NBS Source
I'm a manufacturer

"decking"

3,226 results found

Sort by:

Showing 181-216 of 370

Sponsored
Manchester Airport Terminal 2, England

Manchester Airport Terminal 2, England

BEMO Project Engineering UK Ltd

Over 20,000m² N65/400 stucco embossed aluminium site-rolled to minimise transport requirements. Engineered structural deck to single span 9 metres
Sponsored
Paddington New Yard

Paddington New Yard

Cordek Ltd

Cordek were able to assist in providing a formwork solution for the construction of a new 8000m² elevated bus deck which will connect to Westbourne Park Bus Garage.
Sponsored
Beautiful Hotel Spa with Bespoke Copings & Flooring

Beautiful Hotel Spa with Bespoke Copings & Flooring

Stoneworld Oxfordshire Ltd

This project features a unique look, designed by us with made-to-measure stonework, including deck-level pool copings and integrated spa seating, incorporating inset lighting.
Sponsored
MAPLEFIELDS SCHOOL

MAPLEFIELDS SCHOOL

Tata Steel

With RoofDek as the structural deck, the school’s roofs feature rainwater harvesting, high levels of thermal insulation, natural ventilation, green sedum roofs and solar thermal panels.
Sponsored
iDecking Project - Finchampstead, Berkshire

iDecking Project - Finchampstead, Berkshire

Wallbarn Ltd

This 115m² project was a large luxury new-build. The decking required two distinct build-up methods around the house. One section was on a waterproofing membrane, the other on a steel framed walkway. Adjustable support pedestals were loose-laid onto the membrane. iDecking aluminium rail system was set onto the pedestals and EasyClick boards were clicked into place. Pedestals lifted the decking structure off the membrane allowing free drainage and creating a level surface on the falling roof. Aluminium rails were mechanically fixed to the steel structure and the whole terrace was set to one, seamless level wrapping around the house.
Sponsored
Adjustable Paving Supports - Woodbury Close, Finsbury Park

Adjustable Paving Supports - Woodbury Close, Finsbury Park

Wallbarn Ltd

ASP pedestals were chosen by the waterproofing contractor to suspend paving slabs on residential balconies above an inverted waterproofing system on a luxury development. Decks were laid to falls in many different directions creating different heights and angles. Paving needed to be flat across the falling deck and slabs needed to ballast the insulation. Telescopic stems easily adjust the height whilst the slab is in place, making installation fast and easy. Positioning lugs create uniform paving lines automatically. Heavy load tolerances and durability over time and large temperature ranges, up to Minus 40° C, gives Wallbarn ASPs the edge competitors.
Sponsored
County-Hall

County-Hall

RYNO

County Hall - LondonSystem Used - TerraSmart Aluminium IGNOA hub for businesses, a site of attractions and accommodation, London's iconic County Hall is as stunning on the outside as it is on the inside, made even more beautiful thanks to our TerraSmart Aluminium.In order to create a venue for events, Coronado Property Developments Ltd needed a solution for the huge steel floor installed into the lightwell.A Grade II listed building required a decking solution that would complement the overall aesthetics and cater for the increased load requirements: the design load went from a 2.0kN Concentrated Load and 2.5kN/m2 uniformly distributed load (UDL) (used for areas of residential activities, typically used for balconies) to a 4.0kN concentrated load and 5.0kN/m2 UDL (as an area where people may congregate).TerraSmart Aluminium was selected as the ideal system to meet the client's loading criteria. Aluminium decking is a lightweight system when compared to other paving solutions, but very strong. Coronado Property Developments Ltd were very impressed with the solution provided by RYNO and the work done by Pritchard & Pritchard, who installed the system in both lightwells in the building.The TerraSmart Aluminium system featured the ADB80 Deck Board, selected specifically for its increased top surface thickness, delivering superior durability, ADS50 Aluminium Joists to suit the spans of the steel frame underneath, and RD-FR Non-Combustible Joist Support Pedestals for guaranteed supporting strength.The steel grillage was supplied by another manufacturer and installed around the decking to meet the ventilation requirements of the air-conditioning units below.The County Hall was opened over 100 years ago by King George V and it's great to see our systems in London's most versatile, historic building.
Sponsored
NEW ORKNEY HOSPITAL

