NBS Source
I'm a manufacturer

"electrical power circuits and accessories"

3,572 results found

Sort by:

Showing 37-72 of 419

Sponsored
Battersea Power Station, London

Battersea Power Station, London

The Outdoor Deck Company Ltd

A vibrant new community is being created at Battersea Power Station offering the best retail, office, leisure and green space plus unique homes. Working with Maylim, the Outdoor Deck Company were specified for a multitude of areas across this 39-acre site, including the supply and installation of Cedar privacy screening for all apartments on the podium level plus a large Iroko deck area alongside the retail outlets. The Outdoor Deck Company were also responsible for the supply and install of timber seating in the specially designed communal areas and Cumaru seating, planters and a bespoke pergola on Level 8.
Sponsored
Type 100 Fully Electric - London School of Hygiene

Type 100 Fully Electric - London School of Hygiene

Movawall Systems Ltd

Our Type 100E Fully Electric movable wall was installed here a few years ago. This fully automatic system allows for ease of use and gives the client the ability to open or divide the lecture theatre in minutes with the touch of a button. With an acoustic rating of Rw 58dB, both sides of the theatre can have full AV lectures without disturbance. Each panel is hand crafted to millimetre precision to match every step and riser, then fabric wrapped in sound absorbing acoustic panels and installed by our own highly qualified technicians. There are walls, but there’s only one Movawall.
Sponsored
KEUCO accessories for international guests in the Hilton hotel at Munich airport

KEUCO accessories for international guests in the Hilton hotel at Munich airport

KEUCO

Pure luxury in the newly constructed building between the terminals  The 5-star Hilton Munich Airport hotel is situated like an oasis of tranquillity between terminal 1 and 2 at Munich Airport.The hotel enjoys a high occupancy rate and had an annex constructed to increase the number of exclusive rooms. Completed in 2016, only the finest of materials and finishes were used in the new building, to establish a very special atmosphere. With the abstract silhouette of the Alps and the wooden furniture, for example, the charm of the state capital of Bavaria is reflected in the premium interior furnishings. Select designer creations can be found in the sleeping areas, and naturally also the bathrooms. The interior architects JOI-Design, with proprietors Peter Joehnk and Corinna Kretschmar-Joehnk, were responsible for the concept design for the hotel rooms. Entering the bathrooms, the brilliant chrome finishes of the KEUCO accessories and the iLook_move cosmetic mirror immediately catch the eye. Gleaming luxuriously, the KEUCO products jump out at you from among the more unobtrusive colour schemes of the tiles and interiors. Designed by the renowned Tesseraux+Partner design agency in Potsdam, the iLook_move cosmetic mirror shines particularly with its extraordinarily clever and durable hinge design.The mirror can be arranged optimally vertically, horizontally and in angle of inclination. The rugged wall mounting and the premium quality and workmanship will make it an indispensable companion in the hotel bathroom for many years to come.Individually adapted PLAN grab bars from KEUCO grace the glass doors of the shower partition and the drawer of the washbasin cabinet and can also be used as a towel holder. Another PLAN grab bar in the shower provides guests with a sense of security. With its strong design, KEUCO's EDITION 11 shower basket hangs beside it in harmonious combination. Its striking yet discreet language of form lends the shower basket a unique aesthetic.
Sponsored
Type 100 Fully Electric - London School of Hygiene

Type 100 Fully Electric - London School of Hygiene

London Wall Design Ltd

Our Type 100E Fully Electric movable wall was installed here a few years ago. This fully automatic system allows for ease of use and gives the client the ability to open or divide the lecture theatre in minutes with the touch of a button. With an acoustic rating of Rw 58dB, both sides of the theatre can have full AV lectures without disturbance. Each panel is hand crafted to millimetre precision to match every step and riser, then fabric wrapped in sound absorbing acoustic panels and installed by our own highly qualified technicians. There are walls, but there’s only one London Wall.
Sponsored
Power Grab ‘n’ Bond for Installing External Showroom Signage Without Mechanical Fixings

Power Grab ‘n’ Bond for Installing External Showroom Signage Without Mechanical Fixings

