advise on a course of action. Data driven roof condition reports from surveys were taken across the two premises. We highlighted that the roofs were beyond economical repair and needed new waterproofing and insulation- a U value of 5.00W/m2K was discovered in one roof area, against the Regulatory threshold of 0.35W/m2K and best practice 0.18W/m2K. Our solution: We advised that in the main, overlaying of the existing roof covering with CP-20 Paracoat Cold Polyurea Liquid System (warm roof) application was the most-efficient and cost-effective solution.The over-laying using the CP-20 system satisfies London Fire Brigade’s policy of preference for flame-free, with no roof replacement needed this minimised waste to landfill.Our Approved Contractor CWG Group won the contracts to undertake the upgrading, working to Langley’s detailed individual specifications for each site.At East Ham Fire Station, four main roof areas plus a separate ancillary building were addressed.LangGuard free-standing safety rail was installed around the perimeter of roofs 1 and 4.The final touch for the field roof area was provided with Paracoat Fast SF slip-inhibiting finish to agreed walkway areas.At Erith Fire Station, the refurbishment involved upgrading two roof areas including a rooftop tank room and adjoining canopy of corrugated PVC over the Station building, and a separate stores roof.
Sponsored
Dublin Doors - Challenging Fire Test - Rutland ITS.11204

Dublin Doors - Challenging Fire Test - Rutland ITS.11204

Rutland

About the project:Dublin Doors are a distributor of door leafs to door manufacturers throughout Ireland. Since Brexit, the market in Ireland requires the EN 1634-1 fire testing standard, as opposed to the previously accepted the British Standard BS 476. A customer of Dublin Doors wanted an overhead concealed door closer combined with 44mm thick doors, and it had to pass the EN fire testing standard.The specification of the doors was: (A) 44mm PB hardwood lipped all round door (B) 38mm PB core faced with 3mm mdf, routed with 2mm decorative groove in the faceDublin Doors were very aware that EN testing is widely considered to be more onerous than BS testing. The inclusion of a drop seal was also a point of concern - many companies have found that using drop seals to control smoke can appear to make the fire test harder to pass, with some experiencing prolonged flaming at the threshold. Rutland was able to help by providing its concealed closer ITS.11204, which can be used in 44mm fire doors – one of only a handful of concealed closers on the market that can do this. Rutland was also able to tap into its network of experts and consultants to discuss possible options, to help Dublin Doors to arrive at a combination that met the specification, and was most likely to succeed in the test. Dublin Doors were also required to write a Pre-Test Verification (PTV) before the test – a requirement at many test labs now. Rutland used its expertise in compliance to help complete this specification.The outcome:The results were excellent, with both doors lasting 49 and 51 minutes respectively in the fire test, for what was a 30-minute FD30 doorset, the more onerous European standard EN 1634-1 to achieve – E30. In our experience of fire testing, this is an excellent result for a 44mm solid timber door, and the Rutland team were just as pleased as Dublin Doors that the door, along with its concealed closer, passed with flying colours.
Sponsored
Smart fire prevention system installed in London Westminster apartments

Smart fire prevention system installed in London Westminster apartments

Firechief Global

Carrick Yard in Westminster is a residential development comprising 168 one-, two-, three- and four-bedroom apartments, a community space and public sports hall as well as extensive landscaped public areas. The scheme delivers improvements to existing surrounding housing and public spaces and is part funded by Westminster City Council. It is the first development to be completed in the Church Street Regeneration area.The Fire regulations which apply to high-rise living accommodation meant that the kitchens in each apartment would require a fire suppression unit complete with sprinklers to be fitted. These units need to be installed and maintained by a specialist engineer and can also cause damage within a property should they be activated due to a fire.  Therefore, the Firechief Kitchen Stove Guard was chosen as an alternative, unobtrusive design-led fire prevention solution.
Sponsored
Profile 22’s Optima windows and doors selected for care home and assisted living apartments

Profile 22’s Optima windows and doors selected for care home and assisted living apartments

