NBS Source
I'm a manufacturer

"fire door"

4,726 results found

Sort by:

Showing 217-252 of 503

Sponsored
Siberian Larch Cladding for Lymm Fire Station

Siberian Larch Cladding for Lymm Fire Station

International Timber

The building of a new fire station and safety centre in Lymm was part of a comprehensive plan to improve response times across Cheshire, Halton and Warrington.
Sponsored
Fire Safety Balcony Remediation in Poole, Dorset

Fire Safety Balcony Remediation in Poole, Dorset

AliDeck

The AliDeck System has rapidly become the de facto standard choice for balcony fire safety remediation projects. With our large range of non-combustible aluminium decking boards, joists, and pedestals our products offer practical and cost-effective solutions for any conceivable balcony refurbishment works.
Sponsored
Office Design & Build Featuring Forza Doors

Office Design & Build Featuring Forza Doors

Forza Doors Limited

Imago Interiors, an award-winning design and build company, was tasked with creating an environment that merges design, technology and wellness to provide X+Why, a co-working real estate provider, a perfect home from which to grow at Whitechapel Road, London. "Forza Doors were selected as we have established a trusted relationship with them on our previous projects, based on their customer service and exceptional quality." Paul McArdle, Construction Director & Co-Founder “X+Why want to change the way the world works by uniting purpose-driven businesses in tech forward, wellness focused, and thought provoking environments. It was essential for us to fulfil every aspect of the brief to deliver their vision. We couldn’t be more proud of the end result, and to work with a fantastic forward thinking client.”
Sponsored
Door Step and Below Door Ventilation

Door Step and Below Door Ventilation

Cast Iron Air Brick Company

Looking down for architectural features in any Georgian town and as well as coal hole covers, manholes and the like you'll see all manner of air bricks and grilles, mostly for sub floor ventilation in property walls. Here is an illustration of a cast iron vent underneath a front door in Regency Bath. Like many it's in a pretty poor state. This one's patched up with steel plate and it's suffocating, what is a key part of the ground floor causing damp. Prevent damp in period property basements and below suspended floors...
Sponsored
Lucent, Picadilly

Lucent, Picadilly

SELO

The Lucent Development creates balance that boosts productivity and wellbeing.Lucent W1 is quite literally built around nature, with a tree towering in the central atrium and an internal green wall that stretches the full height of the world-famous external lights. The innovative Fletcher Priest design has created offices that are cocooned away from the surrounding city, while 20 terraces allow panoramic views across the capital.For this design, Selo used the Quarda Riser Door which are the most high-performance metal riser doorsets. Perfect for concealing fire-rated riser doors, access panels, and internal doors in corridors, landings, and other access areas; Quadra+ is supplied as an integral, four-sided frame and door system, pre-constructed to form a single robust unit. Ideal for hidden commercial access solutions, Quadra+ is designed and manufactured to the highest standards.
Sponsored
The Office Group (TOG + Fora)

The Office Group (TOG + Fora)

Radii

This work at Holborn’s Chancery House  — The Office Group’s largest location to date spanning 127,000 sq ft — focused on a design that accommodates multiple working zones and breakout spaces, enhances wellbeing and offers an abundance of natural light.Radii’s design department provided multiple bespoke solutions for this fit out, working on four of the building’s nine floors.For glazed fronts, our elegant Parallel 50 (Rw 45 dB) double glazed partitions in emulated satin stainless steel finish — a reference to the historic London Silver Vaults that are located at the base of Chancery House — were utilised along with wraparound framing and a custom blade detail to create an eye-catching visual effect.On the Ground floor, single glazed Linear 59 partitions (Rw 39 dB) with a bespoke pocket sliding door into drywall was installed for platform lift access.Finally, E30 fire rated double doors were placed on the Lower Ground Floor to provide fire route protection.
Sponsored
False Fire Alarms Continue to Cost the UK

False Fire Alarms Continue to Cost the UK

Safety Technology International Ltd

False fire alarm numbers continue to rise post-pandemic causing major issues for the economy by wasting vital time and resources.The latest Home Office figures from year ending September 2022 reveal fire and rescue services attended 238,885 fire false alarms, the largest total of false fire alarms in over a decade, an increase of 10% compared with the previous year.With an 18% increase from the previous year for malicious false fire alarms, 6,473 false alarms were determined, the number still rising post-COVID.False fire alarms continue to be the largest proportion of incidents attended at 38% and so it is increasingly important to minimise false alarms to ensure both the safety of individuals and the efficient use of emergency services.A teenager was arrested in Aberdeen after setting off fire alarms more than a dozen times, which police investigated as ‘deliberate and malicious’. Firefighters attended calls and wasted time and resources, meaning they could not respond to real emergency calls.False alarms are costly and disruptive, amounting to around £1 billion a year for the UK they often require emergency responders to mobilise and respond to a non-existent emergency, wasting resources and time.False fire alarms can be costly for building owners with fines introduced for repeated false alarms from emergency services, as they may have to attend multiple times, causing a drain on resources that could be better used elsewhere.They can also cause panic and confusion, particularly if they occur frequently, making it harder for people to take the necessary steps to evacuate safely in the event of a real fire. Frequent false alarms can lead to complacency among building occupants, who may not take real fire alarms seriously, potentially putting themselves and others at risk.Firefighters attended false alarms a considerable number of times at Basset Lodge, an independent living facility for many elderly and disabled people. False fire alarms are not only disruptive for staff and residents, but also pose a risk to their safety, and place additional strain on fire and rescue services. These repeated false alarms can lead to complacency in the public, lowering the sense of urgency in real evacuations.Protective covers can help to control the number of accidental and malicious fire alarms, but there are many ways in which you can reduce false alarms, for example regularly checking and testing equipment to ensure it is not faulty is one approach to preventing unnecessary risk for the fire department and public from false alarms.As the original call point cover manufacturer, Safety Technology International manufacture tough covers have been specifically designed to help deter false fire alarms and to prevent malicious or accidental activation of manual call points. The strong, durable construction of our polycarbonate call point protectors means they can withstand the toughest knocks, whilst offering lasting protection against false fire alarms. With various models available in a range of sizes and colours, and multi-language or custom text options, we have covers suitable for most applications or devices. Sounder models help to deter malicious activations with an audible alarm that draws immediate attention to the area. Waterproof models also allow for outside application, protecting devices and manual call points against the ingress of dust or water.
Sponsored
Rethinking door automation with the FAAC A1400 Automatic Sliding Door Range