NEW ORKNEY HOSPITAL

Tata Steel

The £64m hospital and healthcare facility on the Orkney Islands is a state-of-the-art clinical environment for the delivery of health services, and ComFlor® composite floor decking played a major role in its construction.
Sponsored
Timber Framed Self Build House, St. Albans

Timber Framed Self Build House, St. Albans

CDI Innovative Construction Materials Ltd

This self-build project was looking to improve the quality of the 1st floor construction, eliminate any danger of floor creaking that is common to timber floors and include an efficient underfloor heating solution.Underfloor heating work at its most efficient when it is installed within a screed, this is the way ground floor system are installed and being able to replicate this pipes in screed arrangement upstairs makes sense for the performance of the complete system.Also, by including some stiffened mass to the upper floors, the feel of the floor is replicated from the ground floor and also provides some very useful solar thermal buffering to keep summer temperatures under control in a building technique that otherwise has very little mass to to achieve this, especially on the upper levels.A timber frame structure requires the floor to provide racking to prevent the building from twisting. Meaning the floor needs to be secured to the joists below so the floor can stop twisting. There are 2 ways of installing Lewis Deck in timber frame structures. Firstly is to fix the Lewis Deck down or, alternatively, fix a timber deck on top of the timber joists and the Lewis is then laid loose on top of the timber with the resilient acoustic strips in between , thus, further enhancing the acoustic performance of the floor.
Sponsored
Sinclair Meadows – Zero Carbon Code 6 Housing

Sinclair Meadows – Zero Carbon Code 6 Housing

CDI Innovative Construction Materials Ltd

Providing 21 affordable homes in the first ‘carbon negative’ housing community of its kind in the UK. The initial concept began in 2009 with the aim of creating carbon negative housing. The project is ground breaking with a plan to lock away as much carbon as possible whilst generating excess energy from systems installed.Lewis Deck light weight steel/ screed composite floor system providing acoustic floors improving Building Regulations Part E standards by at least 8dB was installed in the apartments.This project achieved a Zero Carbon certification under the Code for Sustainable Homes and achieved Passiv Haus standards, but was not certified under this system. The performance was monitored by the Technology Strategy Board (TSB) as well as how the social tenants found the experience of living there given the lifestyle adjustments that were needed.The Lewis Deck was used as it achieved the enhanced acoustic and fire performance required in this project, especially given that this was a timber frame development. The elements of the building also had to achieve an A+ Green Guide to Specification rating from the BRE, this was achieved by using a liquid screed on top of the deck that contained a high recycled content.The project won a number of awards and was marketed as the UK's 1st "Carbon Negative" social housing scheme.
Sponsored
Wimbledon No. 1 Court, London

Wimbledon No. 1 Court, London

BEMO Project Engineering UK Ltd

BEMO Flex mass-customised sub-structure with N65/Tapered standing seam panels in PVDF2 RAL6007 and BEMO Deck profile. BEMO provided full engineering support including 3D surveys to eliminate construction tolerances.
Sponsored
Balcony areas

Balcony areas

Evergreens UK Group

Synthetic grass is a good alternative to decking, which can get slippery in the winter and requires regular time-consuming maintenance. Leaving concrete or slabs bare can look uninteresting and can be uncomfortable to sit on during summer evenings.
Sponsored
Balcony areas

Balcony areas

Evergreens UK Group

Synthetic grass is a good alternative to decking, which can get slippery in the winter and requires regular time-consuming maintenance. Leaving concrete or slabs bare can look uninteresting and can be uncomfortable to sit on during summer evenings.
Sponsored
Rhepanol fk coated with decorative copper is the perfect finish for award-winning home

Rhepanol fk coated with decorative copper is the perfect finish for award-winning home