Epwin Window Systems

Over 300 Optima casement windows and 60 doors from Profile 22 were used in a new 85-bed care home and 45 assisted living apartments in Sutton Coldfield. Background The Sutton Rose development in Boldmere, Sutton Coldfield is a new build 85-bed care home with 45 assisted living apartments. The developer is renowned for delivering exceptional quality projects, which means suppliers have to meet exacting standards and quality specifications. The window and door contract were awarded to Sutton Designs in Kingstanding, Birmingham, with manufacturing undertaken by Profile 22’s Approved Commercial Manufacturer, Central Window Systems in West Bromwich. The two companies had worked on previous care projects, which meant that as well as being able to demonstrate their ability to meet the tender requirements for this project they also brought a proven track record. The window specification The window and door system specified for the project was award-winning Optima from Profile 22, a fully-integrated 70mm system which offers a step-change in advanced window design. The high-specification system comes with an impressive set of credentials and design flexibility to meet all commercial project requirements. In this project, all windows were fitted with open-out restrictors for the safety or the residents and all window and doors needed to comply with fire and smoke escape protection measures. Optima offers market-leading structural strength and high-security features and casement windows are PAS24:2016 approved as standard which was important to meet the project specification. The windows and doors were manufactured in Anthracite Grey on White to match other developments in building contractor’s portfolio and create a sleek, modern aluminium aesthetic. A carefully managed installation process Sutton Designs is an experienced new build and commercial window installation company and has worked with Central Window Systems for over three years. The two companies worked in close partnership to ensure all windows and doors were manufactured and installed to the required timescales. The project was completed during the Covid-19 pandemic, which meant appropriate health and safety considerations also needed to be taken into account. An impressive new elder care development The completed project will provide modern and well-equipped homes for the residents. Jon Gregory, Owner of Sutton Design concluded: “The quality of Optima from Profile 22 and the commercial expertise of Central Window Systems were fundamental to the project’s success. This is a very impressive development and we were delighted to have been part of its construction.” For more information on the Profile 22 range, please visit www.profile22.co.uk or call 0808 101 4143.
Sponsored
Watergate Bay Hotel, Cornwall

Watergate Bay Hotel, Cornwall

DRU Fires

DRU Polo gas stoves bring warmth and comfort to Cornish hotel suitesDRU Fires, in partnership with leading Cornwall fireplace dealer Kernow Fires, has supplied five DRU Polo balanced flue gas stoves for the new beach lofts at one of Cornwall’s leading hotels.Watergate Bay Hotel on the north coast of Cornwall, originally designed to a be a railway terminus hotel, has been developed into an inclusive year-round destination. Its spectacular clifftop setting and location just a short hop from Cornwall Airport Newquay makes it a primary choice for travellers from all corners of the UK and beyond.The recent closure of Jamie Oliver’s Fifteen restaurant on the site paved the way for the £1.4 million development of the seven new beach lofts by contractors GSI and interior designers Dynargh Design, right above the beach. Described as ‘surf-in surf-out’ accommodation, the lofts have floor-to-ceiling windows with panoramic sea views. All have been designed to feel like modern city lofts, with warm textures and sustainable materials.High energy efficiencyThe DRU Polo gas stoves were chosen by Dynargh Design for their contemporary design, fitting in with the overall design and aesthetic of the beach lofts. In addition, they were selected for their A energy rating, 92% efficiency and the convenience of gas with easy remote-control operation. They have all-year-round use and are suitable for chilly autumn days and cool summer evenings. Their balanced flue system offers flexibility of installation, as they require no chimney and only need proximity to an outside facing wall. This enables them to be installed in the living space, bedroom or bathroom subject to the design of each individual suite.The beach lofts were completed in time for Cornwall’s peak 2021 tourist season, which has been hugely successful due to many more people taking their holidays in the UK during the Covid 19 pandemic. Impressive outlooks and sustainabilityKernow Fires owner Simon Breckon commented: “We’re pleased to have contributed to the success of the beach lofts and have seen strong growth in Cornwall’s domestic and commercial fireplace markets this year.”Watergate Bay Hotel CEO Will Ashworth said: “The beach lofts are our best rooms. They are sized very generously and the interior design represents our new approach to contemporary Cornish beach living.” Dynargh Design director Matt Hulme said: “The lofts have some of the most impressive outlooks of any hotel in Cornwall. But the interiors also needed to have enough appeal in the winter, when it’s dark at 5pm, that it feels warm, natural and enticing.”Sustainability was also an important factor in the design. “Getting active in the beautiful natural environment is at the heart of the Watergate Bay experience, and we’re committed to minimising the environmental impact of our design choices,” adds Will Ashworth.For further information visit: drufire.com, kernowfires.co.uk and watergatebay.co.uk
Sponsored
Paddington Exchange - Fire Rated Mailboxes

