NBS Source
I'm a manufacturer

"composite rigid sheets"

9,859 results found

Sort by:

Showing 145-180 of 432

Sponsored
Edinburgh College

Edinburgh College

Forbo Flooring Systems

For the refurbishment of Edinburgh College’s busiest campus, its FM team called upon Forbo Flooring Systems’ Modul’up adhesive free sheet vinyl for its unique ability to be installed quickly and easily, while reducing downtime and disruption to day-to-day college life – as the floor covering could be walked on immediately after installation.
Sponsored
Washroom solution for Fastlight Ltd

Washroom solution for Fastlight Ltd

KWC DVS Limited

Fastlight Direct have undergone a refurbishment of their washrooms and chose Franke Water Systems as one of the chosen washroom manufacturers. Products provided included:2 x ANMW411 single Quadro Miranit Washbasins1 x ANMW421 double Quadro Miranit Washbasin 4 x F3SV1001 self-closing tapsMaintaining a high standard of hygiene is a key element to consider when specifying any washroom project. Franke’s Miranit composite wash basins are seamlessly moulded in Miranit, an advanced resin and granite composite material with a gelcoat layer, providing a non-porous, robust and hygienic finish. Miranit is several times stronger than ceramic, highly impact-resistant and virtually shatter-proof, making it ideal for busy washroom environments. The F3S self-closing taps are perfect for reducing water consumption with its proven piston-free self-closing water control. These highly durable self-closing F3 taps have been tried and tested over a million times, ensuring a long-lasting solution. The push cap is light and easy to use, with adjustable flow stop time for a one push operation.
Sponsored
Leicester Southern Fire Station

Leicester Southern Fire Station

HD Sharman Ltd.

Upon inspection of this property, Sharmans found the existing gutters corroded and extensive cut edge corrosion to the existing roof sheets. Delamination of the existing roof coating was also present so Sharmans recommended a full gutter and roof refurbishment using the Plygene Gutterline system, Seamsil for cut edge corrosion and the Delcote architectural roof coating system.
Sponsored
cGMP Advanced Manufacturing Area for Orthoplastics

cGMP Advanced Manufacturing Area for Orthoplastics

Norwood Group Limited

PROJECT OVERVIEWOrthoplastics is a global leader in the development and manufacture of orthopaedic implants and components, helping surgeons transform lives around the world. This project, the first phase of a fit out programme for a new facility in Bacup, Lancashire, involved the delivery a new cGMP advanced manufacturing area for the production of Ultra High Molecular Weight Polyethylene (UHMWPE) sheets used in the manufacture of orthopaedic implants. The requirement was for a production area that can provide a controlled environment, isolated from the rest of the floorplate, during processing periods, while enabling access by a remote controlled mobile crane to remove the completed UHMWPE sheets when the equipment is non-operational.PROJECT SPECThe new Orthoplastics building is a single storey facility and the size and weight of the UHMWPE equipment required excavation of additional space below ground to accommodate both the machine and the building services required to process materials at up to 2400C. The 1000m2 processing area needs to be a cleanable cGMP compliant environment to avoid the risk of contaminants in materials that will be used in orthopaedic surgery. The partitioning for the perimeter is 11m tall and connected to the ceiling of the existing building shell. To provide the structural stability required for such tall walls, the standard Norwood 100mm Mediline partition thickness has been increased to 200mm. The project also included rapid rise doors for access by the remote control crane that removes the large UHMWPE sheets following the process. The fully demountable double skin bi-panel system enabled a fast and robust installation enabling the project to get back on track quickly following interruption by the pandemic. The panels were prefabricated in-house by Norwood, enabling a fast-track installation programme.Norwood was also designed, manufactured and installed a range of their single and double steel doors in blue.
Sponsored
Gaudet Luce washroom renovation