SIG Design & Technology

Moonraker is a luxury residential property drawing on the exploits of James Bond for inspiration. Bournemouth-based Seven Developments’ four-bedroom property, which includes a sunken garden with decked footbridge, is a cocktail of curves based on the shape of a crescent moon.
Sponsored
Natural beauty, easy to maintain and sustainable quality– UPM ProFi Piazza, Californian Oak

Natural beauty, easy to maintain and sustainable quality– UPM ProFi Piazza, Californian Oak

UPM Biocomposites

Natural beauty, easy to maintain and sustainable quality were the key factors for one family’s decking choice – UPM ProFi Piazza, Californian OakSaija and Petri Nylund and their two grown up children were already experienced home builders. As their family situation and needs have changed, they decided to build a new home. Once again they planned a turn-key solution: this time a stylish and modern white house built for them by the contractor Hevi-kivitalot as part of 2020’s Tuusula Housing Fair.Their brief for the design of both exterior and interior living areas of the house was very clear: they wanted to have high quality, ageless materials, with a hint of everyday luxury. Colours should be natural and neutral. The internal and external living areas should be seamlessly joined together.There are three different balconies or outdoor deckings, each with a different function. One balcony opens out from the master bedroom. The second balcony, a rooftop terrace with an outdoor jacuzzi, lies next to the sauna and bathroom. The third and main decking area opens out directly from the kitchen and living room and features a partly glazed area with a dining table. Natural light floods into this perfect merging of the indoor and outdoor living areas.The interior of the house was created by the interior designer Laura Seppänen, who also found the decking material, UPM ProFi Piazza in Californian Oak colour. “We immediately liked the natural look of this material, with its modern woodgrain design and texture. The neutral “Californian Oak” colour also matched well with the pure white colour of the house and the other colour choices we have made elsewhere in our new home.” explained Petri Nylund, father of the family. “I especially appreciate that it is very easy to clean and maintain – only periodically washing is needed”, said his wife Saija Nylund. “It also feels comfortable and safe with bare feet. An additional advantage is that it’s made with a high recycled content – we prefer to choose materials which are also environmentally friendly”, she continues. “In general, we are very pleased with our new home and also all of the outdoor areas”, the couple says together.This summer, the whole Nylund family are enjoying their first summer in their new home, especially the long sunny days and warm evenings in their extended outdoor living room, made with UPM ProFi Piazza decking.
Sponsored
Devonshire House, London

Devonshire House, London

MyDek Ltd

A stunning refit of a listed building overlooking Green ParkDevonshire House is a Grade 2 listed gem residing in Mayfair, and we worked with Bain Capital and TP Bennett Architects and their respective contractors on the refurbishment of the fourth-floor offices and their four expansive external terraces. The challenge was to find a decking solution that was fully compliant with the latest Building Safety Regulations while maintaining the aesthetic of this historic London property.MyDek’s Luxura – an A1 fire-rated composite – was chosen for the project as it seamlessly aligned with the building’s aesthetics while delivering a robust, enduring surface for the upgraded outdoor spaces. The roof terraces had a limited loadbearing capacity that could not accommodate concrete paving and Luxura emerged as the ideal solution, allowing for top quality decking that remained well within structural limits.
Sponsored
Weight saving structural concrete for hotel rooftop extension

Weight saving structural concrete for hotel rooftop extension

Tarmac

The challenge was to construct a roof top extension on top of the luxury hotel NOBU in Shoreditch. The plan was to add an additional 1 storey of hotel rooms, suites, dining areas and open terraces that would replace the existing planted roof. The chosen solution was Tarmac Toplight C lightweight structural concrete in a pump mix with the addition of steel fibres, ensuring maximum weight loss of 35% with no compromise on structural concrete performance.By adding steel fibres into the lightweight mix the composite metal deck system could be installed without the need for traditional expensive and slow steel reinforcement across the deck. The use of lightweight concrete, furthermore, reduced the load by 35% which meant the existing structure did not need to be reinforced or under pinned. The construction programme time was also reduced considerably.
Sponsored
Case Study - Proteus Pro-Felt® - CO-OP Wembley