Rethinking door automation with the FAAC A1400 Automatic Sliding Door Range

FAAC Entrance Solutions UK

Introducing the A1400 automatic sliding door range, marking a significant stride into the future of automated entrance systems. The A1400 is not just another door; it is a revolutionary leap that sets it apart from its counterparts, delivering a blend of innovation, energy efficiency, and versatility.Within the range is the unique Airslide option, which is the only automatic sliding door with an integrated Air Curtain. The Airslide system combines the automatic opening and air curtain systems into a single unit, with aesthetic and functional advantages. Its sleek design makes it easy to integrate into any architectural context.At the heart of the A1400’s groundbreaking features is its innovative energy-saving technology, a marvel that goes beyond the basics. This smart system not only identifies transit direction but also optimises opening and closing times, preventing unnecessary air dispersion, even in the midst of cross traffic. Need to see data on the impact of this smart technology? Check out our case study in collaboration with Currys.What makes the A1400 even more impressive is its intuitive programming capability, allowing users to tailor the door’s operation to meet specific needs. Whether it’s a straightforward setup or a more complex configuration, the A1400 adapts seamlessly to cater to a diverse range of requirements.Adding to its appeal is the A1400’s versatile design, which goes beyond aesthetics to offer a multitude of leaf profiles and cover types. This diversity isn’t just for show; it signifies a commitment to redefining technical and architectural solutions in a variety of settings. The A1400 is not a one-size-fits-all solution; it’s a dynamic range that adapts to different environments with ease.Prioritising innovation is paramount, but safety is non-negotiable. The A1400 is designed with compliance and safety in mind, ensuring that it meets the stringent European safety standard EN 16005, trusting it with the highest regard for safety standards.In essence, the FAAC A1400 SERIES is more than a product; it’s a solution tailored to be as versatile as your needs, as reliable as your trust, and as sustainable as your vision.Experience the future of entrance automation with the FAAC A1400 SERIES – a solution that’s as versatile as your needs, as reliable as your trust, and as sustainable as your vision. Reach out to us today to explore how the FAAC A1400 SERIES can elevate your entrance automation game!The Full range:FAAC A1400 Automatic Sliding Door OperatorFAAC Airslide with Built-In Air CurtainFAAC All Glass Automatic Sliding DoorFAAC Framed Automatic Sliding DoorFor more information or assistance with any project, please contact enquiries.esuk@faactechnologies.com or +44 (0) 845 450 4633 where we can provide expert guidance and detailed documentation.
Sponsored
Lok'nStore Depots

Lok'nStore Depots

Jewers Doors Ltd

Leading self-storage specialists Lok’nStore have installed Jewers’ Swift bi-folding doors for customer access at their depots throughout the South of England.
Sponsored
Smart Fire Prevention System Installed in Luxury Apartments

Smart Fire Prevention System Installed in Luxury Apartments

Firechief Global

One Crown Place is the latest high rise addition to London’s skyline. Home to 246 luxury apartments, high-quality office space, a boutique hotel and members’ club, it is located between the City of London and Shoreditch. Designed by internationally renowned architects Kohn Pederson Fox (KPF), the development features two prismatic towers of 28 and 33 storeys.For the apartments, interior designers, Bowler James Brindley specified custom designed kitchens by Italian company Arclinea featuring a dark lacquered finish with engineered stone worktops and glass fronted cabinets.The Fire regulations which apply to high-rise living accommodation meant that the open plan kitchens in each apartment would require a fire suppression unit complete with sprinklers to be fitted. These units need to be installed and maintained by a specialist engineer and can also cause damage within a property should they be activated due to a fire.  Therefore, the team of architects, designers and builders were open to the idea of an alternative, unobtrusive design-led fire prevention solution, such as the Firechief Kitchen Stove Guard.
Sponsored
Full Steam ahead for Crittall in Birmingham

Full Steam ahead for Crittall in Birmingham

Crittall Windows Ltd

A new education facility for Birmingham City University – STEAMhouse 2 - marries the restored frontage of a former Victorian industrial building with a brand new addition designed to promote interdisciplinary courses that bring together artists, scientists and engineers with input from industry.  The locally-listed red brick and terracotta façade of the 1899 Belmont cycle works was preserved after a disastrous fire gutted the building in 2007. That now fronts a new brick building the rear elevation of which boasts Corporate W20 windows in black plus two fire-rated Crittall windows and two fire-rated Crittall doors installed in a fire escape. Beyond this is a new four and five-storey building comprising workshops and teaching spaces. The new and reconstructed buildings are linked by an open central space, beneath a transparent roof, to encourage interaction between students and trainees attending the new STEM (Science, Technology, Engineering and Mathematics) – based university courses on offer.  The Crittall profiles are sensitive to the industrial heritage of the original building while complementing the 21st century ethos underpinning the STEAMhouse’s ambitions. 
Sponsored
Infrastructure Rail

