NBS Source

"duct"

320 results found

Sort by:

Showing 37-49 of 49

Imperial College, London

Imperial College, London

Washroom Washroom Ltd

Washroom’s highly engineered, full height Marcato cubicles provide the perfect solution for a cutting edge research facility at Imperial College in London. With a flush fronted and rebated finish, the division panels and doors of the Marcato cubicle, which were manufactured from 20mm Formica HPL, meet edge to edge for maximum privacy. Two complementing shades of Formica were specified - a sky blue for the cubicle doors, pilasters and Concerto duct panelling and a soft grey as a contrast for the interior division panels. Washroom also designed, manufactured and installed Corian vanity units in a crisp white.
DRU gas fires have pride of place in prestigious Berkeley Homes Belgravia development

DRU gas fires have pride of place in prestigious Berkeley Homes Belgravia development

DRU Fires

DRU has installed 89 gas fires into Ebury Square, a development of luxury 1-4 bedroom apartments and 5 bedroom penthouses by Berkeley Homes in Belgravia, London. The fires were selected for their contemporary design, easy installation and high energy efficiency. They consist of single-sided and double-sided tunnel models. Berkeley Homes selected DRU because of their unique PowerVent® flue system. Due to the configuration of the apartments, the flues had to be extended up to 64 metres throughout the service ducts in the complex, with most of the fires having external PowerVent® terminals on the roof.
Indigo Hotel, Queens Street. Cardiff.

Indigo Hotel, Queens Street. Cardiff.

Flexi Support Systems from Pump House

Products: Flexi light – Flexi Base & Extender frames, Flexi heavy – Ahu Frameworks, Flexi everyday – Duct, pipe and electrical containment. Services: VRF Condensers & Air handling units. Roof build-up: Warm roof design – PIR/PUR insulation with PVC/TPO field membrane. Supplied via a wholesaler in Cardiff, our hot dip galvanised frameworks were supplied in lengths and widths to suit each unit being supported. With all products available from stock, the contractor ordered frameworks in stages, to suit the phased project programme, and eliminated having to find space within an already restricted working environment for everything to be delivered at once.
Bitterne Park School, Southampton.

Bitterne Park School, Southampton.

Flexi Support Systems from Pump House

Products: Flexi Everyday – H Frame Kits and Flexi-Feet, Flexi Light – Base & Extender frames, Flexi heavy – Modular Frameworks & Custom Frame Services: Cable trays, Ducts, A/C Splits & Air-handling units. Roof build-up: Warm roof design – PIR/PUR insulation with PVC/TPO field membrane. An assortment of products was required to support various services such as cable trays, ductwork, condensers and air-handling units. In addition, due to one of the air-handling units being extremely wider than usual, we also had to manufacture a bespoke custom framework for this item.
Maxwood washrooms star in London’s West End development

Maxwood washrooms star in London’s West End development

Maxwood

Stylish commercial washrooms from Maxwood have a starring role in an impressive development in London’s West End. The new building at 55 St James’ Street creates over 23,000 sq ft of Grade A office accommodation, designed to attract a high calibre of tenant. The internal fit-out includes high quality male, female and DDA compliant washrooms, custom-made and installed by Maxwood over seven floors. In keeping with the project’s prestigious specification, the washrooms feature a distinctive cast of luxury materials, from real wood veneer cubicles and decorative glass duct panelling to high performance hardware with an attractive copper-coloured finish.
Kings Cross Underground Station, London

Kings Cross Underground Station, London

Howe Green

Over 60 of Howe Green’s 7500 Series floor access covers were chosen for the development of a sizable extension of King’s Cross tube station. An access solution was required to provide access to essential under floor services including ventilation ducting, electrics, communication cables and rail services. The specification required a solution that would prevent the passage of fire through service channels. Howe Green’s 7500 Series access covers met requirements with a three hour fire rating. In addition to single covers, Howe Green’s innovative multi-part covers were also used.
The Other Place, Stratford-Upon-Avon

The Other Place, Stratford-Upon-Avon

Howe Green

Howe Green access covers were selected for the Royal Shakespeare Company’s studio theatre renovation project ‘The Other Place’, in Stratford-Upon-Avon. The covers were required to provide routine and emergency access to underfloor ducting services throughout the building. Howe Green supplied a number of 7500 Series Medium Duty Floor Access Covers. The access covers are ideal for areas that require heavy loading as they are highly durable. Main contractor, BAM Construction, fitted the panels on a suspended concrete slab. Once installed, they were infilled with K-screed followed by a resin finish.
Underground Station, UK