Gaudet Luce washroom renovation

Dart Valley Systems Ltd

The award-winning Worcestershire Golf Club, Gaudet Luce Golf and Leisure Complex has recently undergone an upgrade of their washrooms. The revamp was completed by Inspired Washrooms, a Nottinghamshire based fit-out company who Franke Water Systems have worked with on numerous projects. We were thrilled to be chosen to supply over 20 washroom products for the project which included composite wash basins, accessories, taps, cisterns and more.  
Sponsored
Middlewich Environmental Hub

Middlewich Environmental Hub

Brett Martin Daylight Systems

1,000m of red and blue double skin FAIRs (factory assembled insulating rooflights) provide an even and diffused daylight spread in Middlewich environmental hub in Cheshire. The hub operates as a multi-use site and the angled composite panels were fitted to a recycling centre as well as a vehicle workshop. The FAIRs were manufactured to to meet the specific light transmission requirements stipulated by the customer and specified to meet insulation fire and safety requirements.
Sponsored
Moto Services, Rugby

Moto Services, Rugby

BEMO Project Engineering UK Ltd

Over 2,000m² of BEMO N65/400 in stucco embossed aluminium was supplied on the new motorway services for the M6 near Rugby. Lengths of over 60 metres required the panels to be site rolled at eaves height, while the envelope took advantage of the non-metallic GFK halter to ensure resistance to the friction forces associated with thermal movement of long roof sheets.
Sponsored
Spectraplan chosen for green sedum roof at British Horse Society

Spectraplan chosen for green sedum roof at British Horse Society

SIG Design & Technology

The British Horse Society headquarters is on a listed deer park with many protected trees. The building’s circular design posed key construction challenges. The single storey office building was constructed in a doughnut shape, to ensure that a mature oak tree on site was preserved. In keeping with its green surroundings Spectraplan SM120 Dark Grey, a polyester reinforced TPE waterproofing system was mechanically fixed to a composite metal deck, ready to receive a sedum blanket.
Sponsored
Copper Building, Bristol

Copper Building, Bristol

Velfac Windows

The award winning Copper Building, designed by Ferguson Mann Architects, adds 136 new apartments to Bristol’s Lakeshore scheme, an ambitious regeneration project by Urban Splash. The distinctive, copper-clad four-storey building is a thoughtful solution to higher-density living, underpinned by sustainable building performance. Generous glazing is a key feature of the project, with VELFAC triple glazed slim-framed composite windows bringing extra light into apartments and communal spaces.
Sponsored
University of St Andrews, Scotland

University of St Andrews, Scotland

Velfac Windows

The VELFAC composite system has been installed in two award-winning student halls built for the University of St Andrews. Designed by HLM Architects, Powell and Whitehorn Halls provide comfortable and stylish accommodation for over 380 undergraduates and postgraduates, with VELFAC windows providing excellent thermal insulation and maximum natural light. VELFAC units are also integral to innovative architectural façade features, including dramatic glazed screens and angled window pods.
Sponsored
Three flat roofs at a learning village that were beyond serviceable have had their roof surface and insulation refurbished

Three flat roofs at a learning village that were beyond serviceable have had their roof surface and insulation refurbished

IKO PLC

Three flat roofs that were beyond serviceable have had their roof surface and insulation refurbished with a tapered scheme in order to eliminate water pooling which was a consistent problem. A combination of IKO Mach One and IKO Superflex T-O Cap Sheets were installed along with new insulation boards to complete a full tapered scheme to shed persistent standing water.
Sponsored
George Abbot School