Infrastructure Rail

Hart Door Systems Ltd

Hart has supplied hundreds of industrial doors to infrastructure projects both across the UK and internationally.Project/doors:9 Electric insulated roller shutters14 Speedor Super high speed doorsThe challengeOld rail shutters are unreliable with a potential to free fall due to mechanical failure. Doors that are past their ‘asset life expectancy’ should be replaced to ensure up to date legislations are met. These areas tend to have varying traffic and need to be secure for safety. These dangerous situations can be remedied by replacing with new doors designed for purpose. The solutionHart completed a major contract to replace old and unreliable shutters at the Stewarts Lane depot, Battersea. The contract included the removal of old doors and re-installation of nine doors of varying sizes, the largest being 8.5m wide and 4.7m. Safedrive motors delivered quiet and smooth operation despite the size and improved security and safety for staff.The successHart replaced 14 of it’s own Speedors installed at Laira Depot, Plymouth which were still operational after 22 years. This is an astonishing length of service and a testament to the quality of product. Hart’s reputation for technical excellence developed over many years has given Hart a distinct edge when involved such contracts.The Review:“Your installation staff were extremely efficient and friendly workers. They carried out the work safely in a professional manner and there were no issues or problems on site. Both of them were a credit to your company.” First Great Western Ltd
Sponsored
Unilever

Unilever

Komfort Partitioning Ltd

Komfort’s Polar glazed partitions were used to divide spaces and create enclosed meeting areas. This is a stylish solution which allows light to permeate the space and creates an environment which encourages collaboration and creativity. Manifestations were used on the glazing to meet Health and Safety regulations and also to provide privacy when necessary. To maximize the use of space, whilst meeting stringent fire and acoustic performance requirements, we selected our Komfire system. Komfire offers a distinct angular partition that was integrated with door frames. Komfort manufactured the ceilings and Formica doors which were used on the meeting rooms.
Sponsored
The Adelphi Building, 1-11 John Adam Street London Highly Commended Refurbished

The Adelphi Building, 1-11 John Adam Street London Highly Commended Refurbished

Shadbolt International

The Adelphi is an iconic art deco building & the plans for its refurbishment, took this into account, when thinking of its new design. We were asked to manufacture & supply, bespoke horizontally orientated, SG European oak veneered panels, fire performance doors & toilet cubicle fronts. Horizontal matching throughout called for a detailed analysis of the scheme, ensuring the horizontal matching was seamless throughout the project. All the veneer was a stained finish, making the project even more of a challenge as colour consistency throughout was key . We also supplied factory primed doors & framesets for finish on site.
Sponsored
PRESTIGE ALL PARTS - AUTOMATIC SLIDING DOOR

PRESTIGE ALL PARTS - AUTOMATIC SLIDING DOOR

Next Doors Ltd

Our client Prestige All Parts, a car dealership, aimed to establish a new showroom and office space. They sought an innovative solution that would not only set their showroom apart but also ensure functionality and appeal to visiting customers.To address our clients needs, we proposed a comprehensive redesign of the shopfront. The focal point of our solution was the integration of expansive windows to maximise the influx of natural light into the showroom. This strategic approach aimed to create an inviting ambiance while showcasing the displayed vehicles in their best light. In addition to that, the implementation of a sliding automatic door system for the main entrance allowed for enhanced accessibility and also offered a seamless and user friendly experience for customers entering.Beyond its practical benefits, such as ease of access for visitors, this feature symbolised the dealership’s commitment to modernity and innovation. By implementing these proposed solutions, our client not only transformed their physical space but also redefined their brand identity.
Sponsored
Royal Arsenal River

Royal Arsenal River

SELO

Royal Arsenal Riverside sits at the heart of Woolwich and occupies a prime location along the River Thames.The development is delivering 562 apartments and ground-floor commercial space on a 1.1ha site that forms part of the wider Royal Arsenal Waterfront. The scheme comprises three buildings of varying heights over a common single-storey basement.The ambitious waterfront scheme transforms an underused parcel of land into a new, thriving neighbourhood that enhances its surroundings. It is located at the end of the new linear park which aspires to establish a unique relationship between town and water; linking the town centre in the south to the river frontage in the north.Our high-performance metal riser doorset, Quadra was used throughout the development. Perfect for concealing fire-rated riser doors, access panels, and internal doors in corridors, landings, and other access areas; Quadra+ is supplied as an integral, four-sided frame and door system, pre-constructed to form a single robust unit. Ideal for hidden commercial access solutions, Quadra+ is designed and manufactured to the highest standards.A design innovation – Quadra+ is the original riser doorset from Selo, now featuring an Adjustable Frame to enhance installation speed and fire compliance. The screw-operated adjuster bolts allow for simple and secure Quadra+ frame installation.
Sponsored
Teckentrup Door Solutions supplies 100s of doors for new UK Lidl Stores