C-TEC

Case Study – Power Grab ‘n’ Bond Customer: Signal Signs – OmaghProject: Pat Kirk Car Showroom, Strabane Power Grab ‘n’ Bond Eliminates the Need for Mechanical Fixings!Mechanical fixings on bright, new external facades can be ugly and distracting, especially when being installed at the entrance of Pat Kirk Motors stunning new car showroom in Strabane, Northern Ireland.With clean lines and seamless transitions throughout the building, mechanical fixings where exactly what the architect DID NOT want. This was the challenge presented to Michael from specialist installers McLaughlin Joinery who were tasked with fabricating the entrance and installing the façade design created by Signal Signs on extra-large 1500x3000mm sheets of Dibond® aluminium composite metal panels. A Stickler for Quality!Being a real stickler for quality and perfection Michael McLaughlin believes in always using the best materials, tools and brands to ensure the best, most durable and superior finish on his projects. He immediately sourced Power Grab ‘n’ Bond as he knew it is the best construction adhesive in the market, with excellent initial grab and exceptional tensile and sheer strength. Guaranteed to adhere to metal, wood and concrete substrates it totally eliminates the need for additional mechanical fixings. Power Grab ‘n’ Bond is developed by leading British manufacturers CT1, the No1 sealant and adhesive in the UK. CT1 is always leading and providing the industry with the very latest technology. Now thanks to its unique ‘Tribrid®’ technology Power Grab ‘n’ Bond is a revolutionary product in the field of heavy-duty versatile bonding. Why Choose Power Grab ‘n’ Bond?Working with large Dibond® metal 1500x3000mm panels being installed at height in an external environment Michael and his team needed a solution that would grab, hold and act instantly without needing to be braced and supported. With incredible initial grab, Power Grab ‘n’ Bond is a fast curing, non-shrinking and almost odourless adhesive that held the metal sheets with immediate effect.Three times stronger than regular hybrid polymers, the ‘Tribrid®’ technology in Power Grab n Bond ensures a phenomenal final tensile strength of 22kg/cm2, yet remains flexible, won’t dry out nor become brittle and will work effectively in temperatures ranging from 90°C right down to the Baltic cold -40°C.In fact, not only does Power Grab ‘n’ Bond successfully stick Dibond® to wood and concrete it will adhere to all metals (including lead), stone, granite, ytong, marble, MDF, fiberglass, glass, polystyrene, mirrors and most plastics (except PP, PE and PTFE).Creating a Superior Mechanical Fixing Free FinishUsing a heavy-duty caulking gun, Michael applied Power Grab ‘n’ Bond straight from the cartridge, onto the back of the Dibond® Sheets, allowing it to rest for 4-5minutes to begin activating, before fixing them directly into place.Originally created for facades and heavy stonework such as the installation of quoins, the versatility, strength and reliability of Power Grab ‘n’ Bond means it now used more widely by professional shop fit out companies as well as specialist trades, landscapers, kitchen fitters and bathroom installers. It is tested by a UKAS Accredited lab to BS EN 12003 (Determination of shear adhesion strength of reaction resin adhesives) and BS EN1308 (Determination of slip resistance).Power Grab ‘n’ Bond provided the perfect solution as it’s the ultimate grab adhesive, eliminating the use of mechanical fixings completely and coupled with the rapid curing characteristics saved a lot of additional labour time and cost.Michael said;“The result is exactly what the architect and client wanted, a stunning external façade, with no unattractive mechanical fixings, that not only makes a statement entrance but creates a stunning backdrop for promo photos of new cars too.”Grab also ‘n’ Bond is made in Britain with British technology and British design. Its available now in all good builders’ merchants nationwide and online from www.ct1.comCT1 often copied never equalled!We Innovate – Not Imitate!
Sponsored
White & Co, Battersea Power Station

White & Co, Battersea Power Station

Armourcoat Ltd

The striking interior was designed by LaVita Style and features Perlata providing a rich, yet elegant finish to the walls in the reception area and corridors. The design uses light and shade to reveal subtle textures and tones resonating a calm and reassuring atmosphere. Working to a soft colour palette the use of additional custom ArmourFX Granite polished plaster panels to the front desk creates a stunning first impression.Lucy Walker, interior designer at Lavita Style Ltd comments “We chose Armourcoat for this project for their specialist expertise and creativity and were absolutely delighted with the end results. We wanted to create a striking yet welcoming reception and waiting area and this was achieved through Perlata’s beautiful finish in a range of tones and colours. Armourcoat realised our vision throughout the whole design process and delivered seamlessly. I would certainly choose Armourcoat for any future projects”The new dental practice, White & Co is part of the innovative redevelopment work to convert the Grade II* listed legendary landmark into a unique blend of residential, commercial, and cultural spaces. Armourcoat has also been specified in various other projects within this exciting development including the Boiler House and Switch House West where Armourcoat Tactite was applied within various bathrooms, ensuites and powder rooms and Embassy Gardens which included Armourcoat Koncrete finishes to entrance areas and columnsClient: White & Co, Battersea Power Station, London Designer: La Vita Style @lavitastyleltd Contractor: Apollo Interiors Photography: Mark Bolton @markboltonphoto
Sponsored
Electric Car Charging Forecourt Cranked Bollards

Electric Car Charging Forecourt Cranked Bollards

Architectural Street Furnishings part of WB White Foundry

ASF manufacture stainless steel bollards for electric car charging forecourts, both as protection bollards and to house the chargers themselves. Manufactured to the highest standards in marine grade 316 stainless steel with polish finishes to meet any specification, these bollards can be either straight or cranked to provide the required protection and projection.
Sponsored
Living space as a power plant: Solar house

Living space as a power plant: Solar house

Hawa Sliding Solutions AG

The «Plus-Energie-Haus» constructed by the Technische Universität Darmstadt is a Solar Decathlon winner. The competition has been held each year since 2002 by the US Ministry for Energy. The task is to design and build a residential house to suit life that is self-sufficient with regard to energy. The houses must cover their entire energy requirements through self-produced solar power. Between two layers is a protected external area with sliding windows and folding slat shutters that can be opened and closed as needed. The folding sliding shutters are equipped with HAWA Variofold 80 H.
Sponsored
Turbine Hall A & B, Battersea Power Station