George Abbot School

Bauder Ltd

George Abbott SchoolBauder Thermofol single ply waterproofing system with Bauder Euroglaze rooflightsSynopsisLocated in Guildford, George Abbot School is a secondary education school which provides education for 2000 people aged 11 to 18. The school had a history of leaks in the DT rooms above which a profiled sheet metal roof was installed.Following many attempted repairs, Bauder was commissioned to carry out a roof survey on the 228m² profiled sheet metal roof. The report identified issues with not only the gutter area, which was originally believed to be the problematic area, but also with the adjoining profiled roof and also with the large rooflight unit.Bauder Building BoardProject: George Abbott SchoolLocation: Guildford, SurreyRoof Area: 228m²Specifier: Baily GarnerApproved Contractor: Inspire Contract ServicesThe specification Bauder submitted a proposal to refurbish all areas of the failing roof:The gutter area needing standing water to be removed for which Bauder tapered insulation was proposed to create effective drainage falls.The adjoining profiled sheet metal roof requiring a new waterproofing system. The Bauder Profiled Roof Overlay system was determined to be the best solution, using bespoke profiled insulation boards specifically designed to fit the shape of the roof. The Thermofol U15 Fleece Back membrane was then specified as the waterproofing layer providing a robust yet lightweight waterproofing system to the roof.The existing rooflight unit, being one of the problematic areas of the rooftop, was also replaced with Bauder Euroglaze rooflights. Products appliedInsulation infill systemIntended for refurbishing profiled sheet metal roofs or increasing the thermal performance of existing insulated cladding systems.Bauder Euroglaze rooflightsModular rooflight designed to provide high standards of illumination, insulation and ventilation to the interior of flat roofed buildings. These are made to order and the size can therefore be tailor made to fit any roof aperture. The resultBauder approved contractor, Inspire Contracts, installed the roof system and rooflights. Bauder’s expert site technicians carried out over 10 site visits during the 4 months of works on the site. Following a final site visit and a leak test Bauder was able to issue a 20 year product and workmanship guarantee to the client.The choice to use Bauder, a single source of manufacturing for the roof systems and the rooflight, proved beneficial as it enabled Bauder’s flat roof technician team to design out a number of the detailing issues responsible for the historic leak problems and it also eased the installation process for the client and the approved contractor, as Bauder provided its integral service from the roof survey to the final site visit and the issue of the guarantee.System installed Bauder Thermofol PVC single ply waterproofing system 1 Bauder THERMOFOL U15 FRA 1.5mm thick, reinforced PVC waterproofing membrane. Stated within BBA certificate 06/4354, the Thermofol PVC waterproofing membranes have a service life in excess of 35 years. 2 Bauder PIR MTissue-faced flat board insulation, benefitting from a zero ODP and a Green guide rating of ‘A’.3 DeckProfiled sheet metal
Sponsored
Heron Tower, London

Heron Tower, London

FOAMGLAS®

FOAMGLAS® READY BOARD T4+Design Architects: Kohn, Pedersen, Fox Associates – KPF London, Marcus BlanesMain contractor: SkansaConstruction: 2011Application: Compact Roof - FOAMGLAS® Ready Board T4+Finish: Umicore VM ZincThe roof level 41 of the Heron Tower (with a height of 120m) is designed to the most exacting standards for sustainability and efficiency.The building received the BREEAM rating of 'Excellent', with FOAMGLAS® thermal insulation being part of a green and energy efficient building. The roof is composed with FOAMGLAS® READY BOARD insulation and Umicore VM Zinc roofing as a durable finish.FOAMGLAS® insulation has the ability to withstand high structural loads and has developed a special fixing system for metal roofing.Square metal fixing plates are inserted into the upper surface of the insulation and covered with a waterproofing and a separation sheet.This is the perfect system to fully support metal standing seam roofing which is screwed to the metal plates without thermal bridging between the metal roof sheet and the building structure.
Sponsored
Vantage® MF - Crosslane Friars Road

Vantage® MF - Crosslane Friars Road

BTS Fabrications Limited

BTS Facades and Fabrications have a long history of student accommodation schemes with Metclad and RG Group This particular project is Friars Road in CoventryThe consists of 3 towers with the highest being 20 storeyAll in all, high specification student accommodation scheme with a total 604 beds.The facade is A2 fire rated ACM from 3A Composites with a great choice of contrasting colours using our newly CWCT tested Vantage® MF rainscreen
Sponsored
Gulf Bank Headquaters, Algeria - Pyroguard Protect