Teckentrup Door Solutions supplies 100s of doors for new UK Lidl Stores

Teckentrup UK Ltd

New Lidl stores and stores undergoing refurbishment around the UK are now supplied with Teckentrup steel doors and doorsets. Lidl has a standard footprint for every store, however at each location there are differences. Changes are driven by planning restrictions, site space, etc, and it means each site is unique to some degree.Teckentrup works with LIDL and its contractors to identify the variances and advise on the solutions long before sending products to site. Doors are typically at the end of the build programme; contractor knowledge is limited and specifications are constantly changing. A recipe for potential problems...
Sponsored
Erith and East Ham Fire Station

Erith and East Ham Fire Station

Langley Waterproofing Systems Ltd

The purpose: Energy savings of £¼million over 20 years at just two of its sites are predicted to be achieved by London Fire Brigade through effective roof refurbishment using our Roofing Solutions. The brigade identified that the roofs at Erith and East Ham Fire Stations were in need of refurbishment. Numerous intermediate repairs had already been undertaken. An efficient solution was needed to help London Fire Brigade optimise best value in its asset management and reduce its requirement for planned- or unplanned- maintenance.London Fire Brigade therefore turned to Currie & Brown construction management consultants to oversee the design and execution of the refurbishment projects under a contract management framework agreement in place between the two organisations. We was called in to assess the roofs and advise on a course of action. Data driven roof condition reports from surveys were taken across the two premises. We highlighted that the roofs were beyond economical repair and needed new waterproofing and insulation- a U value of 5.00W/m2K was discovered in one roof area, against the Regulatory threshold of 0.35W/m2K and best practice 0.18W/m2K. Our solution: We advised that in the main, overlaying of the existing roof covering with CP-20 Paracoat Cold Polyurea Liquid System (warm roof) application was the most-efficient and cost-effective solution.The over-laying using the CP-20 system satisfies London Fire Brigade’s policy of preference for flame-free, with no roof replacement needed this minimised waste to landfill.Our Approved Contractor CWG Group won the contracts to undertake the upgrading, working to Langley’s detailed individual specifications for each site.At East Ham Fire Station, four main roof areas plus a separate ancillary building were addressed.LangGuard free-standing safety rail was installed around the perimeter of roofs 1 and 4.The final touch for the field roof area was provided with Paracoat Fast SF slip-inhibiting finish to agreed walkway areas.At Erith Fire Station, the refurbishment involved upgrading two roof areas including a rooftop tank room and adjoining canopy of corrugated PVC over the Station building, and a separate stores roof.
Sponsored
RDaSH - En suite Doors

RDaSH - En suite Doors

Intastop Ltd

Rotherham Doncaster and South Humber NHS Foundation Trust (RDaSH) operates services in 200 locations across Rotherham, Doncaster and North Lincolnshire. It provides a range of inpatient and community mental health , learning disability and addiction services for adult, young people and children. The solution offered by Intastop was to ensure the door had full anti-ligature protection with the Door Top Alarm and fully clad the door in high quality anti-bacterial impact protection sheet which prevents water absorption and protects from damage.
Sponsored
30 Berkeley Square

30 Berkeley Square

SELO

Elevating Artistry and Functionality at 30 Berkeley Square.Nestled at the intersection of Davies Street and Mount Street, commanding a breath taking view of Berkeley Square, 30 Berkeley Square has become a distinguished landmark within Mayfair. The recent renovation aimed not only to enhance the aesthetics but also to create functional spaces for art showcases and auctions.Our contribution to this transformative project extended beyond the visual spectacle, focusing on the functionality of the space. We supplied bespoke metal riser doors, carefully crafted to blend seamlessly with the overall aesthetic. Fire-rated and tailored to precise specifications, these doors play a crucial role in maintaining safety standards while ensuring a cohesive design throughout the building.To complement the artistic ambiance and add a touch of elegance, timber leaf riser doors were introduced. These bespoke doors, crafted with precision, contribute to the overall aesthetic harmony while serving as functional components within the space. The integration of timber leaf riser doors reflects a commitment to both safety and sophisticated design.
Sponsored
How to protect people from fire when designing a building?

How to protect people from fire when designing a building?

Trade Access Panels

When you design a building that will be used by lots of people, like a tower block, you need to make sure that the building has the correct level of fire prevention and fire protection equipment. In instances where this isn’t the case, tragedies like the Grenfell Fire can happen. The importance of passive and active fire protection methods are vital for the safety of the intended occupants, but how can you ensure they’re going to be safe?
Sponsored
Smart fire prevention system installed in London Westminster apartments

Smart fire prevention system installed in London Westminster apartments

Firechief Global

Carrick Yard in Westminster is a residential development comprising 168 one-, two-, three- and four-bedroom apartments, a community space and public sports hall as well as extensive landscaped public areas. The scheme delivers improvements to existing surrounding housing and public spaces and is part funded by Westminster City Council. It is the first development to be completed in the Church Street Regeneration area.The Fire regulations which apply to high-rise living accommodation meant that the kitchens in each apartment would require a fire suppression unit complete with sprinklers to be fitted. These units need to be installed and maintained by a specialist engineer and can also cause damage within a property should they be activated due to a fire.  Therefore, the Firechief Kitchen Stove Guard was chosen as an alternative, unobtrusive design-led fire prevention solution.
Sponsored
Required Testing and Certification Regime For CE marked fire shutters