Turbine Hall A & B, Battersea Power Station

The Outdoor Deck Company Ltd

Over 10,000 square metres of the Thermo Ash 'hidden-fix' system were supplied for various external areas on the Turbine Halls of the iconic Battersea Power Station including the private roof terraces and balconies of the sky villas on the roof of the building, and roof terraces of the commercial office spaces.The use of the Grad system not only created stunning areas, but contributed to significant savings on the labour cost of installation.The installation of Thermo Ash used Grad aluminium rails with factory-placed clips for perfect alignment, placed on Buzon UK's PB range of pedestals where required.  
Sponsored
Battersea Power Station

Battersea Power Station

Lorient

Lorient supplied LAS8001 si drop seals with bespoke 'Battersea bronze' end caps, Batwing® perimeter seals, Finesse™ acoustic, smoke and fire seals, and lock and latch protection kits to the residential project.
Sponsored
Sound Absorption Solution for CCGT Power Station at Landivisiau in Brittany

Sound Absorption Solution for CCGT Power Station at Landivisiau in Brittany

CMS Danskin Acoustics

Efficient Approach Dramatically Reduces Turbine Noise at CCGT Power StationsTen years after it was first used at Uskmouth, this innovative approach to soundproofing that reduces insulation depth by up to 76%, is once again commissioned in France.Dangerous Levels of NoiseModern dry cooling systems offer many benefits over traditional systems in CCGT power stations, but they have the disadvantage of being a complex source of noise transmission. The turbine noise recorded coming from the dry cooling system at the Severn Power CCGT Power Station at Uskmouth was between 130dB(A) and 135dB(A). Exposure to these levels of noise, a full 50dB above The Control of Noise at Work Regulations 2005 “upper action level”, will cause both immediate and permanent damage.When acoustics and soundproofing specialist, CMS Danskin Acoustics, were brought in by SPX Cooling Technologies, designers of Uskmouth’s dry cooling system, they discovered not only high levels of noise but also that the noise generated had a very low-frequency bias, the most difficult noise spectrum to treat.Solutions for low-frequency noise issues typically involve wrapping the problem in significant quantities of acoustic insulation, with many standard solutions being as deep as 500mm to 700mm. The sheer volume of lagging required for an insulation-based approach to a project like Uskmouth, with 8,000m2 of ducting to be covered, would be expensive, time-consuming to install and prohibitively disruptive.The New Approach proven at UskmouthThe challenge of producing a soundproofing system that would be cost effective and efficient to install was taken up by CMS Danskin Acoustic’s Technical Direct Paul Absolon. CMS Danskin has a reputation for effective, high quality acoustic solutions tailored to the specific challenge, and this solution was no different.Exploring the wide range of acoustic materials from the company’s industrial acoustics range, Paul opted for a combination of materials working in concert: the unique CMS HTIB elastomeric isolation pads, constructed from a polyurethane-bound rubber granulate with excellent dampening and isolation characteristics; QuietSlab SVX3, a high-performance, mineral- fibre acoustic lagging; and WBKT Acoustic Barriers, a high-density, barium-sulphate-loaded thermoplastic polymer, which is thin, flexible and easy to work with.By using a bespoke combination of materials which each tackled specific aspects of the problem, CMS Danskin Acoustics were able to create a soundproofing solution with a construction depth of just 170mm, between 66% and 76% thinner than the 500-700mm standard solution. Disruption was minimised and material costs reduced.Once complete, the system was rigorously tested by SPX Cooling Technologies and Uskmouth’s main contractor, Siemen’s Energy. CMS Danskin Acoustics’ solution had reduced the noise generated by 39%, to just 82-83dB(A), under the 85dB “upper action level” listed in The Control of Noise at Work Regulations 2005.Peter Ullrich, project director, Siemens Energy, commented at the time:“Effectively controlling noise and reducing sound emissions was a top priority for us in the Uskmouth project. Not only was it essential that the dry cooling system satisfied all the legal acoustic obligations and regulations but just as important was that neighbouring properties were not disturbed by additional noise levels.”Repeat Success at LandivisiauTen years on, the same successful approach has been applied to the dry cooling system at the new CCGT Power Station at Landivisiau in Brittany, north-western France. Also built by Siemens, the dry cooling system was supplied by SPG Dry Cooling. In the case of Landivisiau, even greater sound reduction was required, from approximately 140dB(A) to below The Control of Noise at Work Regulations limit of 85dB(A).To meet this challenge, SPG and CMS Danskin collaborated on extensive testing at the acoustic testing laboratory of SRL Technical Services. The reductions achieved during testing as part of the specification process were some of the largest reductions in sound ever measured at SRL.Once the specification was confirmed, CMS Danskin worked with SPG to ensure that materials for the multi-layer acoustic solution were prepared and delivered efficiently so that SPG’s installers always had the correct materials on site. The installation of the acoustic soundproofing was completed in October 2021 and the power station entered commission as planned in April 2022.“CMS Danskin Acoustics Limited successfully supplied the acoustic material package for the project which was tested at SRL to give an overall lab test reduction of 68dB Rw.”Robert Hill, Project Manager, SPG Dry Cooling
Sponsored
Electric cassette blinds with screen fabric provide high street restaurant chain with a neat and seamless shading solution

Electric cassette blinds with screen fabric provide high street restaurant chain with a neat and seamless shading solution