Underground Station, UK

Howe Green

Howe Green Ltd supplied over 850 specially designed and manufactured floor access covers for an underground station which required safe, secure and easy access to building services concealed beneath the flooring. Howe Green designed bespoke duct covers based on the 7500 Series Medium-Duty Floor Access Covers. With a 69 mm depth the access covers were manufactured with an extra thick base plate and reinforcements to meet the demands of what will be a highly trafficked area. The access covers were infilled with two different types of flooring dependent upon their location - Conservation Smooth pavings from Marshalls and Granazzo.
Torrance Park Golf Club - Scotland

Torrance Park Golf Club - Scotland

Prospec Ltd

Torrance Park Golf Club is set in the beautiful moorland of North Lanarkshire. A bespoke design was required for the lockers due to the unique size requirements of a golf course and our Marathon Wet Glass Lockers achieve this. Manufactured with 10mm Toughened Glass doors and a robust aluminium carcass, the lockers cater perfectly for the members golf equipment without compromising quality or finish. Our award winning Cabrillant cubicles continued the use of glass into the changing facilities in the form of showers. These are complimented by our Marathon System D WC cubicles, duct panelling, vanity units and bench seating
balustrade infill panels, open mesh flooring, stair treads and louvred screening at Milton Park: new workspaces for the science & technology sector

balustrade infill panels, open mesh flooring, stair treads and louvred screening at Milton Park: new workspaces for the science & technology sector

Lang+Fulton

Terra-34 balustrade infill panels, open mesh flooring, stair treads and louvred screening have been supplied for escape stairs at Milton Park. Three new buildings have been tailored to provide high-tech laboratories and offices. There were five stairs towers in total, 10.7m and 15m high, also designed to provide access to service facilities. The Italia-80 louvres effectively screen all the service ducting and were supplied with demountable panels with D-handles for inspection points at each landing and ground level. The result was a smart solution in keeping with the high specification of the development.
St Botolph Building, London

St Botolph Building, London

Thrislington Cubicles

We have installed our stunning full-height Flow cubicles at the St Botolph building in London. A delicate pale wood grain laminate across both the cubicles and the sentry ducting sets off the washrooms beautifully. The washrooms at St Botolph required an upgrade after having the paint on the previously installed cubicles began to chip, and the hardware started to break down. With Thrislington’s market-leading 15 year guarantee for Flow, St Botolph are safe in the knowledge that problems like this will not occur again. All our products are produced in the UK factory using materials designed and tested to perform in the washroom environment.
Scarborough Sports Village

Scarborough Sports Village

Prospec Ltd

Scarborough Sports Village includes Prospec Marathon Classic range throughout, with cantilevered and double island bench seating in matching solid grade laminate. Prospec Marathon wet lockers, which include an aluminium carcass for wet areas, are a mixture of 1, 2, 3, and 4 tiers, and feature our new £1 coin return lock. Other products included within our installation would be our Marathon Classic fully framed cubicles, postformed solid grade laminate vanity units and grooming shelves, and floor to ceiling IPS (duct panel systems). This project also features our Disabled Access lockers which comply with Sport England recommendations.
Retro-Fitted Risers

Retro-Fitted Risers

Step On Safety Ltd

Many of the GRP Riser Floors we install are fitted during the initial build. Using a framework made from GRP profiles, capped with panels of GRP Grating, we fill usually simple shapes as a building goes up, ensuring people and equipment can’t fall down the holes required for services installation.In an older building, the chances are the services are already in place, which means we need to cut around any pipes, cables and ducting to ensure a neat fit with no gaps.Gainsborough House in Richmond was one such installation. The riser gaps were actually quite small so, while there was no risk of a person falling through, dropped tools could, presenting – at worst – a potential hazard to people and equipment below and – at best – an inconvenience as tools need to be retrieved or replaced. We were sub-contracted by Westgreen Construction to bring the spaces around the risers up to the current safety standards and help prevent future accidents.On some floors the gaps were almost full of services trunking and, as an added challenge, electrical cable trays coming forward presented an uneven surface to work on. We built frames between each tray, creating a raised base to fit the grating to. The mesh was then carefully cut to accommodate the various services in place.In other parts of the building the client needed the grating to be 50mm away from already-installed duct work to allow for lagging and requested a kick plate rather than the normal flush fit. This required a modified frame to give the site team something to fix the plate to.GRP is an incredibly flexible material to work with. It’s much lighter than steel equivalents making it relatively easy to manoeuvre into position. It’s also easier to cut and non-sparking so doesn’t require a hot works permit. This allows us to make adjustments onsite, achieving a high level of precision in a fraction of the time, keeping quality up and costs down.No matter what type or age of a building, our expert teams will find a GRP riser solution to ensure site safety. For more information call us on 01206 396 446.

Showing 37-49 of 49

Feedback