Case Study - Proteus Pro-Felt® - CO-OP Wembley

Proteus Waterproofing

The existing felt waterproofing and timber deck had failed allowing water ingress into the residential building below. Upon further inspection, Proteus established that the existing roof lacked any insulation and therefore did not meet current Building Regulations.
Sponsored
HMP Pentonville

HMP Pentonville

Bauder Ltd

Completed in 1842, HMP Pentonville has remained in use since opening, experiencing many stages of refurbishment throughout the decades. In 2003, the existing asphalt deck above the kitchens was in need of a complete refit with the building having to remain in use throughout the refurbishment of the roof.
Sponsored
Merry Hill Retail Complex Car Parks

Merry Hill Retail Complex Car Parks

Sika Limited

The Purple and Green MSCPs have capacity for more than 4,000 vehicles across five levels. The project’s scope involved concrete repair, structural strengthening using carbon fibre laminates, the replacement of the conduits, movement joints, drainage channels and deck waterproofing.
Sponsored
Waterproofing experts seal leaky basement

Waterproofing experts seal leaky basement

Triton Systems

Waterproofing and damp proofing specialists, Severn Damp & Timber Preservation, installed a range of Triton Systems’ waterproofing materials to deal with water ingress around two skylights, formed within the concrete roof deck over a basement that extended into the garden of a domestic property. 
Sponsored
CV Pumping

CV Pumping

Anhydritec Ltd

A faster drying screed required over Lewis metal decking system on a first floor. Gyvlon FD, the screed is compatible with the Lewis system and gave the client the re assurance that the 6 week deadline would comfortably be achieved. Floor was dry for floor coverings after 28 days.
Sponsored
Fire Safety Balcony Remediation in Poole, Dorset

Fire Safety Balcony Remediation in Poole, Dorset

AliDeck

The AliDeck System has rapidly become the de facto standard choice for balcony fire safety remediation projects. With our large range of non-combustible aluminium decking boards, joists, and pedestals our products offer practical and cost-effective solutions for any conceivable balcony refurbishment works.
Sponsored
Goldman Sachs

Goldman Sachs

CDM Stravitec

The new Headquarters of Goldman Sachs in London is in a great location on Farringdon Street in the City of London. This massive office development of 1.1 million square feet includes a large auditorium which is isolated to protect it from tube train noise and to protect the rest of the building.Sandy Brown specified that the box-in-box construction needed 10Hz bearings supporting it.Our local branch worked with Byrne Brothers to design supply and install the concrete floating floors and structural bearings. The complicated 3-dimensional space is supported on 5 separate floating floors with bearings beneath designed to take the column loads.The floating floors consist of Stravifloor Deck isolation rails supporting composite metal decking, reinforcement and concrete.Some of the columns are supported on Stravibase SEB bearings located outside of the floating floor areas.The new building has been named the ‘groundscraper’ due to its mammoth size – it will become one of London’s new collection of landmark buildings.
Sponsored
Makeover for a Cedar Clad Garden Office and Gym