Yewdale Corporation Ltd

When a blind company was tasked with replacing the electric blinds in a popular highstreet noodle restaurant chain in St Albans, they knew they could depend on Yewdale. They chose YewdaleDefiant® C27 electric cassettes with five blinds in Light Grey 1% Roe fabric. They also specified a fascia that could cover the entire length with three blinds on one barrel, saving the installation of three individual cassettes in one, large window. Read more about this project.
Sponsored
Kal Kitchen Accessories

Kal Kitchen Accessories

Polyroof Products Ltd

KAL is a member of the Gowan Group, a family-owned holding company, directly controlling many successful trading companies as well as significant property holdings and financial investments in public and private companies in Ireland, Northern Ireland and the UK.The largest appliance distributors in Ireland, KAL rely on a 30,000 square foot designer showroom for unique kitchen and domestic appliances. Their showroom at Dublin’s Citywest is one of the largest of its kind in Europe showcasing all their kitchen and consumer appliance brands.The ChallengeAfter conducting a survey of the 1,000m2 roof, it was determined that the areas of the roof, specifically the office area, were in need of repair. Some areas of the original roof build-up were starting to leak and lap joints failing due to a poor install.Following the site survey and adhesion tests, a site-specific specification was produced for the client and contractor to overview once all parties were happy with the proposals. With some complex detailing work involved, a decision was made to overlay the existing roof build with Polyroof Protec System.The SolutionPolyroof’s Protec System, a hybrid polymer liquid system with extremely fast curing and installation times, was the chosen system of use for the project. Due to its fully cold-applied application, the works could be carried out during working hours, with little disruption to the office staff below and little working time lost for the client.IPRS Limited, an experienced roofing and panel repair contractor and Polyroof Approved Contractor, were chosen to undertake the work on the project. Firstly, before any work could begin, the original waterproofing of the office roof was pressure-washed and cleaned down. Once all initial preparation was completed, the Protec System application could begin.All areas requiring priming before the main system application were primed and allowed to cure. Any joints were sealed using taping mat and Protec Resin and allowed to cure. Once this preparation had been completed the main Polyroof Protec System, chosen in light grey by the client, was applied.The first coat was allowed to cure before the final coat was applied. Due the Protec System Rapid Cure technology, the finished roof could be walked on after just 30-60 minutes after applications. This allowed for large roof areas to be made fully waterproof within a matter of hours. After the inspection was completed, the client received Polyroof’s trusted Accredited System Guarantee.Taking away the challenges of flat roofing projects.Polyroof’s reputation has been built on the high level of technical support provided to clients before, during and after every contract. We like to work closely with our clients from the very beginning of a flat roofing project right through to completion and throughout the lifespan of the roof. From our experience, this is the best way to guarantee that all aspects of the roof are finished to the superior standards that our clients expect.
Sponsored
National Grid Isle of Grain Power Station Case Study

National Grid Isle of Grain Power Station Case Study

Marsh Industries Ltd

The National Grid Site on the Isle of Grain is a very sensitive environmental area, from the site liquefied pressurised gas and electricity is distributed to the Southern UK, France and Belgium. Site required a sewage plant able to treat raw sewage to 15:15:10 standard. Due to the high water table, plant had to be installed above ground. Discharge from the sewage plant was directly into the Thames/Medway estuary. The Marsh UP was installed replacing the existing sewage plant that failed consent standards. The plant has performed better than the 15:15:10 standard set by the EA.
Sponsored
Louvred Wall Cladding for Electricity sub-stations at the Rock Shopping Centre in Bury

Louvred Wall Cladding for Electricity sub-stations at the Rock Shopping Centre in Bury

Lang+Fulton

The Rock is a 1.6million sq/ft mixed use development aimed at regenerating the town centre of Bury. The £350million project includes shops, restaurants, cinema, bowling alley, parking space and residential units. Lang+Fulton supplied 300 sq/m of custom-sized panels and 20 sets of doors to secure and ventilate the street-front elevations of the electricity sub-stations. These were made to fit the structural openings with concealed ancillary steelwork. Italia-100 steel louvred material was chosen for its vandal-resistant properties and was also impenetrable to any abuse from a foreign object.2.8m high Italia-80 was also used in the car park as an internal visual screen separating vehicle access from a service road. In addition 160m of 2.8m high Stereo grating panels were installed on the upper levels of the car park around plant areas and emergency exits.
Sponsored
The Challenges of Soundproofing in a Power Station Environment