Gulf Bank Headquaters, Algeria - Pyroguard Protect

Pyroguard UK Ltd

Seveme’s expertise in metal structure works combined with Pyroguard’s multi-functional range of toughened fire safety glass, Pyroguard Protect, enabled the build of the new Algeria Gulf Bank headquarters. Through the informed specification of additional counterpanes, the curtain wall of this futuristic building was able to achieve an EI120 fire rating, as well as effective solar control. Meanwhile in the internal lobby, where safety and style were key, a unique composition that combined both requirements was used.
Sponsored
IKO Polimar CRS used for Trimpley Water Treatment

IKO Polimar CRS used for Trimpley Water Treatment

IKO PLC

The IKO Cladding Refurbishment System (CRS) was chosen, extending the life expectancy of the roofs with a 10 year guarantee from IKO PLC. The existing coating was de-bonding from the plastisol sheets with bare metal showing in places, signs of water damage prior to rusting. Sections of ridge flashings had worked their way loose and were missing from several locations on three of the roofs
Sponsored
Old Students’ Union Receives Fire Protected Roof

Old Students’ Union Receives Fire Protected Roof

IKO PLC

IKO Ultra Prevent T-O Brown cap sheet was specified for the 300m2 flat roof areas, and Armourglass Dual Brown Roofing Shingles were specified for the 200m2 pitched roofs. The roofing shingles were chosen to maintain the original slate effect on the pitched roof areas. The work also involved re-lining of existing steel gutters and improving the thermal performance of the whole roof.
Sponsored
Battersea Reach

Battersea Reach

Buzon UK Ltd

Battersea Reach, an award-winning development consists of 1,350 apartments spread over 14 separate buildings surrounded by beautiful landscaped gardens, shops and cafes. Buzon UK supplied and installed the DPH pedestal range for the composite decking and paving to many of the terraces and balconies across the 14 separate apartment buildings. The DPH pedestal system is perfect for use at roof level as they allow for 5% slope correction and can accommodate a range of services beneath floor level as well as giving excellent drainage.
Sponsored
White City Place, London

White City Place, London

The Outdoor Deck Company Ltd

Sitting opposite the former BBC Television Centre and adjacent to Westfield Shopping Centre, this exciting new development includes 10.4 acres of open space in the form of a new public park for White City, 1500 new homes including affordable housing and commercial premises. The Outdoor Deck Company were specified to install FSC Iroko timber tiered seating to create an external relaxation area on the Buzon pedestal system along with composite seating and stage decks across the external public areas.
Sponsored
Faraday House - London

Faraday House - London

Duco Ventilation & Sun Control NV

The eight storey building Faraday House in London is clad in hand-finished copper alloy, reflecting warm light into the spaces around it. But uncontrolled and excessive sunlight can seriously disrupt the experience of comfort. For this reason, the architect opted for structural solar shading. The DucoSlide panels ensure a drop in the average indoor temperature of up to 12% to combat overheating.The Faraday House in London is a  building with imagination; offering a dazzling composition from the Victorian Railway Bridge. The apartments are part of Circus West Village, the first phase of the Battersea Power Station redevelopment.Full height windows frame views of the River Thames and landscaped courtyard, enhancing the feeling of space and light, whilst private terrace balconies and roof-top gardens provide outdoor space.The eight storey building is clad in hand-finished copper alloy, reflecting warm light into the spaces around it. But uncontrolled and excessive sunlight can seriously disrupt the experience of comfort. For this reason, the architect opted for structural solar shading. The DucoSlide panels ensure a drop in the average indoor temperature of up to 12% to combat overheating. The perforated screens animate the façade and provide home owners with additional solar and acoustic control.The result? A better quality of life for residents and a striking composition for visitors as they travel into London Victoria station.
Sponsored
11 Freebournes Road