Required Testing and Certification Regime For CE marked fire shutters

A1 Shutters Ltd

CE marking for fire shutters to BS EN 16034, BS EN 13241 following a fire test to BS EN 1634-1 is a legal requirement in the UK. https://a1sgroup.com/blog/a1s-group-policy-when-quoting-ce-marked-fire-shutters 
Sponsored
False fire alarms in leisure, retail, and hospitality premises

False fire alarms in leisure, retail, and hospitality premises

Safety Technology International Ltd

Every false fire alarm is costly, but in a post-COVID world, there is now even more pressure on the leisure, retail, and hospitality industries to prevent false alarms in their premises.The leisure, retail, and hospitality industries were hit hard by COVID-19; as we begin to emerge from the pandemic businesses will be keen to make up for lost time, avoiding the loss in revenue caused by false fire alarms.Home Office figuresDespite two years of restrictions and lockdowns, false fire alarms continue to cost the UK, Home Office figures reveal that there were a total of 2,497 false fire alarms caused by the “malicious activation of [a] fire call point/alarm” in England for the year ending September 2021 – surpassing challenged hoax calls as the largest reason for malicious fire alarms.Accidental activations too remained a significant cause of false alarms; 12,732 false fire alarms were recorded due to the accidental and careless activation of fire alarm and fire-fighting equipment, including manual call points.With the restrictions, closures, and reduced footfall faced by businesses, we might have expected to see the number of false fire alarms fall significantly during the pandemic. This serves as a timely reminder of the persistence of unwanted fire alarm signals, and the need for leisure, retail, and hospitality premises to seek a solution to avoid further disruptions post-COVID.Although necessary once a fire alarm sounds, a preventable evacuation ultimately means unhappy customers, disruption for businesses, and unnecessary strain for our stretched emergency services.At a time where it is prudent to avoid the crowded corridors and large gatherings at assembly points that follow a needless false alarm evacuation, it has become even more important to prevent false alarms.Continuing to be the largest incident type, false fire alarms accounted for 41 per cent of the incidents attended by Fire and Rescue Services in England for the period – fires accounted for just 27 per cent.Over £1 billionWith similar figures reflected across the UK, over £1 billion is lost every year due to false alarms. To recoup this cost the London Fire Brigade became the first fire service in the country to recover costs from buildings including leisure, retail, and hospitality premises, with a poor false alarm record.A false alarm is defined as a fire alarm signal caused by means other than a genuine fire, which has activated a fire detection and alarm system, these can include: equipment false alarm, environmental influences, accidental damage, and inappropriate human action, including the malicious activation of a manual call point.Under The Regulatory Reform (Fire Safety) Order Act 2005, it is the responsibility of the building owner or the ‘responsible person’ to ensure effective fire precautions are in place to protect staff, customers, or visitors.Several precautionary steps can be implemented to prevent false fire alarms before they occur; routine testing and maintenance to call points is a must to assure proper operation, but it is not the only proactive approach.BS 5839-1:2017As recommended in BS 5839-1:2017 manual call points should be fitted with a protective cover to prevent false fire alarms. The British Standard Institute recommends in section 20.2b, that: “All MCPs should be fitted with a protective cover, which is moved to gain access to the frangible element.“It is now recommended that a protective cover is fitted to a Type A manual call point to help prevent false alarms.”Following the introduction of the new recommendations in 2017 malicious false fire alarms have fallen by 18%, an indication of the effectiveness of protective covers, however, every false alarm is still costly.Firefighters respond to fire signals as if they are real, this exposes the public and fire crew to unnecessary risk in their swift response to false alarms, directing them away from real emergencies.LeisureLeisure premises are particularly susceptible to false fire alarms, whether it be wayward sports equipment in sports hall and gymnasiums, or high-traffic areas in music venues, cinemas, and theatres.Concerts, football matches, and even pantomimes have all been interrupted mid-performance in the UK, and in some cases even cut short by false fire alarms – resulting in disgruntled fans and calls for refunds.Government fire safety guidance for theatres, cinemas, and similar premises, highlights the need for protective covers to combat both accidental and malicious activations: “To reduce the risk of malicious or accidental operation which may promote panic you should consider as part of your management plan alternative arrangements such as the guarding of manual call points (e.g. with a simple, easily removed, cover).”A hinged cover around a call point is also likely to solve the problem of accidental activation or damage in storage areas where there is a continual movement of equipment.Whilst guidance for open air events and venues draws attention to the high risk of malicious activations in certain public areas, such as large beer tents – in this instance, alarmed call point covers might be more effective.RetailFor retail premises, trollies and shopping bags threaten the accidental activation of manual call points and the evacuations that follow threaten both a loss of customers and profit. However, robust polycarbonate covers can be fitted to protect sensitive break glass units and deflect heavy blows.This is reinforced by the Government’s fire safety risk assessment for shops: “False alarms from electrical fire warning systems are a major problem (e.g. malicious activation of manual call points) and result in many unwanted calls to the fire and rescue service every year.”Shopping centres and supermarkets are regularly forced to evacuate hundreds of shoppers due to unwanted fire alarm signals; abandoning their shopping on conveyor belts, baskets, and trollies. Owing to the disruption many choose not to return to complete their purchases.HospitalityThis phenomenon can be particularly detrimental for the hospitality industry, where evacuations following false fire alarms leave restaurants and bars vulnerable to incidents of “dine and dash.” Some hospitality premises have lost out on upwards of £1,000 when customers walked off without paying after a false alarm.Fire safety guidance for licensed premises reinforces the need to put a stop to false fire alarms within the industry: “Fire alarm systems should normally conform to the current edition of BS 5839, with consideration made for prevention of false alarms.”Alarm fatigueRepeated false alarms reduce the public’s confidence in fire alarms, contributing to alarm fatigue and a complacent attitude towards evacuations. Alarm fatigue occurs when a person becomes desensitised to an alarm due to repeated false alarms and as a result, fails to react appropriately in an emergency – having potentially fatal effects.The Manchester Woolworths fire in 1979 is a devastating example of alarm fatigue, as the fire alarm sounded customers were reluctant to leave the store. By the time they realised they were in danger, it was too late, ten people died in the blaze.Alarm fatigue also poses a serious threat to the hospitality industry, with Government fire safety guidance for sleeping accommodation, such as hotels, stating: “If there are excessive false alarms in your premises, people may become complacent and not respond correctly to a warning of a real fire. In such circumstances, you may be failing to comply with fire safety law. All false alarms should be investigated to identify the cause of the problem and remedial action taken.”In some areas of hospitality premises, such as function rooms in a hotel, call points can be vulnerable to malicious and accidental activations – to reduce this risk, protection for manual call points is advised.Some hotel guests react casually to fire alarms, often wrongfully believing them to be a “hoax” or “prank”, reducing response time and delaying evacuation. As recommended in BS 5839-1:2017 manual call points can be fitted with a protective cover preventing false alarms whether accidental or malicious, halting alarm fatigue.Call point protectorsSafety Technology International manufacture a range of protective covers, specifically designed to prevent false alarms whether accidental or malicious.The STI story began in 1980 with a challenge by a school headteacher who wanted to stop their false fire alarms. Founder, Jack Taylor, used his expertise in security systems to invent the first and original Stopper® polycarbonate protective cover. From integral covers to outdoor and sounder models; there are now variations to suit all applications.The tamper-proof polycarbonate covers ensure call points are protected without restricting legitimate use in a real emergency, a combination of optional warning alarm, flashing beacon, and break seal acts as a deterrent against malicious activation.As we enter transition to the “new normal” it is imperative the leisure, retail, and hospitality industries prevent false fire alarms in their premises. Conforming to BS 5839-1:2017 to protect manual call points from false activation, whether accidental or malicious. Not only to aid economic recovery post-pandemic but to keep fire safety at the forefront of customers’ minds. Failure to address false fire alarms allows alarm fatigue to manifest, and this can prove to be costly – in every sense of the word.
Sponsored
Queen Elizabeth Olympic Park