The Challenges of Soundproofing in a Power Station Environment

CMS Danskin Acoustics

The fact that power stations produce high levels of noise won’t come as much of a surprise to anyone who has spent more than a few minutes inside one. Quite how dangerous these levels of noise can be, however, might.How Loud is ‘Too Loud’?To give you an idea of the sensitivity of the human ear, the average person can hear sounds down to about 0 decibels (dB), the equivalent of a whisper or rustling leaves, and people with exceptional hearing can detect sounds as low as -15dB.It is at the other end of the scale, however, that serious problems can occur. At around 85dB, you are likely to experience discomfort. As little as eight hours of continuous exposure to this level of noise can result in permanent damage to the inner ear, which is why 85dB is the maximum allowed under the Noise at Work Regulations. At 100dB, just fifteen minutes of exposure can cause permanent damage. And at 110dB the exposure time drops to around a minute before harm is inflicted. Pain is experienced at 125dB and hearing loss can be permanent. At 140dB or above not only is the damage permanent, it is also immediate.The Noise at Work Regulations stipulate that an ‘employer shall ensure that risk from the exposure to noise is either eliminated at source or, where this is not reasonably practicable, reduced to as low a level as is reasonably practicable.” And that “if any employee is likely to be exposed to noise at or above an upper exposure action value, the employer shall reduce exposure to as low a level as is reasonably practicable by establishing and implementing a programme of organisational and technical measures, excluding the provision of personal hearing protectors, which is appropriate to the activity.” In other words, an employer is expected to do everything they can, within reason, to protect their employees from the harmful effects of noise. And, no, it isn’t enough to simply supply a pair of ear-defenders.Noise-Induced Hearing LossThe damage caused by these dangerous levels of noise is referred to as Noise-Induced Hearing Loss or NIHL. NIHL can be caused by a single exposure to a very loud sound or by repeated exposure to even relatively low levels of noise over a long time span. In fact, according to research carried out by Xiaoming Zhou from the East China Normal University in Shanghai, even seemingly innocuous sounds, such as the whirr of a desk fan, can cause damage if exposure is consistent and long-term.To understand how NIHL occurs, it’s necessary to understand how hearing works.The generally accepted view is that sound waves strike the eardrum and these vibrations are translated into coherent information by the brain. It is slightly more complex than that. Sound waves do, indeed, strike the eardrum, causing the eardrum to vibrate. These vibrations are then transmitted through the ossicles (the small bones of the middle ear) to the cochlea, a spiral-shaped chamber filled with fluid and lined with tiny hair cells called stereocilia. The vibrations cause the fluid to move which, in turn, causes the stereocilia to move. The stereocilia’s movements generate neural signals with are picked up by the auditory nerve which ‘forwards’ these signals onto the brain where they are interpreted as intelligible sounds human speech, music, the beep of car horn etc.Exposure to the harmful levels of noise mentioned above can damage the stereocilia, breaking them or flattening them so they no longer vibrate as effectively or so they no longer vibrate at all. The result: impaired hearing or, in extreme cases, total hearing loss.The noise recorded coming from the dry cooling system at the Severn Power CCGT Power Station at Uskmouth B was between 130dB(A) and 135dB(A), a full 50dB above Noise at Work Regulations’ acceptable levels. Regarding dB(A), the human ear does not hear all frequencies with the same intensity. It is most sensitive to sounds in the 500Hz-8kHz range. Above and below this range the ear becomes progressively less sensitive. To compensate for this, sound level meters incorporate electronic filtering to correspond to the varying sensitivities of the ear. This filtering is called A-weighting and readings obtained with this weighting are referred to as A-weighted and signified as dB(A).The Wrong Kind of NoiseAlthough it was identified that the dry cooling system from SPX Cooling Technologies was generating these dangerous and unacceptable levels of noise, it wasn’t the cooling system that was creating the noise. In fact, it was the turbines that were the source of the noise. The steam roaring from the turbines at incredibly high speeds enters the main 5.5m steam ducts, passes up five risers and is channeled into the steam distribution manifolds. Not only does the steam enter the dry cooling system, the accompanying noise does, too. You might think that the 8mm thick steel from which the ducts are constructed would go some way to containing the din. Unfortunately, steel is extremely adept at transmitting noise and is, in many respects, the acoustician’s worst enemy.To make matters worse, when acoustics and soundproofing specialists, CMS Danskin Acoustics, were brought in by SPX and Uskmouth’s main contractors, Siemens, they discovered not only high levels of noise but also that the noise generated had a very low-frequency bias. Low-frequency noise is the most difficult to treat from a soundproofing perspective due to the excessive length of the wave cycle. This is one of the reasons people in apartments, terraced houses and semi-detached homes will often complain of the problems of bass noises intruding from neighbouring properties, as the walls and floors filter out the higher frequencies whilst the lower frequencies manage to penetrate. This can seem a little counterintuitive, as we imagine higher frequency noise to be more piercing. Their short wave-cycle, however, means they can be blocked out with relatively thin soundproofing materials.The low-frequency nature of the noise also meant that this wasn’t just a Noise at Work Regulations problem. Low-frequency noise can be particularly problematic to the population in the vicinity of the source of that noise. Low frequency noise is often not even ‘heard’ in the traditional sense. Complainants often won’t even realise that noise is the problem at all; instead they will describe ‘pressure sensations’ and ‘physical discomfort’, experiencing the incursion as vibrations. Areas of the human body can resonate when exposed to low frequencies. The chest, for example, can resonate at frequencies between 50Hz and 100Hz, and the head at frequencies between 20Hz and 30Hz. It isn’t unusual, therefore, for sufferers of low frequency noise to complain of anxiety, nausea and headaches. Often, they won’t even be aware of the root cause of their symptoms, instead attributing them to a virus or some mystery illness.A New Approach and a Sound SolutionSolutions for low-frequency noise issues typically involve wrapping the problem in significant quantities of acoustic insulation, with many standard solutions being as deep as 500mm to 700mm. The sheer volume of lagging required for an insulation-based approach to a project like Uskmouth, with a daunting 8,000m2 of ducting to be covered, would be expensive, time-consuming to install and prohibitively disruptive. What’s more, there were areas around the ducting at Uskmouth which simply wouldn’t have been able to accommodate such an excessive construction height of soundproofing material.Paul Absolon, CMS Danskin Acoustics’ Technical Director, responded to the challenge of creating a ‘thinner’ soundproofing system that would meet the necessary Noise at Work Regulations requirements but would be cost-effective and efficient to install. In order to minimise disruption to Uskmouth, an off-site simulation was created near Burton on Trent, using a large section of identical ducting with a ‘door’ sealing up either end. Within the duct were several very powerful speakers. For testing, highly sensitive microphones were placed in strategic positions along the outside of the duct to measure any ‘leakage’. Acoustic insulation solutions were conceived, implemented and assessed in this controlled environment with the assistance of Acoustic Consultants Muller-BBM and the installation company Western Thermal Insulations.Exploring a wide range of acoustic materials from CMS Danskin Acoustics’ industrial acoustics range, it was clear that a single product was not going to be able to solve the problem on its own, so Paul opted for a combination of products working in concert, layer upon layer.The first layer consisted of CMS HT1B elastomeric isolation pads, constructed from a polyurethane-bound rubber granulate specifically formulated to dampen and/or isolate noise and vibrations at source and independently tested by the Institute of Structural Dynamics at the Technical University of Dresden. The 50mm thick pads were bonded to the surface of the duct at a rate of nine per square meter, creating 300mm spacings; so, as well as the dampening effects of the material itself, the construction benefited from large, evenly distributed airspaces in its foundations. Sound waves move less effectively through dead air.The second layer consisted of 50mm-thick QuietSlab SVX3, a high-performance, mineral-fibre acoustic lagging. MIMA (the Mineral Wool Insulation Manufacturers Association) describe the acoustic insulation properties of mineral wool (and mineral fibres more generally): “Porous materials such as mineral wool work to control and reduce noise by allowing air movement into the fabric of the material. The fluctuations of air molecules – which form sound waves – move into the body of the mineral wool, where friction between the air particles and the material’s narrow airways cause sound energy to be dissipated as heat.”
Sponsored
Farnborough International Launches 22kW Quantum EV Charging Pedestals at Major Electric Vehicle Event