Paddington Exchange - Fire Rated Mailboxes

The Safety Letterbox Company

THE PROJECTPaddington Exchange is a collection of 123 high specifications one, two and three bedroom apartments arranged over fourteen spacious floors developed by Taylor Wimpey Central London.The development is located in a sought after canal-side location, situated on the site of the former North Western Community School, offering easy access to a number of high-end street cafes, restaurants and shops. A wealth of transport links around the city are found at the site of the Paddington Exchange project.THE PRODUCTThe project features multiple banks of wall recessed fire rated 2 mailboxes located in the entrance lobby area. The mailboxes contain a series of features and benefits that result in a ‘one hour integrity’ rating that conforms to the BS476 Part 22 fire standards. For more information, please visit our fire rated mailbox page.The mailboxes are finished in an IGP-DURA®xal paint using a Dark Bronze – E82987 colour. Each mailbox features engraved numbering in a COPASETIC NF font on the opening flap coloured with a contrasting black infill.The banks of mailboxes are completed with a surrounding trim used to mask the join between the mailboxes and the installation wall. Large panels are used in conjunction with the banks of mailboxes which allow for easy identification of the relevant mailbox for both the residents and postal delivery workers.
Sponsored
Required Testing and Certification Regime For CE marked fire shutters

Required Testing and Certification Regime For CE marked fire shutters

A1 Shutters Ltd

CE marking for fire shutters to BS EN 16034, BS EN 13241 following a fire test to BS EN 1634-1 is a legal requirement in the UK. https://a1sgroup.com/blog/a1s-group-policy-when-quoting-ce-marked-fire-shutters 
Sponsored
Roath Fire Station, Cardiff

Roath Fire Station, Cardiff

Anderson, GEC Ltd

Stainless steel worktops, by GEC Anderson, were deployed in the refurbishment of the mess room at Roath Fire Station in Cardiff. The kitchen units were supplied by Steelplan Kitchens.The continuous, high quality, stainless steel worktops provide a highly professional look and feel to the busy area within this important emergency facility. The requirements of hygiene, durability and safety are met by the worksuraces that feature integrated sink bowls as well as upstands to walls.
Sponsored
Profab Access Ahead of the Curve with Fire Testing

Profab Access Ahead of the Curve with Fire Testing

Profab Access Ltd

Profab Access Ltd, part of the Access 360 portfolio, is prioritising fire safety in buildings with the introduction of fire testing for both sides of its 4000 Series riser door range. Established in 2001, Profab Access Ltd is a leading UK manufacturer of wall and ceiling access panels and riser doors. The company employs a team of 71 and operates from a 46,000 sq. ft. manufacturing and distribution facility in Atherstone, Warwickshire. All aspects of the design and manufacturing process are carried out onsite.
Sponsored
Lewisham Hospital - Fire Doors

Lewisham Hospital - Fire Doors

Advanced Timber Systems

A comprehensive fire door replacement programme throughout the 5-storey Ladywell Unit which provides mental health services including a psychiatric intensive care unit.Advanced Timber Systems supplied fully PVC encapsulated ‘Vanta-form’ Door-sets and specialist anti-ligature hardware to give a robust, compliant and durable solution in this complex environment.Glazed Side screens were supplied with toughened security glass to enhance the safety for patients and staff without compromising visibility through corridors.
Sponsored
London Fire Stations choose Jacksons in state-of-the-art refurbishment

London Fire Stations choose Jacksons in state-of-the-art refurbishment

Jacksons Fencing

In 2013 the London Fire Brigade received £51.5 million from central government to rebuild nine fire stations. A consortium led by construction group Kier, along with BDP architects, was given the contract following a detailed procurement process. Jacksons were specified to supply access gates for eight of the stations undergoing refurbishment.
Sponsored
New Headquarters for Dorset Fire Service

