NBS Source
I'm a manufacturer

"brick slip"

1,201 results found

Sort by:

Showing 145-157 of 157

Sponsored
P+HS Architects specifies Vandersanden for modern aesthetic at new North London care home

P+HS Architects specifies Vandersanden for modern aesthetic at new North London care home

Vandersanden Brick

Hammerson House is a large, new, innovative care home in the Hampstead Garden Suburb area of London that “will set a new standard of care for the future”, according to its owners, Nightingale Hammerson. The design reflects a luxurious hotel aesthetic rather than that of a traditional care home facility with the development featuring Ledbury hand-formed, facing bricks from Vandersanden. Renowned for their high quality, crafted appearance and texture, these multi-coloured bricks both accentuate the building’s contemporary look and also bring an attractive, natural softness to its facade.Nightingale Hammerson has served the Jewish community for over 180 years as a leading specialist in residential, nursing and palliative care. Located on Bishops Avenue and completed in Spring 2021, the Charity’s Hammerson House development offers 116 bedrooms in a modern, forward-thinking scheme. The building is balanced by two matching wings at its front and rear, with the design centred around the principles of ‘households’. This involves clusters of bedrooms for residents with supporting facilities on a domestic scale, allowing them to socialise in small groups, but then move easily to larger spaces for group activities, if they wish.The setting for Hammerson House is certainly more rural than urban, withdrawn from the avenue, in beautifully landscaped gardens, surrounded by trees. The design takes full advantage of this verdant context with the shape of the building, offering expansive views of the trees and gardens through large, rectangular glazing at multiple points.P+HS Architects developed the design from RIBA Stage 3 and specified the use of Vandersanden’s Ledbury brick, with its varied tones and texture, to ensure that Hammerson House embodies the look and feel of a luxurious hotel that fits naturally within these surroundings.“We developed a series of palette options which reflected a varied response to the client’s vision,” says Cath Lake, Director at P+HS Architects. “The softer, more rustic approach offered by the Ledbury brick, ultimately, became the client’s preferred option. As a practice, we are focused on creating positive environments for long and short-term support and care and Hammerson House will do just that. Vandersanden’s Ledbury brick has enabled us to meet the distinctive, high quality design vision within budget and the client is delighted with the result.”Ledbury is a high quality, multi-coloured brick with a sand-coated and creased structure. The base yellow colour of the brick is augmented by hues of brown, white, blue and anthracite which help to soften the Hammerson House facade as well as the covered accessible walkway at the building’s entrance. The overall effect is to sit the building comfortably, attractively and organically within its environment.To find out more about the bricks used in this project or to see the wide range of high-quality bricks available from Vandersanden, click on the 'View more' link .
Sponsored
Viking House, Lincoln using Ibstock's Mechslip - mechanically fixed cladding system

Viking House, Lincoln using Ibstock's Mechslip - mechanically fixed cladding system

Ibstock Brick Ltd

Durability, safety and aesthetics needed to work together for the Viking House project. With the refurbishment nestled among conventionally built brick buildings there was a need for a contemporary look that mirrored the local vernacular. Viking House, a managed student accommodation at the University of Lincoln made up of three five-storey buildings and standing 20m tall, was designed to reflect the university’s continuing progress. Mechslip was chosen along with Ibstock’s Leicester Red facing bricks, due to its A1 rated non-combustible to EN13501-1 standards making it the ideal choice for a modern high-rise structure.
Sponsored
Edinburgh Zoo | Non-Slip Bamboo Decking Case Study