Farnborough International Launches 22kW Quantum EV Charging Pedestals at Major Electric Vehicle Event

Rolec EV

Farnborough International, a leading venue for aerospace and automotive events, sought to create a robust charging network for their visitors in time for the Fully Charged LIVE (FCL) South exhibition and future events. Working closely with the venue, Rolec EV provided nine bespoke-branded Quantum dual EV chargers, totaling 18 chargepoints across two car parks.Powered by Monta, these chargepoints allowed visitors to book charging in advance and introduced a Smart Queue feature to optimise charging availability. The initiative resulted in significant benefits, including revenue generation and enhanced visitor experience.Click "view more" to read the full case study.
Sponsored
Horizon Nuclear Power HQ

Horizon Nuclear Power HQ

Planet

Main contractor Kier Construction asked Planet Partitioning to put together the specification for the internal fit-out of meeting rooms and offices over three storeys.Working with architects Harmsen Tilney Shane and Frank Shaw Associates, Planet Partitioning designed, manufactured and installed p54 double glazed partitioning, in line with the architects’ vision. Planet Partitioning needed to adhere to sound attenuation levels of 45 dB Rw, so Sonotec doors were installed throughout the meeting rooms and offices. These are Planet's premium door range – widely considered to be the best performing acoustic glass doors on the market. Work completed in November 2015.
Sponsored
Selfridge & Co.

Selfridge & Co.

CAT (Carpet Accessory Trims) Limited

C.A.T. worked alongside Selfridges designers to produce a stair nosing finish that creates a fantastic welcoming first impression upon entrance into the Food Hall.
Sponsored
Heythrop Park

Heythrop Park

CAT (Carpet Accessory Trims) Limited

Project: Heythrop Park, Warner Leisure​Location: The Cotswolds​Design Team: Design LSM​Flooring Contractor: Carters Flooring, Derby The stunning Heythrop Park is an 18th century country house, which has recently undergone a £40 million refurbishment. It was designed by Architect Thomas Archer at the request of the 1st Duke of Shrewsbury, Charles Talbot in 1704, and was inspired by the Italian Baroque style, which the Duke had picked up on his travels to Rome. ​Throughout the years it has been passed through families and has also been used as a College and Training Centre, and then onto a Golf & Country club around 1999.​Bourne Leisure purchased Heythrop Park in 2018, and then reopened in 2022 after the spectacular transformation.  Throughout the Hotel you will find our Brass Flooring Profiles and Stair Nosings, all in a satin brass finish, giving that luxurious but subtle gold detailing.
Sponsored
Science Museum

Science Museum

CAT (Carpet Accessory Trims) Limited

C.A.T. profiles were installed recently into the  £24m refurbishment of the “Welcome Galleries” within the Science Museum.
Sponsored
Brighton College

Brighton College

CAT (Carpet Accessory Trims) Limited

C.A.T. AN15R stair nosings lead the way on numerous staircases throughout the centre. With aluminium castellated ATI49.5 inserts, visually the all aluminium profiles define the step edges also creating excellent slip resistance. A C.A.T. survey team member attended the site with the customer to discuss the suitability of products and requirements, which enabled faster project completion. Designed by OMA Architects, the £55m centre creates an interplay between sports and sciences. A rooftop running track with panoramic views of the sea leads down to the science and laboratory departments, auditorium, double-height sports hall, internal running track and a 25-metre swimming pool. Central to the building concept was social communication with large break-out spaces connected by wide, visually open staircases that link up departments. ​ ​
Sponsored
Mapei wood flooring adhesives used to install luxury flooring at prestigious Battersea Power Station apartments - (phase 1).