Makeover for a Cedar Clad Garden Office and Gym

Owatrol UK Ltd

It never ceases to amaze us what a difference a new finish makes to wood cladding. We have recently had a customer who was in desperate need of a makeover for cedar clad garden office & gym.Roger at R and A Pressure Washing has given us another great case study to show you and we think it’s looking amazing. When the office was installed 2 years previously, the customer had used Seasonite new wood protection to protect and stabilise the new wood. The wood therefore needed a good clean before a finish could be applied, as you can see:Now they wanted to complete the look and were straight back to Owatrol products with the help of Roger!Firstly, he applied Net-TrolBy using this powerful and fast acting wood cleaner and brightener, Roger was able to restore the natural colour of the cedar cladding and decking and clean it quickly and easily. Before starting work, Roger masked off all the areas of the building which he didn’t want to be treated.Net-Trol is non-aggressive and is harmless to plants, so Roger didn’t need to worry about it damaging the grass next to the garden office.Firstly, he wet the cladding and the Southern Yellow Pine decking with fresh, clean water.They then applied Net-Trol with a synthetic roller and then scrubbed the surface with a stiff synthetic brush.After leaving it to stand for around 15 minutes, the customer then scrubbed the surface whilst simultaneously rinsing it with water. You could also use a pressure washer, max. 60 bar.If the surface starts to dry while you’re leaving the Net-Trol to work, simply mist it with some water.If you want, you can repeat the procedure but in this case, the client did not have to.The customer then left the cladding and decking to dry for 48 hours before applying the finish.Next, Aquadecks was appliedA water-based penetrating wood finish that provides advanced UV protection, Aquadecks was the ideal choice to revive and protect this customer’s cladding and decking.One of the great things about Aquadecks is that maintenance is easy, with no sanding or stripping required.Roger applied a liberal amount of Aquadecks. He worked in sections that he could complete within 30 minutes, working in the direction of the grain.After the ‘wet look’ of the first application disappeared, he then applied a second coat of Aquadecks. He then allowed it to penetrate for 15-20 minutes.Roger then wiped away any excess Aquadecks that had not penetrated. This avoided it drying in shiny spots on the surface of the cladding.Aquadecks comes in a variety of colours but in this case the customer chose a Honey tint, which we think looks stunning.By using Net-Trol and Aquadecks, Roger has given his customer’s garden office and gym a makeover that has brought the building and adjacent decking back to life.
Sponsored
AliDeck Lite Board in Eastbourne, East Sussex

AliDeck Lite Board in Eastbourne, East Sussex

AliDeck

AliDeck is extremely pleased to have such great feedback from first-time customer N.S Engineering, who recently completed work on the Macquarie Quay remediation project in Eastbourne, East Sussex, following a recommendation from a recent EWS1 survey that specified non-combustible materials should be used when renewing the balcony decking.
Sponsored
Lateral Bellows for Airport
Expansion

Lateral Bellows for Airport Expansion

FlexEJ

FlexEJ has designed and manufactured lateral expansion joints with Inconel 625 bellows designed to install in existing pre-cast concrete forms.The London City Airport terminal expansion is being built on a concrete deck supported on over 1000 piles. Between the sections of the deck there can be movement and where critical services pass between sections a fully enclosed expansion joint is required.INSTALLATIONDesigning the expansion joints for installation at site into the existing concrete sections was a challenge. FlexEJ designed and supplied installation tooling which allowed the expansion joint to be inserted into the concrete from one side – complete with internal removable pre-extension bars – and then finally seal welded.FURTHER DETAILSIf you are interested in finding out more about our expansion joint design and manufacturing capabilities, or if you have enquiries for utility related projects, please contact our Technical Sales Team on +44 (0) 1384 881188 or send an email to sales@flexej.co.uk.
Sponsored
Triptych Bankside, London

Triptych Bankside, London

MyDek Ltd

Mixed-use urban development with unique shaped balconies and terraces.Designed by London architects Squire and Partners and developed by JTRE, Triptych Bankside is a complete urban quarter situated in an iconic location close to several London landmarks. This, coupled with its striking design, make Triptych Bankside a signature project for MyDek.Triptych Bankside’s unique shaped balconies required careful design, layout and installation guidance. MyDek supplied Class A2 non-combustible aluminium decking for the balconies and terraces, and offered support to the client and contractors throughout the process. The contemporary finish of the decking complements the design of the building and provides a fully non-combustible future-proof solution."Working with MyDek was seamless. We had issues at the time with the changing regulations in terms of non-use of combustible materials, façades and balconies. MyDek were instrumental in helping us develop our proposals and implement the same use of the material across the balconies and terraces." - Nick Chamberlain, Senior Design Manager
Sponsored
The Seed

The Seed

Russwood Ltd

The Seed is a blueprint for sustainable construction. This new build home used next to no concrete, is insulated with recycled paper, was built around a tree and root protection plan, and incorporates a plan for deconstruction and reuse at the end of its life. Our timber products were another key sustainable element that was carefully specified by the architect, and they are used inside and out for cladding, decking and flooring.
Sponsored
BONUS ARENA, HULL