11 Freebournes Road

Bauder Ltd

11 Freebournes RoadBauder reinforced bituminous waterproofing system with BauderSOLAR FSynopsisA large derelict warehouse located in Witham has undergone major renovation to transform it into a storage centre for Essex County Council that will assist its services and benefit the local community. The refurbishment works were designed and project managed by Lambert Smith Hampton on behalf of the client, who wanted the building to act as a benchmark for sustainability with the roof playing an integral part in achieving this through the addition of solar panels.Bauder Building BoardProject Name:11 Freebournes RoadLocation:Witham, EssexRoof Size:5,200m²Client:Essex County CouncilProject Manager:Lambert Smith HamptonApproved Contractor:Acclaim ContractsPV Installer:CJ SolarEnvironmental focus:Solar PVThe specificationWorking closely with the client, Bauder performed a comprehensive roof evaluation survey to identify the full extent of water ingress being experienced and to confirm the suitability of adding solar. The bespoke survey report highlighted that the roof needed to be stripped back to its original deck, before being waterproofed with over 5,200m2 of Bauder’s reinforced bitumen system by Acclaim Contracts. 588 solar PV modules were then fitted onto the roof by electrical installer CJ Solar, enabling the client to generate at least 134.70 Megawatt Hours of solar power each year. Products appliedBauderSOLAR FIntegrated photovoltaic system, where the modules and the substructure are combined to form a single unit, which is secured to the roof without any penetration of the waterproofing or roof deck. System installedReinforced Bitumen Membrane System1 Reinforced bitumen membraneTorch applied, elastomeric bitumen capping sheet2 BauderPIR M 60Rigid urethane foam insulation faced on both sides with aluminium foil.3 BauderPIR FA-TETorch applied air and vapour control layerAdvocacyJulian Sanchez, Commissioning Delivery Manager for Essex County Council: “We actively look for opportunities to implement renewable energy and knew that this storage facility lent itself well to PV retrofit. Our system selection process involved the due diligence you would expect from a local authority and we decided to go with Bauder because of its comprehensive system portfolio that meant we could have a single source supply and all-inclusive guarantee; giving us complete confidence in the roof’s performance.”
Sponsored
Marco Pierre White Steak House

Marco Pierre White Steak House

Be-Plas Hygienic Walls & Ceilings Ltd

The Cube in Birmingham city centre is home to The Marco Pierre White Steakhouse Bar & Grill which offers it’s customers an ultra modern 25th floor dining experience. Beplas played their part by supplying contemporary colours from their Elite Komadur PVC Sheets which still provide the ultimate in food hygiene for the kitchen. Beplas’s ethos of sensible prices goes hand in hand with the group’s affordable luxury.
Sponsored
Pengwern Farm

Pengwern Farm

Eternit

Pengwern Farm, in Denbighshire, North Wales, run by Huw in partnership with his mother, has 400 milking cows and 200 followers, on 500 acres. High yielders are housed all year round and the whole herd is calved between July and January.Huw decided to use Profile 6 fibre cement sheets on the new shed to help keep moisture levels to a minimum and ensure a good, dry atmosphere.
Sponsored
Power Solutions, Wijnegem - Solar Shading

Power Solutions, Wijnegem - Solar Shading

Duco Ventilation & Sun Control NV

There was a requirement to cut down directly incident sunlight, the idea came up to work with DucoSun Wing in front of the façade. These large, wing-shaped louvre blades were made of a black perforated sheet that was made in special non-standard sizes for this project. This system therefore works as solar shading on the one hand as well as fulfilling an architectural function on the other, which is a defining factor in the architectural appearance of the office building.
Sponsored
Glan Clwyd Hospital