Mapei wood flooring adhesives used to install luxury flooring at prestigious Battersea Power Station apartments - (phase 1).

Mapei (UK) Ltd

Mapei products for the installation of wood flooring were specified to install floor coverings including over 63,000m2 of Domus wood flooring throughout all of the residential and penthouse apartments at Battersea Power Station, London. The construction of over 850 apartments at this iconic site has been completed during the first phase of building. With Mapei’s adhesive Ultrabond Eco S955 1K to furnish every apartment in the prestigious development. Ultrabond S955 can be used with all types and sizes of engineered and solid wood flooring, hence it’s suitability for the installation at Battersea Power Station.
Sponsored
Battersea Power Station

Battersea Power Station

Colt International Ltd

Coltshaft Smoke Extract to residential corridors
Sponsored
Lots Road Power Station - London

Lots Road Power Station - London

EFFISUS

On January 2006, the Secretary of State granted the permission for the project, and the developer was really confident that it will be completed by 2013, but it got delayed because of the economic downturn. This is a £1 billion scheme and it is considered “the biggest riverside development on the north bank of the Thames for over 100 years”, creating 106 homes. In this project Effisus Pre-fab True Seal, a pre-fabricated sealing solution, was developed and applied for sealing difficult facade 3D details, minimizing human error possibility.
Sponsored
The SPACE STEP plinth solution - a hidden accessory

The SPACE STEP plinth solution - a hidden accessory

Blum UK

The fate of seldom-used items and kitchen utensils is clear. They almost always end up in wall cabinets where users can hardly reach them. And when they are needed, even tall people will resort to a step stool − just to make sure they can see and find what they are looking for.
Sponsored
Football Club Refurb

Football Club Refurb

CAT (Carpet Accessory Trims) Limited

This redeveloped multi-purpose stadium was designed to accommodate over 62,000 spectators. C.A.T. worked very closely with F3 Architects to understand their vision for the redevelopment and offer solutions to the different transition areas bringing the interiors to life.
Sponsored
The Victoria Palace Theatre

The Victoria Palace Theatre

CAT (Carpet Accessory Trims) Limited

C.A.T. worked closely with Affinity Flooring and 8Build, and supplied hundreds of metres of solid brass stair nosings and flooring profiles for the theatre. After numerous site visits and meetings, C.A.T.'s fabrication team formed a variety of shaped stair nosings for the curved step areas throughout the main auditorium.
Sponsored
The Royal Opera House

The Royal Opera House

CAT (Carpet Accessory Trims) Limited

Our 19mm solid brass turned stair rods were installed to complement the classic theme and give that subtle lift to the large, grand staircases.
Sponsored
Westminster Methodist Church

Westminster Methodist Church

CAT (Carpet Accessory Trims) Limited

CAT stair nosings have been installed into one of the Worlds first purpose-built meeting facilities based in Westminster, London.​AN69 was the main section to fit the rounded step edge, then aluminium extension piece ANEXT creating a wider tread connected to an ANRE25 ramp edge at the back covering the safety vinyl flooring. Finally, the robust Aluminium ATI49.5 aluminium inserts were inserted into the tread of the AN69 to conceal the screw head fixings and give an all-aluminium finish.​Opening in 1912, the Great Hall has an impressively long history for hosting various events, the first meeting of the United Nations in 1946, debates, concerts and shelter for Londoners during the second world war.​Situated in the venues undercroft, Wesley’s Cafe is a hot spot for visitors and especially popular with tourists, the cafe covers over 300m2 and also is adjacent to further event space. Due to the entrance into the cafe is via a staircase, the constant high footfall called for a stair nosing made up from a combination of our Aluminium products.
Sponsored
St James Street, London | MOTUS Power-assisted pocket doors with effortless activation and a smooth, silent operation.

St James Street, London | MOTUS Power-assisted pocket doors with effortless activation and a smooth, silent operation.

SELO

Power-assisted pocket doors with effortless activation and a smooth, silent operation.A contactless electro magnetic propulsion system silently opens and closes the door with no or minimal user handling.Motus can be controlled several ways depending on your application:Nudge and goThe standard method; simply nudge the door open or closed and Motus will assist with the rest.Touch-less sensorThe sensor is fitted to the wall and by simply moving your hand in front of the sensor this activates the door.Simultaneous openingNow available as standard when using double doors, Simultaneous opening activates both leafs in a seamless fashion.Fire rated to FD30All trim designs (Visible / Concealed / Shadow Gap) and on all configurations over a wide range of sizes.
Sponsored
The Corniche, Battersea Regeneration Area

The Corniche, Battersea Regeneration Area

CAT (Carpet Accessory Trims) Limited

Working with The Corniche architects and interior designers C.A.T. products were specified for the luxury apartment development with prices from £3,600,000 to £7,000,000.
Sponsored
Hinkley Point C Nuclear Power Station