BONUS ARENA, HULL

Tata Steel

1500m2 of RoofDek D100 and D200 structural metal roof decking profiles were used to support the roof system of Hull’s Bonus Arena, a state-of-the art, music and events complex with up to 3,500 concert auditorium capacity that has the flexibility to adapt to a 2,500 all-seated event and 2,000m2 exhibition space plus 800 capacity conference auditorium.
Sponsored
The Boat House, Portsmouth

The Boat House, Portsmouth

New Era Floor Systems Ltd

Situated in Portsmouth Historical Dockyard, the Boathouse was a development that required an acoustic raised batten system for hardwood decking, Oak plank flooring and a plywood substrate for the 1st floor. New Era Cradles were specified to provide a finished floor height range from 74-190mm and was fitted at 400mm centres. This proved a versatile and cost effective way to overcome all the different levels
Sponsored
Ogier

Ogier

Canal Architectural

The architects ORMS of London tasked the team at Canal Architectural to design a commercial helical staircase that was completely unsupported from below. The challenge was to create the right combination of strength as well as achieving simple lines. Without compromising the integrity of the design the upper floor needed to be decked out with architectural steelwork; creating a circular opening strong enough to support the load of the floating staircase.
Sponsored
Spectraplan forms roof terrace at Sandbanks Court in Poole

Spectraplan forms roof terrace at Sandbanks Court in Poole

SIG Design & Technology

A green roof system was selected for this project as the client required a roof that would complement and accommodate the step in levels to follow timber decking lines to the 55m² roof terrace areas. IKO Single Ply’s Spectraplan SM120 light grey single ply waterproofing system was overlaid to the existing roof and newly built sun rooms, ready to receive a green roof system.
Sponsored
TEMPLE MEADS ROOF REFURBISHMENT WORK PROTECTED BY FIREFLY FIRE BARRIER

TEMPLE MEADS ROOF REFURBISHMENT WORK PROTECTED BY FIREFLY FIRE BARRIER

FIREFLY™ TBA

A three year £24 million programme of works to repair and repaint the roof structure to Bristol Temple Meads railway station is featuring the use of the ZEUS Horizontal fire barrier system from FIREFLY™: employed to enclose a series of shallow arch scaffold beams or ‘cassettes’ that span the tracks, thereby protecting the workforce from any potential train fire as they use the access deck above.
Sponsored
The Camp at The Wave

The Camp at The Wave

Gripsure (UK) Ltd

Surf’s up and Gripsure decking is down at The Camp at The Wave in Bristol!Our Classic non-slip boards have been installed at the first inland surfing destination of its kind in the UK. People of all ages and abilities come here to experience the thrill of riding a wave – or at least having a go. There are different lessons and sessions to suit beginners and experts, as well as a range of activities for children.Just metres from the most consistent surf break in the country, The Camp provides overnight accommodation where guests are perfectly placed for dawn patrols or sunset sessions. The 25 luxury safari tents aim to celebrate the simple things in life, offering a place to escape, chillout, connect, sleep and reset.Gripsure recently provided 9,165 linear meters of our Classic boards to be used for boardwalks around the campsite, as well as porch areas outside each tent. It was the second installment of Gripsure decking at The Wave. Previously, our Classic boards were used to create a pier, boardwalks and a viewing terrace at the popular destination, which attracts hundreds of visitors each year."It was a pleasure to work with Gripsure, they did a fantastic job over The Camp. The whole team were unbelieavably helpful - whether it was back office staff or the tea, that did the installation. Would use their services again in a heartbeart" - Jac Griffiths, Customer Experience ManagerThe Wave’s glamping style tents on its campsite sleep eight people and are kitted out with comfortable beds, a kitchenette, private toilet and a large balcony, where guests can relax after a long day of surfing. There are also two fully wheelchair accessible tents.The team at The Wave wanted to use Gripsure decking for this latest project because we share their strong commitment to sustainability. In recent years, Gripsure has taken great steps towards environmental sustainability, from working with sustainable FSC and PEFC-certified timber to reducing waste. We have just taken this a step further by signing up to a commitment of becoming a net zero carbon business."The nature of The Wave is watersports with kids around and people walking through the campsite in wetsuits. We didn't want people slipping over! Everybody has to be safe around the campsite and we're really pleased with how the latest installment of decking is working out. There have been no issues with anything. It looks really good and is completely fit for purpose." - Sam Jones, Accommodation Supervisor.The Wave also has sustainability built into its ethos. Environmentally, the business is continually striving to be resourceful, finding ways to minimise environmental impact.
Sponsored
Mill Conversion to Apartments - AVRO, Manchester.