Glan Clwyd Hospital

Forbo Flooring Systems

Calming colours and patterns have helped to create a special environment for mothers and babies at Glan Clwyd Hospital. Forbo Flooring Systems’ Sphera Element vinyl collection was specified throughout the Mother and Baby Unit, due to its bright and fresh appearance, high-performance and durability. Easy to work with, the Sphera sheets were laid throughout the unit and hand cut to shape to create a beautiful butterfly designs.
Sponsored
Princesshay Shopping Centre, Exeter

Princesshay Shopping Centre, Exeter

Sika Sarnafil

The £230m Princesshay Shopping Centre, in Exeter, officially opened to the public in September 2007, as part of the city’s biggest ever regeneration project, with over 70 shops, cafés and restaurants. The roof of the centre, installed when the building was constructed, had caused various problems throughout its life. A Sarnabar system in Lead Grey was chosen, with a T fleece between the composite deck and the mechanically fastened Sarnafil S327-18EL membrane. On a smaller roof with a plywood deck, Sarnafil G410-ELF, an adhered system with a fleece backing, was specified.
Sponsored
Base, Manchester Science Park

Base, Manchester Science Park

Taylor Maxwell

Located at Manchester Science Park, Base is Manchester’s newest tech and advanced materials green hub, purpose built for businesses working in Industry 4.0 and for those looking to develop the future talent of the science and tech sector.Taylor Maxwell worked closely with main contractors Caddick Construction, to specify and supply the Corium brick cladding used across the facade. The BBA certified cladding system, manufactured by Wienerberger, was installed directly onto Rainspan composite panels which helped to reduce installation time on site.
Sponsored
Power Grab ‘n’ Bond for Installing External Showroom Signage Without Mechanical Fixings

Power Grab ‘n’ Bond for Installing External Showroom Signage Without Mechanical Fixings

C-TEC

Case Study – Power Grab ‘n’ Bond Customer: Signal Signs – OmaghProject: Pat Kirk Car Showroom, Strabane Power Grab ‘n’ Bond Eliminates the Need for Mechanical Fixings!Mechanical fixings on bright, new external facades can be ugly and distracting, especially when being installed at the entrance of Pat Kirk Motors stunning new car showroom in Strabane, Northern Ireland.With clean lines and seamless transitions throughout the building, mechanical fixings where exactly what the architect DID NOT want. This was the challenge presented to Michael from specialist installers McLaughlin Joinery who were tasked with fabricating the entrance and installing the façade design created by Signal Signs on extra-large 1500x3000mm sheets of Dibond® aluminium composite metal panels. A Stickler for Quality!Being a real stickler for quality and perfection Michael McLaughlin believes in always using the best materials, tools and brands to ensure the best, most durable and superior finish on his projects. He immediately sourced Power Grab ‘n’ Bond as he knew it is the best construction adhesive in the market, with excellent initial grab and exceptional tensile and sheer strength. Guaranteed to adhere to metal, wood and concrete substrates it totally eliminates the need for additional mechanical fixings. Power Grab ‘n’ Bond is developed by leading British manufacturers CT1, the No1 sealant and adhesive in the UK. CT1 is always leading and providing the industry with the very latest technology. Now thanks to its unique ‘Tribrid®’ technology Power Grab ‘n’ Bond is a revolutionary product in the field of heavy-duty versatile bonding. Why Choose Power Grab ‘n’ Bond?Working with large Dibond® metal 1500x3000mm panels being installed at height in an external environment Michael and his team needed a solution that would grab, hold and act instantly without needing to be braced and supported. With incredible initial grab, Power Grab ‘n’ Bond is a fast curing, non-shrinking and almost odourless adhesive that held the metal sheets with immediate effect.Three times stronger than regular hybrid polymers, the ‘Tribrid®’ technology in Power Grab n Bond ensures a phenomenal final tensile strength of 22kg/cm2, yet remains flexible, won’t dry out nor become brittle and will work effectively in temperatures ranging from 90°C right down to the Baltic cold -40°C.In fact, not only does Power Grab ‘n’ Bond successfully stick Dibond® to wood and concrete it will adhere to all metals (including lead), stone, granite, ytong, marble, MDF, fiberglass, glass, polystyrene, mirrors and most plastics (except PP, PE and PTFE).Creating a Superior Mechanical Fixing Free FinishUsing a heavy-duty caulking gun, Michael applied Power Grab ‘n’ Bond straight from the cartridge, onto the back of the Dibond® Sheets, allowing it to rest for 4-5minutes to begin activating, before fixing them directly into place.Originally created for facades and heavy stonework such as the installation of quoins, the versatility, strength and reliability of Power Grab ‘n’ Bond means it now used more widely by professional shop fit out companies as well as specialist trades, landscapers, kitchen fitters and bathroom installers. It is tested by a UKAS Accredited lab to BS EN 12003 (Determination of shear adhesion strength of reaction resin adhesives) and BS EN1308 (Determination of slip resistance).Power Grab ‘n’ Bond provided the perfect solution as it’s the ultimate grab adhesive, eliminating the use of mechanical fixings completely and coupled with the rapid curing characteristics saved a lot of additional labour time and cost.Michael said;“The result is exactly what the architect and client wanted, a stunning external façade, with no unattractive mechanical fixings, that not only makes a statement entrance but creates a stunning backdrop for promo photos of new cars too.”Grab also ‘n’ Bond is made in Britain with British technology and British design. Its available now in all good builders’ merchants nationwide and online from www.ct1.comCT1 often copied never equalled!We Innovate – Not Imitate!
Sponsored
School Heating Renovation