Hinkley Point C Nuclear Power Station

BioClad

Work has begun on the workers’ accommodation campus at Hinkley Point C and BioClad is supplying and installing its antimicrobial internal wall lining for the units to provide a fully hygienic environment for those working on the project. The campuses will have a total of approximately 1,500 en-suite rooms, all featuring BioClad antimicrobial internal wall linings. BioClad wall lining is a cost-effective alternative to tiling and offers superior hygiene through it’s silver-ion technology which kills microbes by 99%.
Sponsored
Stair Core at Battersea Power Station

Stair Core at Battersea Power Station

Cordek Ltd

Cordek were invited to propose a re-useable formwork solution to pre-cast the two spiral staircases within Phase One’s residential block, Circus West. A combination of detailed planning and modern digital methods of manufacture resulted in a cost effective formwork solution which achieved the quality and multiple reuses required from this demanding project.
Sponsored
Battersea Power Station, London

Battersea Power Station, London

Coopers Fire Ltd

Coopers Fire proudly installed multiple fire and smoke curtains in this iconic building in London.Coopers Fire was approached in 2013 to support multiple Architects and Fire Engineers to work through the difficult interface designs on the historic Battersea building that posed multiple challenges in incorporating smoke and fire strategies whilst maintaining the legacy build design.This was a great opportunity to once again put forward the innovative solutions that have attracted Architects to Coopers Fire on many occasions previously.These challenges followed with the introduction of bespoke curtain systems stretching the designs beyond the norm. There was also a need to carry out support testing to validate their capability and to offer comfort to the stakeholders.Coopers Fire offered continual support to the key stakeholders including the Architect and Fire Engineer community, giving them confidence in ongoing collaboration with Coopers Fire for future projects.The Coopers Fire product design and interfacing, complete with valid specifications, went a long way to assist a Contractors partnership decision in supplying and installing the finished product whilst enabling live design changes with the aligned Architect engaged on the project.The project required FireMaster® Concertina curtains 25m width and 12m in height of straight sections, with an integrity rating of 30 minutes.The Coopers Fire Concertina product portfolio allowed for 12m width and 8m height of straight length sections so the product needed re-designing and bespoke engineering to suit the requirements of the project.A specimen of the engineered solution was tested at an accredited fire testing lab. The specimen achieved 66 minutes integrity rating, without failure.The combined engineering design, testing and fire test data allowed Coopers Fire to meet the requirements of supplying a 25m wide and 12m high FireMaster® Open Concertina fire curtain.One major challenge of the large Concertina products was installation. The 12m drop Concertina fire curtains were installed successfully on site using a combination of scaffolding and mobile platforms and at some points with minimal headspace to work within.The Concertinas were so long that onsite redesign and engineering were required to ensure the bottom tray engaged perfectly with the headbox.The Concertina retaining guides were also so long they required onsite welding. A further four levels below the curtain drop, meant that total installation height was higher than 12 metres from the ground spanning over the voids either side of the bridge below.The Coopers Fire production and installation teams collaborated to manufacture the individual parts of the Concertina fabric off site to ensure the programme of installation was kept on time.Coopers Fire installed:47 x Vertical fire curtains7 x Concertina curtains32 x Vertical smoke curtainsThe team used for the Concertina installation specialise in this product and were able to overcome onsite challenges to ensure the huge Concertina fire curtains operated as expected and deployed effectively.
Sponsored
A Powerful Hinge that Combats Anti-Sagging even on Wide Doors

A Powerful Hinge that Combats Anti-Sagging even on Wide Doors

Sugatsune Kogyo UK Ltd

Heavy duty hinge Wash basin SolutionPROBLEMKey IssuesWhen using concealed hinges on wide doors, a several hinges must be used to support the door, otherwise it will sag.Product InformationOne-touch Heavy duty concealed hinge J95— Suitable for heavy doors up to 25 kg (2 hinges) and 40 kg (3 hinges).— Can also be fitted to glass doors by using the optional glass door faceplate.— Easy, one-touch attachment and removal of the door.SOLUTIONThe SolutionThe use of high load-bearing hinges meant that even wide doors could be supported with fewer hinges.Issue of wide door saggingConcealed hinges are essential for opening and closing furniture doors. However, with wide doors, the door will often slope downward, or “sag,” unless many hinges are used. This article will explain how this problem was addressed.What causes the doors to sag in the first place?The following are some of the reasons why a door may sag:— The door is too heavy— The door is too wide— The interval between the hinges is too short— Too few hinges are usedThe common issue with all of these problems is that the hinges cannot support the weight of the door.The Powerful J95 hinge to support even the heaviest doorsThe J95 concealed hinge is an ideal solution for hanging wide doors. This is specifically due to its high load-bearing capacity: 25 kg for 2 hinges and 40 kg for 3 hinges. It is possible to support heavy doors with fewer hinges than with conventional ones.Support 800 mm wide doors with just two hinges!A luxury hotel in Korea used the J95 concealed hinge for the bathroom sink plumbing maintenance door. Due to the 800 mm width of the door, it was necessary to use at least three conventional hinges, but with the J95, only two were needed. Since only two J95 hinges are required, it creates a cleaner and more visually appealing appearance. Additionally, since the same type of maintenance door was needed throughout the hotel, using only two hinges greatly decreased the overall installation time.

Showing 37-72 of 419

Feedback