Queen Elizabeth Olympic Park

ASSA ABLOY Opening Solutions UK & Ireland

ASSA ABLOY Security Doors supplied steel doorsets to Queen Elizabeth Olympic Park. To meet the performance criteria set out by Poulous, the architect re designing the Olympic Stadium for the London Legacy Development Corporation. The requirements were to supply steel doorsets that meet the fire and security standards and stand the test of time for this prestigious project... Click on the link below to read more.
Sponsored
Adidas Superstore, Paris - Smoke Curtain Barrier

Adidas Superstore, Paris - Smoke Curtain Barrier

Coopers Fire Ltd

Coopers were commissioned to design and manufacture a bespoke curtain barrier system that, in the event of fire, would guard against smoke penetrating the upper floors of the store. Through regional partner Souchie, Coopers installed a series of Smoke Stop™ vertical smoke curtains above each escalator specifically designed to protect the means of escape for customers, whilst at the same time dramatically reduce the transmission throughout the building of life threatening gases generated by fire.
Sponsored
Roath Fire Station, Cardiff

Roath Fire Station, Cardiff

Anderson, GEC Ltd

Stainless steel worktops, by GEC Anderson, were deployed in the refurbishment of the mess room at Roath Fire Station in Cardiff. The kitchen units were supplied by Steelplan Kitchens.The continuous, high quality, stainless steel worktops provide a highly professional look and feel to the busy area within this important emergency facility. The requirements of hygiene, durability and safety are met by the worksuraces that feature integrated sink bowls as well as upstands to walls.
Sponsored
Paddington Exchange - Fire Rated Mailboxes

Paddington Exchange - Fire Rated Mailboxes

The Safety Letterbox Company

THE PROJECTPaddington Exchange is a collection of 123 high specifications one, two and three bedroom apartments arranged over fourteen spacious floors developed by Taylor Wimpey Central London.The development is located in a sought after canal-side location, situated on the site of the former North Western Community School, offering easy access to a number of high-end street cafes, restaurants and shops. A wealth of transport links around the city are found at the site of the Paddington Exchange project.THE PRODUCTThe project features multiple banks of wall recessed fire rated 2 mailboxes located in the entrance lobby area. The mailboxes contain a series of features and benefits that result in a ‘one hour integrity’ rating that conforms to the BS476 Part 22 fire standards. For more information, please visit our fire rated mailbox page.The mailboxes are finished in an IGP-DURA®xal paint using a Dark Bronze – E82987 colour. Each mailbox features engraved numbering in a COPASETIC NF font on the opening flap coloured with a contrasting black infill.The banks of mailboxes are completed with a surrounding trim used to mask the join between the mailboxes and the installation wall. Large panels are used in conjunction with the banks of mailboxes which allow for easy identification of the relevant mailbox for both the residents and postal delivery workers.
Sponsored
Malicious false fire alarm hits record high