New Headquarters for Dorset Fire Service

HAG Ltd. - The Door Specialists

HAG was honoured to be chosen to install industrial doors on the new headquarters for the Dorset Fire Service, designed by Prince Charles. The £3 million building included grand neo-classical design and a mock balcony, which meant HAG had to be particularly careful in the design and planning of the installation. The specification was to match the styling of the three-storey fire station while still providing the high levels of security and ease of use required for the situation. Our industrial Q Doors perfectly balanced the stunning aesthetics with the structural integrity and functionality required for this prestigious contract.
Sponsored
Neaco balustrade called into service at new fire station

Neaco balustrade called into service at new fire station

NEACO Ltd

Improving accessibility has always been a recurring theme in the specification of Neaco’s products and so it proved again when the company’s balustrade systems were called into service for entrance ramps at Humberside Fire and Rescue Service’s new cutting-edge Hull Central Fire Station. Jefferson Sheard Architects sought to design an accessible and welcoming facility to serve the local community. Neaco’s contribution was integral to this objective with aluminium handrails and balustrade to steps and two extensive ramps at the main entrance. The system was also specified with glass infill panels for a first-floor terrace.
Sponsored
Fire-rated MySmartBox and mailboxes unit - Bronze finish

Fire-rated MySmartBox and mailboxes unit - Bronze finish

DAD - DECAYEUX

Fire-rated smart parcel lockers (MySmartBox) and mailboxes (FR120MBH) in Bronze finish installed in a high end lobby in Oxford Street (London).
Sponsored
Fire Rated Floor Access Covers - Hong Kong International Airport.

Fire Rated Floor Access Covers - Hong Kong International Airport.

Surespan

Project:Surespan were approached to develop and supply a series of 4 hour fire rated flush floor access covers for the Midfield Concourse expansion project at Hong Kong International Airport. The HK$10 Billion dollar project was completed in 2015 following extensive design and planning processes utilising BIM modelling. Product:Our SAC covers were specified for their fire rating and ease of customisation. The covers were specially adapted with a 200mm upstand and enhanced fire-rated materials to achieve the 4-hour rating. Sizes Supplied 1050 (41”) x 1050 (41”) 1050 (41”) x 850 (33”) 750 (29”) x 600 (23”)
Sponsored
Case study - Walraven Pacifyre Fire Sleeve on The Shard

Case study - Walraven Pacifyre Fire Sleeve on The Shard

Walraven Ltd

Walraven's Pacifyre MKII fire sleeve was specified throughout the risers in The Shard due to its ability to allow pipe movement and still remain effective.
Sponsored
Flameshield Fire Curtain with EW120 enhanced radiation control

Flameshield Fire Curtain with EW120 enhanced radiation control

A1 Shutters Ltd

The ideal fire curtain when radiation tenability is of concern.
Sponsored
Smart fire prevention system installed in Rochdale town centre apartments

Smart fire prevention system installed in Rochdale town centre apartments

Firechief Global

The Riverside development in Rochdale includes two nine storey apartment blocks comprising a mix of 240 one- and two-bedroom properties for private rent. The Rochdale town centre Riverside regeneration project also includes a 147-bedroom hotel and 43,000 square feet of office space. The Fire regulations which apply to high-rise living accommodation meant that the kitchens in the apartments would require a fire suppression unit complete with sprinklers to be fitted. These units need to be installed and maintained by a specialist engineer and can also cause damage within a property should they be activated due to a fire.  Therefore, the Firechief Kitchen Stove Guard was chosen as an alternative, unobtrusive design-led fire prevention solution. 
Sponsored
Internal Apartment Entrance Doors with Dual Security & Fire Specification

Internal Apartment Entrance Doors with Dual Security & Fire Specification

Ahmarra Door Solutions Ltd

Ahmarra's Residential Door Range includes secure internal apartment entrance doorsets that offer dual security and fire certification – providing peace of mind that the people, property and assets within the building are protected from opportunist thieves, vandalism and attack, as well as fire. This high security fire door was designed and manufactured for a sheltered housing complex.Certified under the Q-Mark Enhanced Security scheme, the doorset is Secured By Design (SBD) approved and meets PAS 24: 2016 standards. Also certified under the Q-Mark Fire Door Manufacture scheme, it is FD30 fire rated to BS 476 Pt. 22.
Sponsored
Fire Curtains to EW120 for 125 Deansgate Manchester UK