Mill Conversion to Apartments - AVRO, Manchester.

CDI Innovative Construction Materials Ltd

It’s not everyday you get a phone call from an architect asking for help on a grade 2 listed mill building, but that is what happened to us back in April 2017 when Stephenson Studios contacted us with a problem they were having with floor to ceiling heights on their Brownsfield Mill project in Manchester.Their design criteria was for the existing 75mm thick timber mill boards to be retained and each of the apartments in the building would have these as an exposed ceiling. The idea was to keep the building as rustic and to retain as much of the original look and feel of the listed mill building as possible. Because of this all of the acoustic (Part E.) and fire Building Regs. (Part B.) requirements would have to be installed above the existing floor.The drawings we were sent through identified a floor build up, on top of the mill boards, at nearly 300mm thick. This started with a self levelling compound on top of the mill boards, to level them to, and then a timber on timber solution with a final layer of cement particle board prior to the oak flooring being installed.This thick floor section was causing a problem due to the original oak beams that were in place meaning the floor to ceiling heights weren’t as high as they needed to be. This design was compounded flowing the removal of the bitumen floor covering. When the mill boards were exposed and then levels were taken across each of the floors it was clear that the original design was no longer suitable for the project.With the age of the building some of the mill boards were beyond repair and each of the floors needed levelling up so the use of self levelling compound and a timber/ cement board solution also became a very expensive solution. We were asked if we could come up with a solution that was able to reduce costs and time and also to be able to achieve the required acoustic and fire requirements for this type of conversion project.Our initial thoughts on the project was to use timber ferrings, 100mm wide at 600mm centres, to lay our Lewis Deck system onto. This was reducing the number of ferrings by 50% (these were originally at 400mm centres) and it also removed 4 layers of timber/ cement board as well as the self levelling compound from the project. Following a meeting on site however, and after being able to fully talk to the design team and developer about what the Lewis Deck system can do we agreed that we would look at putting the ferring strips at 1400mm centres with the Lewis Deck being laid across at these centres. Rubber granulate acoustic strips would be installed on top of each of the timbers and mineral wool insulation would then be installed between. This would allow more material to be removed from the project but crucially still hit both the acoustic and fire requirements of the project.A test floor was commissioned, by the acoustic engineer, and built in August 2018 which passed all tests. You can see from the photos below the Lewis Deck laid at 1400mm centres for the middle section of the test with the 15mm thick rubber granulate acoustic strip laid on top of the timber ferrings. These timbers, due to the nature of the mill boards below, had to be installed individually to differing heights.The first full delivery of Lewis Deck arrived on site at the beginning of June 2019 following on from the steel strengthening works that were being carried out on site.The deck was quickly installed across the whole first floor in just a couple of days and the first screed pour was scheduled for the following week. The whole floor was poured using an anhydrite screed in just a few hours.The project continued on and the last main section of floor was poured on 19th December 2019, exactly 6 months after the first of the pours.This grade 2 listed mill building was a great project to work on. One that gave us a lot of challenges to overcome from the outset and one that helped overcome a number of issues that kept dropping up as the remedial works on the building progressed. We are delighted with the final result.Developer: Urban SplashFloor Installer: Trent Construction Services Ltd.

Showing 181-216 of 370

Feedback