School Heating Renovation

Kompozit'All UK

application area: commercial gas heatinguse type: condensing gas boilersproject scope: line commercial freestanding chimney for condensing operationadded value: corrosion-resistant, air-tight and waterproof finishBackgroundThe combustion gases from the school's boiler room are exhausted through a freestanding 28-metre brick chimney. The structure was not suitable for the wet operation of condensing boilers. FuranFlex-25 Black was the chosen lining material.The new boiler plant required a 500mm diameter flue liner but the chimney could not accommodate a rigid liner this size. A FuranFlex25 Black liner was therefore specified as it expands into the rectangular flue shape when inflated with steam.Statement of workFuranFlex25 comes as a folded and soft tube. Inflating with steam irreversably hardens the liner fixing it in place. Within a few hours of steaming the liner was ready for connecting to the boilers. The appropriate adaptors/terminals were fitted making the chimney ready for operation.
Sponsored
Asbestos Roof Coating With BBA Approved Asbestoseal

Asbestos Roof Coating With BBA Approved Asbestoseal

Liquasil Ltd

A DOFF steam cleaner was used to thoroughly clean the moss and lichen from this asbestos roof in Bridgwater. The metal fixings were treated with Liquasil's rust tolerant primer and then sealed, along with cracked sheets, using Non-Sag Sealer, before the whole roof was coated using Asbestoseal 20. The end result was a leak-free asbestos roof that will last for many more years. Asbestoseal is the only BBA Approved coating system for asbestos roofs.
Sponsored
Barrisol Light® - Great Ormond Street Hospital - United Kingdom

Barrisol Light® - Great Ormond Street Hospital - United Kingdom

Barrisol

Barrisol® is improving the look of Great Ormond Street Childrens Hospital in London, England. The cafeteria is transformed into a magical and friendly place. Designed by the architect Llewelyn Davies Yeang, who took inspiration from the Disney universe, the ceiling is a Barrisol® translucent Blanc Venus along with the Barrisol® Lumiere Color® technology. Using the fabrics this way, coloured bands (translucent sheets) soften the atmosphere and bring the benefits of the chromotherapy.
Sponsored
SSE Hydro Arena, Glasgow