Fire Curtains to EW120 for 125 Deansgate Manchester UK

A1 Shutters Ltd

Whilst certainly not the most iconic or largest project the A1S Group has ever been involved with, 125 Deansgate in Manchester in many ways represents for us "a bread and butter project", the like of which we are involved with throughout the UK on an almost monthly basis. Despite the doom and gloom of office rationalisation during the pandemic, high end office new build and cat A and B refurbishment continues to be one of our strongest sectors. We have completed literally hundreds of office projects over the last decade including We Work premises throughout London and the UK, Goldmann Sachs, Barclays at Canary Wharf and Norfolk House in St James Square, London. Fire and smoke curtains continue to be integral to modern office design, allowing for more open spaces within the building's wider fire strategy framework. The A1S Group manufactured, installed 54 Flameshield fire curtains, all with smoke seals and multi function panels. For us, the 125 Deansgate building was noteworthy as it was the first time that we installed our high performance Flameshield EW120 fire curtain to provide a minimum of EW90 compartmentation. We also manufactured and installed our a Flameshield fire and smoke curtain system to provide 120 minutes integrity and 15 kw/m2 to protect the lift and lift shaft. This striking building is clad in a rich red terracotta with 12 storeys of flexible office and retail space all achieving BREEAM 'excellent' and is now considered one of Manchester's premier offices. The A1S Group have a long term planned preventative maintenance in schedule in place to comply with the 2005 Regulatory Reform Order.
Sponsored
The Restoration of Westminster Fire Station

The Restoration of Westminster Fire Station

Lime Green Products Ltd

The Westminster Fire Station restoration and regeneration was all about creating an experience for those that live there, with sustainable and natural materials,” says Jennifer Benningfield, experienced architect and founding principal of Openstudio Architects.v “We needed to find a reliable supplier of sustainable and natural materials, which were suitable to tie in with the heritage structure. “The challenge was sourcing the right materials that were compatible with the fabric of the existing buildings. Working with Lime Green, we managed to develop a solution that matched the original building’s beautiful aesthetic and historic character. “As a key supplier of lime-based products, their flexibility and reliability helped to make our job easier – and we received a lot of praise for the high-quality and beautiful new courtyard building. The lime mortar is an integral part of the brickwork and proves that it is appropriate for contemporary, as well as historical, structures,” praises Jennifer. About the project Using a team of specialists, Openstudio Architects supported the site team in using old and traditional construction techniques to refurbish and develop buildings in a contemporary way, with beautiful results. “There were two phases to the Westminster Fire Station project,” explains Jennifer. “The first involved refurbishing the existing building, the Grade II Listed Edwardian Fire Station built in 1906 and decommissioned in 2014, to create a restaurant and bespoke housing. “The second involved developing the site further by adding a new residential building to the rear of the site surrounding a garden courtyard, which is where we used Lime Green’s mortar.” Supporting the local community “The project was situated on a very constrained and challenging site,” continues Jennifer. “With its central location, the construction works undoubtedly had an impact on those living and working in the local area, which is why we wanted to ensure the community were completely happy with the project. “As we wanted to make sure the new build tied in with the older fire station, there were inevitably challenges that we didn’t anticipate along the way. However, most importantly, we needed to ensure we sourced the right materials, which were compatible with the existing building, both in terms of performance and appearance. Selecting the right materials “We wanted to work with natural materials, which would age well and ensure robust construction that has longevity and sustainability,” says Jennifer. “We chose specific products, including handmade Danish bricks and handmade glazed bricks to give depth and texture to the new building. We wanted to ensure use mortar that had a texture and a grain to it, so it would work with the nuances of the bricks, as well as being a colour match. “Finding the right colour mortar to match the pale Danish bricks was key. These bricks were handmade, so we needed the mortar that integrated with the historic Edwardian building to create a seamless whole. “When planning the project, we recognised the importance of lime products, because of the material’s sturdiness and robustness. This means it doesn’t wear with structural movements and changes in the seasons. “That’s why Lime Green was the perfect fit for the project. With an extensive colour range, the team was able to colour-match the mortar with the materials of the new building perfectly. The consistency between the samples Lime Green gave us and the final product delivered was incredible, which was important given the scrutiny by Westminster City Council over the project and the appearance of the new building. “The flexibility of the products also helped us to minimise the amount of movement joints, as it accommodated movement in a much more forgiving way than other products, such as modern cement mortars. “We really enjoyed working with the Lime Green team – they were easy to work with, responsive and very supportive of the project. As we couldn’t store a huge amount of supplies on site, Lime Green was very accommodating in delivering exactly what we needed, at the right time. “The best part was that we were able to develop a solution with Lime Green that supported the original building’s beautiful aesthetic and historic character, with a new building that pays similar attention to detail.” A sustainable, natural and beautiful finish “People love the building, and neighbours even call it ‘the golden citadel’. It’s widely recognised in the local community for its high-quality, beautiful finish,” continues Jennifer. “One of the Fire Station’s previous residents – who had moved out during construction – has moved back after the restoration works and loves the development. That was the icing on the cake for us, it really felt as though our vision had materialised – enhancing people’s experience of new buildings made with sustainable and natural materials that stand the test of time. “The Westminster Fire Station development truly looks beautiful, and the quality of the natural and sustainable products used has a huge role to play in that. Lime Green’s product quality and customer service is outstanding. We’re already working with Lime Green on another project, and we can’t wait to see the finished result,” concludes Jennifer. “It was a pleasure to see our Hydraulic Lime Mortar used on this new development project. We’ve loved working with Openstudio Architects on Westminster Fire Station, and we’re glad to be working with them on their next project,” comments Simon Ayres, co-founder and managing director, Lime Green Products. For more information about the Westminster Fire Station project and the products used, visit Lime Green or call 01952 728 611.
Sponsored
Wakefield’s New £3.76m State of the art Fire Station