Malicious false fire alarm hits record high

Safety Technology International Ltd

A record number of manual call points were maliciously activated across England for the year ending March 2022.The highest annual number of malicious false fire alarms on record came as people returned to public buildings en masse in a period markedly unaffected by COVID-19 lockdowns.The latest Home Office figures reveal there was a total of 3,212 false fire alarms caused by the “malicious activation of [a] fire call point/alarm” in England for the year ending March 2022, surpassing challenged hoax calls as the largest reason for malicious fire alarms.Accidental activations also increased over the period; 14,452 false fire alarms were recorded due to the accidental and careless activation of life safety equipment, including manual call points.Every false alarm is costly, disrupting schools and businesses, placing unnecessary strain on our emergency services and reducing public confidence in fire alarms.Despite online learning, working from home and limits on social contact, false fire alarm numbers, although down, persisted during the pandemic.As schools, offices and shops saw reduced attendance and footfall, malicious false fire alarms survived; now in a post-COVID world, there has been a boom in the number of false alarms plaguing the country.Continuing to be the largest incident type, false fire alarms accounted for 40 per cent of the incidents attended by Fire and Rescue Services in England for the period – fires accounted for just 26 per cent.Repeated false alarms reduce the public’s confidence in fire alarms, contributing to alarm fatigue and a complacent attitude toward evacuations. Alarm fatigue occurs when a person becomes desensitised to an alarm due to repeated false alarms and as a result, fails to react appropriately in an emergency.Safety Technology International manufacture a range of protective covers, specifically designed to prevent false alarms whether accidental or malicious.The STI story began in 1980 with a challenge by a school headteacher who wanted to stop their false fire alarms. Founder, Jack Taylor, used his expertise in security systems to invent the first and original Stopper® polycarbonate protective cover. From integral covers to outdoor and sounder models, there are now variations to suit all applications.The tamper-proof polycarbonate covers ensure call points are protected without restricting legitimate use in a real emergency, a combination of optional warning alarm, flashing beacon and break seal acts as a deterrent against malicious activation.In Wales, malicious false fire alarms rose by 33% to 426 during 2021-22, the highest figure for half a decade. And with similar figures reflected across the UK, over £1 billion is lost every year due to false alarms.To recoup this cost the London Fire Brigade became the first fire service in the country to recover costs from buildings like hospitals, airports and student halls with a poor false alarm record.Firefighters respond to fire signals as if they are real, this exposes the public and fire crew to unnecessary risk in their swift response to false alarms, directing them away from real emergencies.Under The Regulatory Reform (Fire Safety) Order Act 2005, it is the responsibility of the building owner or the “responsible person” to ensure effective fire precautions are in place to protect staff, customers or visitors.Several precautionary steps can be implemented to prevent false fire alarms before they occur; routine testing and maintenance of call points is a must to ensure proper operation, but it is not the only proactive approach.As recommended in BS 5839-1:2017, manual call points can be fitted with a protective cover to prevent false fire alarms. The British Standard Institute recommends in section 20.2b), that: “All MCPs should be fitted with a protective cover, which is moved to gain access to the frangible element.“It is now recommended that a protective cover is fitted to a Type A manual call point to help prevent false alarms.”
Sponsored
Watergate Bay Hotel, Cornwall

Watergate Bay Hotel, Cornwall

DRU Fires

DRU Polo gas stoves bring warmth and comfort to Cornish hotel suitesDRU Fires, in partnership with leading Cornwall fireplace dealer Kernow Fires, has supplied five DRU Polo balanced flue gas stoves for the new beach lofts at one of Cornwall’s leading hotels.Watergate Bay Hotel on the north coast of Cornwall, originally designed to a be a railway terminus hotel, has been developed into an inclusive year-round destination. Its spectacular clifftop setting and location just a short hop from Cornwall Airport Newquay makes it a primary choice for travellers from all corners of the UK and beyond.The recent closure of Jamie Oliver’s Fifteen restaurant on the site paved the way for the £1.4 million development of the seven new beach lofts by contractors GSI and interior designers Dynargh Design, right above the beach. Described as ‘surf-in surf-out’ accommodation, the lofts have floor-to-ceiling windows with panoramic sea views. All have been designed to feel like modern city lofts, with warm textures and sustainable materials.High energy efficiencyThe DRU Polo gas stoves were chosen by Dynargh Design for their contemporary design, fitting in with the overall design and aesthetic of the beach lofts. In addition, they were selected for their A energy rating, 92% efficiency and the convenience of gas with easy remote-control operation. They have all-year-round use and are suitable for chilly autumn days and cool summer evenings. Their balanced flue system offers flexibility of installation, as they require no chimney and only need proximity to an outside facing wall. This enables them to be installed in the living space, bedroom or bathroom subject to the design of each individual suite.The beach lofts were completed in time for Cornwall’s peak 2021 tourist season, which has been hugely successful due to many more people taking their holidays in the UK during the Covid 19 pandemic. Impressive outlooks and sustainabilityKernow Fires owner Simon Breckon commented: “We’re pleased to have contributed to the success of the beach lofts and have seen strong growth in Cornwall’s domestic and commercial fireplace markets this year.”Watergate Bay Hotel CEO Will Ashworth said: “The beach lofts are our best rooms. They are sized very generously and the interior design represents our new approach to contemporary Cornish beach living.” Dynargh Design director Matt Hulme said: “The lofts have some of the most impressive outlooks of any hotel in Cornwall. But the interiors also needed to have enough appeal in the winter, when it’s dark at 5pm, that it feels warm, natural and enticing.”Sustainability was also an important factor in the design. “Getting active in the beautiful natural environment is at the heart of the Watergate Bay experience, and we’re committed to minimising the environmental impact of our design choices,” adds Will Ashworth.For further information visit: drufire.com, kernowfires.co.uk and watergatebay.co.uk
Sponsored
River Street Tower