SSE Hydro Arena, Glasgow

Kalzip Ltd

Elliptical on plan and angled in profile, The SSE Hydro’s domed roof required over 12,750 sqm of naturally curved tapered Kalzip® sheets in lengths of up to 25 metres installed in six concentric, almost circular bands. The façade of this amphitheatre-inspired building is 15 metres high at the rear rising to 33 metres at the south-facing front elevation with the central apex of the roof being 45 metres above ground level.
Sponsored
PEMC, Nottingham

PEMC, Nottingham

Sotech Ltd

Optima FC in 3.0mm PPC Aluminium 1050 grade has been used in the completion on The Power Electronics, Machines and Control (PEMC) Research Group on Nottingham University's Jubilee Campus.Home to three purpose-built labs – High Power, Power Electronics, and Drives – the building was built after PEMC secured investment of £18million, including £1.5m from the Wolfson Foundation and £4m from Propulsion Futures.The 5,400m² development is internationally renowned and one of the largest on its field.FEA analysis was carried out by Sotech as non-standard sheets were used due to the sheer size of some panels. The purpose was to ensure enough stiffening resistance had been built into the sheets, to ensure the larger panels were safe and compliant.The project was completed during the first lockdown (due to Covid 19) meaning operations were paused during the project. Sotech and Deane Roofing worked closely together to keep as tightly as possible to the original timeline.Josh Stevens, Estimator at Sotech said: “This was my first project working with Deane Roofing, which was an absolute pleasure. The project ran smoothly from start to finish, and I think the end product looks fantastic.”
Sponsored
Intensive Care Unit, Harrogate District Hospital

Intensive Care Unit, Harrogate District Hospital

Altro

Calm and non-clinical environment for busy ICUChallengeHospital environments are created to heal; yet supporting both physical and mental health needs in clinical environments can be challenging. The Intensive Care Unit (ICU) at Harrogate District Hospital required a refurbishment to its walls and wanted a non-clinical design, but with hygienic properties. Approach The unit had different areas with different functions – it needed to have hygienic, clean, wipe down walls which were also robust and could withstand bumps and scuffs. In the midst of the COVID-19 pandemic, the refurbishment needed to be completed quickly with minimum downtime to ICU. The team also wanted the unit to have a non-clinical feel. Solution Altro Whiterock White, Altro Whiterock Chameleon, and Altro Whiterock Digiclad (Custom) were selected for the walls in the ICU. The hospital’s paediatric unit had Altro hygienic wall sheets installed previously and knew they were robust and trusted products. The ICU staff and project design team took time to select artwork of cherry blossom branches that would be cheerful yet calming for patients, as well as inspiring and uplifting for hardworking staff. The images were printed to create the Altro Whiterock Digiclad (Custom) wall sheets.
Sponsored
Google HQ King's Cross

Google HQ King's Cross

Buzon UK Ltd

The current Google HQ, with vast external floor space over several levels. The decking is a bespoke solid section 230 x 30mm composite, commissioned for this site. All fixings are hidden, giving a seamless look to the terraces, and clean lines. The main terrace areas are level and by using the DPH slope correction system, the wheelchair access ramps were easily achieved. A clever feature; the BM Unit travels over the decking, hiding the steel rails below. This enlarges the overall usable terrace space considerably, and gives uninterrupted views from the entire terrace.
Sponsored
Prestigious international venue uses Franke for washroom redevelopment

Prestigious international venue uses Franke for washroom redevelopment

KWC DVS Limited

Franke Water Systems were thrilled to be chosen to provide the complete range of sanitaryware to the Kia Oval at Kennington for their redevelopment project. Products such as their composite Miranit washtroughs, stainless steel urinals, washbasins and WC’s plus complementing grab rails were all part of the installation. Martin Cosgrove from Mectric Solutions commented “Product quality was a huge factor in deciding on which supplier to choose for such a prestigious project and with a brand name like Franke, we knew we would get the best quality that would last for years to come, and still look good too!"

Showing 145-180 of 432

Feedback