Wakefield’s New £3.76m State of the art Fire Station

Naylor Concrete Products Ltd

The fire station is relocating from Dale Street, Ossett, to nearer Wakefield city centre as part of West Yorkshire Fire and Rescue Authority's Integrated Risk Management Plan and replaces the current near Ossett town centre. The new location will enable crews to support the Combined Aerial Rescue Pump based in Wakefield. Coun Tracey Austin, West Yorkshire Fire and Rescue Service vice chairwoman, carried out the ground breaking ceremony. She said: "This marks the start of a very exciting project in Wakefield district and I am looking forward to seeing the new station taking shape.”
Sponsored
Mono Glass Balustrades for Southport Community Fire Station

Mono Glass Balustrades for Southport Community Fire Station

Delta Balustrades Ltd

Mono M311 Glass Infill Top FixOrbis OS211 Glass Infill Top Fix As part of the North West Fire PFI scheme, the Southport Community Fire Station provided improved facilities for Merseyside Fire and Rescue Service and the North West Ambulance Service.The client’s main objectives were to create well designed facilities to a high architectural standard and provide a safe and healthy environment. Designed and built by Balfour Beatty Construction, this new 6 bay station included community-orientated facilities, training facilities, rest rooms, additional office space and two staircases.In line with the client’s vision, Delta Balustrades were appointed by Balfour Beatty to design, supply and install handrails and balustrades to both staircases and an external balcony area. Combining a minimalistic look and feel with a high quality stainless steel finish, the Mono system with clear glass infill panels was chosen for the main staircase. For the rear stair and external areas, the Orbis system with powder coated uprights was chosen.
Sponsored
Coedcae Industrial Estate, Technical Fire Damage Specification

Coedcae Industrial Estate, Technical Fire Damage Specification

Garland UK

A busy recycling centre in Coedcae Industrial Estate, Pontyclun South Wales, suffered from a crippling fire that destroyed one-third of the building leaving the rest in severe disrepair from fire damage.Garland Technical Manager, Dale Thomas, was instructed by long-term partner Cushman Wakefield to assess the extent of the damage and secure the optimum waterproofing system to get the warehouse unit returned to its former glory as a hive of activity for the local area.Dale conducted a thorough condition survey and supplied a detailed written report to the client, highlighting the severity of the building damage and the poor condition of the existing roof sections and walls. Approximately 2,000 sqm were either damaged beyond repair or had fallen into a state of disrepair, meaning that a full refurbishment of all roof and wall sections was required before the optimum waterproofing system could be implemented.
Sponsored
AUTOMATED VEHICLE GATES