Edinburgh Zoo | Non-Slip Bamboo Decking Case Study

Gripsure (UK) Ltd

The Royal Zoological Society of ScotlandGripsure has teamed up with wildlife conservation charity, the Royal Zoological Society of Scotland, to help create an incredible home for Scotland’s only sloths. Moana and Feira have settled in well at Edinburgh Zoo and have been busy exploring their new surroundings (albeit very slowly). They are set to become a visitor favourite and have already begun to draw in the crowds.Gripsure donated 60 square metres of sustainable anti-slip Bamboo decking. It has been used to create visitor walkways through the recently refurbished enclosure. The space is full of greenery and designed to feel just like home for two-year-old male Moana, nicknamed Mo, and one-year-old female Feira, known as Fe.A special partnershipThis unique project - the result of a special Corporate Sponsorship Partnership between Gripsure and the Royal Zoological Society of Scotland - also features Gripsure Graphics. This innovative new non-slip decking has been used to create fun, educational messaging around the enclosure.Staff said Gripsure decking had helped to establish the perfect environment for the new arrivals – and their fans. “The decking featured in the main walkway flows incredibly well with the exhibit, allowing our visitors to walk right through and become immersed in the natural look and feel of the space, which is wonderful,” said Beccy Angus, Head of Discovery and Learning at the Royal Zoological Society of Scotland.Beccy added: “Being able to add our own artwork was a huge positive for our charity. The ability to personalise the decking meant we could completely tailor it to the enclosure, making it one-of-a-kind and offer more opportunities to engage our visitors with educational interpretation and signage.”A new home for Scotland’s only slothsThe zoo’s two-toed sloths have joined large hairy armadillos Nymeria and Diogo in the Sloths and Armadillos building, which tells the story of wildlife in South America. The Royal Zoological Society of Scotland has been supporting conservation partners in South America, the sloth’s native home, for more than a decade.Conservation and sustainability are at the heart of this new area, which made Gripsure a natural partner. Beccy said the team was delighted with the results. “Gripsure’s generous donation has helped our charity create and deliver a first-class visitor experience within our new sloth building,” she said. “As a wildlife conservation charity, sustainability is at the heart of everything we do. Bamboo was selected as a sustainable material both in the immediate production and in the future as it can be recycled.”Bamboo: a sustainable futureThe bamboo poles used to manufacture the Bamboo decking, which is used at Edinburgh Zoo, are harvested after just five years. This makes them the fastest growing timber in the world.Tom Anderson of Gripsure said: “Edinburgh Zoo were seeking a long lasting sustainable timber but were keen to avoid using tropical hardwoods as logging is destroying the sloth’s natural environment in South America. We recommended Moso bamboo, the giant grass species which can grow up to 80cm per day in the growing season. This species also stores huge amounts of carbon in its vast root network in the forests.”Gripsure manufactures the boards using a heat treatment, which protects the timber from decay and insect attack and gives the boards an expected service life of at least 35 years.Moso bamboo has a class one durability rating, a Euroclass B fire rating, extremely stable with virtually no movement. A study from Delft University shows that, even taking into account the transport and manufacturing process, the product is a net carbon sink over its life span.Connecting people with wildlifeThe sloths are said to be settling in well after arriving at the zoo from Europe. Moana came from Aquazoo Friesland in the Netherlands and Feira arrived from Wilhelma in Germany.Expert staff at Edinburgh Zoo are keeping viewing hours limited for the first few weeks to allow the pair adapt to their new surroundings, complete with plenty of trees and ropes to explore at their own pace. Beccy said: “We hope that by welcoming this well-loved species we can help visitors foster a deeper connection with nature and inspire future conservationists to better protect wildlife across the globe.”
Sponsored
Door Step and Below Door Ventilation

Door Step and Below Door Ventilation

Cast Iron Air Brick Company

Looking down for architectural features in any Georgian town and as well as coal hole covers, manholes and the like you'll see all manner of air bricks and grilles, mostly for sub floor ventilation in property walls. Here is an illustration of a cast iron vent underneath a front door in Regency Bath. Like many it's in a pretty poor state. This one's patched up with steel plate and it's suffocating, what is a key part of the ground floor causing damp. Prevent damp in period property basements and below suspended floors...
Sponsored
Swanick Marina | Commercial Non-Slip Decking Case Study