River Street Tower

The Safety Letterbox Company

THE LOCATIONThis brand-new student accommodation development is situated in the River Street neighbourhood of Manchester. The striking appearance of the development is down to the architectural design and materials used including the Cor-Ten steel alloy cladding which pairs perfectly with the dark blue painted panels.THE PROJECTThe development comprises 792 student bed spaces including a mix of studios and apartments and offers affordable, stylish, and accessible accommodation in the heart of Manchester whilst being a safe environment for students to learn, grow and live.THE PRODUCTSafety Letterbox discussed the design, layout and fire specifications of the project. After a few options were presented the client chose our FR2 mailbox. The FR2 mailbox is horizontal in front/ out front 2-hour fire-rated (integrity only) mailbox.Our 2-hour fire-rated mailbox range is commonly used within an evacuation route as they are capable of holding backfire or containing a fire for at least 2 hours, satisfying building and fire regulations.The mailboxes we’re powder coated in special colour – MATT Pearl Gold (RAL 1036) giving the mailboxes a stunning high-end aesthetic finish whilst being practical and completely secure. Multiple keys were also supplied, and doors were engraved for easy identification
Sponsored
The Gherkin, London. Smoke Curtains

The Gherkin, London. Smoke Curtains

Coopers Fire Ltd

Coopers solution was to install over 100 SmokeStop smoke curtain barriers. Concealed within the ceiling voids of each of the 39 floors, the SmokeStop smoke curtain barriers were developed to deploy in the event of fire, channelling smoke away from occupant and out of the building. This effective strategy for containing and channelling smoke would ensure that Gherkin’s 41 floors were protected from filling with smoke and provide occupants with a safe means of escape.
Sponsored
Sydney Light Rail Depot

Sydney Light Rail Depot

Jewers Doors Ltd

Jewers Doors’ Australian reseller, Max Door Solutions (MDS) have recently completed the installation of six sets of Swift-SEW bi-folding doors, for the new Lilyfield maintenance depot for Sydney Light Rail.
Sponsored
Queens Gate

Queens Gate

SELO

An existing Mews dating back to the 1860’s in close proximity to the Victoria and Albert Museum. The highly sensitive nature of this site required NLA to work closely throughout the planning and construction phases with LBKC to make sure the ambitious yet sympathetic design, bespoke to the client’s requirements was realised. In addition to a full refurbishment, complete with new basement, reworked layout and contemporary interior design, a double height atrium was introduced at the heart of the dwelling allowing natural daylight to permeate throughout each individual level whilst providing a secluded garden sanctuary away from the bustling streets of London.For this refurbishment, our Una was used which are the solution for timber leaf risers. Una utilises a timber door leaf with a concealed metal frame. Made to suit custom sizes, provided as a flat-packed kit prepared for all ironmongery. The wood door leaf comes with hinge cut-outs and can be primed for on-site finishing or pre-finished in our factory. Choose from non-fire rated or fire rated to E30 or E60.
Sponsored
11-12 Wellington Place

11-12 Wellington Place

Planet

Planet’s northern contracting team joined Wates and architects tp bennett to work on the Cat A fit out of 11 & 12 Wellington Place, manufacturing and installing 40 pairs of double leaf FireTec Ei60 fire rated doors with bronze handles across over 250,000 sq ft of grade A office space on Levels 1 to 10. These doors were installed to be ‘future proofed’ to facilitate any future automation requirements once sub-let to tenants.Manufactured using an ultra-slim precision engineered framework, the durability of the FireTec system suits high foot traffic areas while providing fire route protection and acoustic performance up to 39dB Rw.The multi-award-winning 11 & 12 Wellington Place achieved a BREEAM ‘Outstanding’ sustainability rating and is the first UK building outside of London to attain a NABERS Design for Performance rating of 5* or above.Wates handed over the completed shell and core works to clients MEPC in early 2023, with the building already securing several high-profile companies as tenants.
Sponsored
Port of Tyne

Port of Tyne

Hart Door Systems Ltd

The Port of Tyne is one of UK’s most efficient deep-sea ports, handling a diverse range of cargoes from cars to containers and bulk goods to renewable energy across five continents. They offer a unique end-to-end solution ensuring goods move safely, securely and efficientlyThe project4 Speedor Storms designed, manufactured and installed to mobile hoppersThe challenge:A key part of the port’s ship unloading procedure required fast and reliable doors to compliment their logistics process. Materials such as wood pellets are unloaded into hoppers which simultaneously load directly into lorries that drive into the hoppers. The process generates dust which must be controlled as a residential area is close by. These hoppers are in highly exposed areas and require a product that withstands strong winds.The Solution:The mobile hopper systems originally came with rigid doors that blew out as they were rated Class 3 and were not fit for purpose. We resolved the issue by installing robust Speedor Storms, the Speedor variant with exceptional wind resistance up to Class 5 (over 90 mph). Their automatic action and robust design ensured that the doors worked during all weather conditions ensuring the efficiency of the port is maintained.The success:The original project was to install 2 doors to the hopper systems. Due to the reliability of the first 2 doors, a further 2 Speedor Storms were installed a few years later. 

Showing 217-252 of 503

Feedback