AUTOMATED VEHICLE GATES

Premier Security & Fire Consultants Ltd

These automated vehicle gates were designed, fabricated, and installed by Premier Security & Fire Consultants Ltd on behalf of our instructing clients, Clarion Housing Group and OPENVIEW GROUP LIMITED.The project, in Croydon, South London, required Secured by Design and BRE LPS1175 SR2 security standard, all covered by Premier’s extensive catalogue of officially tested products.For more information call us on 0208 559-8295 or go to our website www.premier-ssl.com.
Sponsored
Orbis OS211 Glass Balustrades for Birkenhead Community Fire Station

Orbis OS211 Glass Balustrades for Birkenhead Community Fire Station

Delta Balustrades Ltd

Orbis OS211 Glass Infill Top FixThe Birkenhead Community Fire Station was completed in 2013, as part of the North West Fire PFI scheme, a framework of 16 fire stations across North West England. The client’s main objectives were to provide a safe and healthy environment with improved facilities for firefighters and other personnel.Following demolition of the existing fire station, the design and construction of this multi-appliance station, led by Balfour Beatty Construction, included community orientated facilities, training facilities, rest rooms, additional office space and two communal staircases. At early design stages, Delta Balustrades worked closely with Balfour Beatty to meet the client’s objectives of creating well designed facilities to a high architectural standard. The Orbis system was chosen as a cost-effective, high-quality tubular balustrade solution for both staircases.The main stair boasted a brushed stainless steel finish with unique Banjo glass fixings. Savings were made on the rear stairs by selecting powder coated uprights and D type glass fixings.
Sponsored
Lymm Fire Station Changing Place

Lymm Fire Station Changing Place

Innova Care Concepts

Lymm Fire Station was completely unique project; it was new-build station that doubled up as an educational centre. It had all kinds of different environments and scenarios built-in to give visitors the ability to learn what to do in various emergency situations. As such, they wanted to include a Changing Place facility in the new building. We’ve been working with the Changing Places campaign for a long time, and we were able to design a fully-compliant facility complete with a wall-mounted X-Y hoist system. Read all about it on our website.
Sponsored
SMART FIRE PREVENTION SYSTEM INSTALLED IN ASSISTED HOUSING DEVELOPMENT IN YORK

SMART FIRE PREVENTION SYSTEM INSTALLED IN ASSISTED HOUSING DEVELOPMENT IN YORK

Firechief Global

The Wilberforce Trust is a charity dedicated to helping and empowering those with sight and hearing loss and impairment in the York and North Yorkshire area to live fulfilling and independent lives. The Trust had tenants in community based supported housing and family homes around York but wanted to deliver an innovative ‘extra care’ housing scheme designed especially for people with a visual impairment and other disabilities; the first of its kind in the area.Wilberforce House offers 30 one-bed, open-plan purpose-built, self-contained apartments along with a Living & Learning Zone – providing education and leisure activities – a courtyard cafe and offices for the Trust itself, all set in four acres of accessible landscaped gardens, including a large sensory garden. The apartments utilise smart home and assistive technology personalised to their lifestyle needs.A consultant was employed to review the development’s plans with regard to fire safety. His report included recommendations for additional fire safety measures including the ability for cooker hobs to be switched off by an alarm, as kitchen fires are a significant risk with 50% of all accidental house fires starting in the kitchen. WHY THE FIRECHIEF KITCHEN STOVE GUARD? The initial solution proposed was costly as it meant hob alarms would need to be hard wired into each apartment’s fuse board. Damian Pocknell, Head of Housing, Facilities & IT at the Wilberforce Trust recalled having seen and read about the Firechief Kitchen Stove Guard and realised that this would be much more cost effective. The fire consultant agreed and subsequently signed off on the Kitchen Stove Guard as the approved solution.  
Sponsored
School achieves aesthetic fire performance with MEDITE PREMIER FR

School achieves aesthetic fire performance with MEDITE PREMIER FR

MEDITE SMARTPLY

A state-of-the-art sports and learning centre in Cambridge features a dramatic space-defining acoustic based on the use of MEDITE PREMIER FR fire rated panels from MEDITE SMARTPLY.
Sponsored
XVent Hinged Rooflights For Fire Safety At Glasgow Theatre Royal

XVent Hinged Rooflights For Fire Safety At Glasgow Theatre Royal

Glazing Vision Ltd

XVent Hinged Rooflights For Fire Safety At Glasgow Theatre Royal Case Study
Sponsored
Driving understanding of why fire resistant glazing is ‘Specified for a Reason®’

Driving understanding of why fire resistant glazing is ‘Specified for a Reason®’

Promat UK

Despite the potentially catastrophic consequences of changing a specification for fire resistant glazing, doors and windows, specifications are still being routinely altered just to save a few pounds or due to a lack of technical understanding, according to leading fire, thermal and acoustic insulation manufacturer Promat UK Promat UK is supporting the market with a campaign to raise awareness of the significant risks of changing even the tiniest detail in the specification of building elements that are designed to protect lives and properties.
Sponsored
Promat SYSTEMGLAS® Ferro provides assured fire protection for Dublin Landings

Promat SYSTEMGLAS® Ferro provides assured fire protection for Dublin Landings

Promat UK

Assured passive fire protection for a spectacular central atrium in Dublin city centre’s largest and most prestigious new commercial development has been provided by over 300m2 of Promat SYSTEMGLAS® Ferro. The system was selected thanks to its 360 degree ‘wheel of assurance’, which ensures all the fire resistant glazing screens are checked for compliance at every stage from design and specification, through manufacture and installation. The proven butt-jointed, steel framed fire resistant glazing system has been used to create all the glass screens which encapsulate the atrium at the heart of No. 1 Dublin Landings.
Sponsored
TITAN Lite™ Provides Fire Integrity and Insulation for Mansfield Hospital Refurb

TITAN Lite™ Provides Fire Integrity and Insulation for Mansfield Hospital Refurb

FIREFLY™ TBA

Upgrading the fire protection within potentially vulnerable roof spaces has been a highly important aspect of the wider refurbishment and improvement work being undertaken at a mental health hospital in Nottinghamshire, with TITAN Lite™ being specified to provide both integrity and insulation, in combination with other products from the range of TBA FIREFLY™.As a highly experienced specialist installer and long-term user of FIREFLY™ products, DC Fire Protection Ltd. has installed hundreds of metres of the TITAN Lite™ 120:60, as well as the Collaroll and a total of 13 fire-rated access doors: 10 measuring 1200 x 600mm, plus a further three of the smaller, 600mm square versions, offering a 120 minute fire integrity rating.Established in 2015, DC Fire Protection works right across the country covering multiple sectors of the construction industry, installing active as well as passive fire protection systems.A Director of DC Fire Protection, Daniel Mabbott, commented: “We have been dealing with FIREFLY™ for a number of years, including buying large quantities of the TITAN Lite™ and APOLLO Lite™, which we use for commercial contracts as well as other work. While we often propose the use of FIREFLY™ systems to clients, in this instance the TITAN Lite™ 120:60 had already been agreed by the client – in consultation with FIREFLY’s own consultant and specified by another fire safety specialist for who we are sub-contracted. We have a very good working relationship with FIREFLY™ whose technical team are always ready to come to site to offer advice on issues which arise or to provide a bespoke detail. We also rely on them to give our operatives the training required, up to the appropriate level. In this case the installation work is fairly straightforward, also using the Collaroll to protect penetrations to the main barrier.”Installation work was successfully completed to schedule in September and DC Fire Protection Ltd. is now preparing to begin an even larger installation contract at the Ashfield Hospital also in Mansfield.FIREFLY™ TITAN Lite™ 120:60 has been developed as a flexible fire barrier to provide compartmentation of larger concealed spaces within different types of buildings including factories, warehouses, healthcare facilities and even railway stations.By offering 120 minutes integrity and 60 minutes insulation, TITAN Lite™ 120:60 exceeds the minimum requirements relating to Fire Barriers as detailed in the UK Building Regulations: Approved Document B (Fire Safety). FIREFLY™ is manufactured using specially treated woven glass fibre fabrics.

Showing 109-144 of 466

Feedback