Swanick Marina | Commercial Non-Slip Decking Case Study

Gripsure (UK) Ltd

Gripsure decking has been used in the development of a new sales pavilion at Swanwick Marina in Southampton.The state-of-the-art building, which opened in the summer, provides 14 high-quality units, which are home to some of the biggest names in the boat business, including Ancasta, Fleming Yachts, MiCats, Nautor’s Swan, Nordhavn, Pearl Yachts, Princess Yachts, Sanlorenzo Yachts and Sunseeker International.The sales pavilion, known as The Saltings, uses our MOSO Bamboo X-treme® with Gripsure decking, creating an attractive and slip-resistant space for berth holders.The profile was chosen for its durability and style, which is very much in keeping with the overall look of the marina. The range is also a sustainable alternative to tropical hardwoods and composite products, boasting best in class for its environmental credentials, strength, stability, and longevity, whilst achieving a Euroclass B fire rating without the need for external treatment.The installer was Amiri Construction and the order for the decking was processed through Covers Timber and Builders’ Merchants in Gosport. Covers Sales Representative Lynn Ward said: “It was a huge project and the final result looks amazing. The bamboo decking that was used is absolutely top spec and very hardwearing. It will definitely do the job.”She added: “Gripsure were helpful to the nth degree throughout the project and really supportive. I’ve already told other people how great they are to work with.”The completion of the sales pavilion was a key stage in the £8 million regeneration of Swanwick Marina. Other stages include the development of a new restaurant and a berth holders’ lounge.Speaking after The Saltings’ opening ceremony in June, Pete Bradshaw, Premier Marinas chief executive, said: “Swanwick’s new sales pavilion provides a unique representation of so many major global brands, it is now the primary destination for motor yacht sales in the UK. “This project has taken many years to deliver, and we are proud of what has been achieved.”Set in the quiet upper reaches of the Hamble River, Swanwick Marina offers 24-hour access to the cruising grounds of the Solent.Images courtesy of Amiri Construction. ©2022 Amiri Group.
Sponsored
West Midland Safari Park | Safari Lodges | Commercial Non-Slip Decking Case Study

West Midland Safari Park | Safari Lodges | Commercial Non-Slip Decking Case Study

Gripsure (UK) Ltd

Gripsure non-slip decking is providing the perfect platform for families to enjoy an unforgettable wildlife experience. Around 3,000 meters of Gripsure Classic decking has been installed outside eight new luxurious lodges at West Midland Safari Park in Bewdley, Worcestershire, meaning guests can make the most of their prime position, gazing out over the elephant or cheetah habitats from the decking area of their lodge.The Safari Lodges, which officially opened in April, have already proved to be a huge hit, with bookings being taken right up until November next year. Six of the lodges offer the UK’s only overnight accommodation experience with elephants, while two more lodges offer views of the park's cheetahs – also the only experience of its kind in this country.Gripsure’s easy maintenance, non-slip and all-weather design is ideal for the lodges’ external decking areas. The spaces allow families to enjoy a meal or just sit and unwind, overlooking the incredible wildlife. Our durable classic non-slip timber decking achieves the highest safety rating on the market. The low-maintenance FSC and PEFC certified timber boards are crafted from slow-grown Vth grade European Redwood Pine.The overall finish looks the part, too, with the lodge decks blending in with the safari-themed wooden buildings. The double-storey elephant lodges are authentically styled, with thatched roofs, accommodating up to five people. They have large, open-plan living spaces with a lounge, dining area and kitchenette. The balcony with outdoor seating offers views to watch the elephants – Latabe, Five and Sutton – as they approach their pool.The two, single-storey, detached cheetah lodges can sleep up to six guests. The living spaces feature large windows spanning one side of the building, offering panoramic views of the cheetahs in their new habitat. Floor-to-ceiling windows in the bedrooms mean guests can watch cheetahs Azrael and Bappe run and play.The Safari Lodges Team at the Park say Gripsure has ticked all the boxes for this ambitious project. “Using Gripsure has not only provided us with a safe and secure decking solution for our external verandas at Safari Lodges, it has also succeeded visually and aesthetically by blending in with the authentic and natural surroundings that our lodges are nestled within,” said a spokesperson, adding that the Gripsure team have been a pleasure to work with.“We would definitely recommend Gripsure to other attractions,” said Project Manager, Neil James. “Their professional manner and great communication skills really made us feel confident throughout this huge project, particularly during such unprecedented times with the pandemic.”All media is courtesy of West Midlands Safari Park. ©2021 West Midlands Safari Park.
Sponsored
Vandersanden publishes Collective Well-being 2021 report

Vandersanden publishes Collective Well-being 2021 report

Vandersanden Brick

Rudi Peeters, new CEO of Vandersanden: “Collective Well-being is the reason why I came to Vandersanden”Vandersanden launches its Collective Well-being 2021 report. In this report, Vandersanden provides a transparent annual overview of its efforts and results in terms of sustainability across four areas: the environment, the (construction) industry, its own employees and the community. The past year’s performance shows once again that Vandersanden is on the right track towards CO2-neutrality by 2050.In recent years, Vandersanden has already taken huge strides in the field of sustainability, and time did not stand still in 2021 either. In its new report, Vandersanden provides an overview of its ambitions and concrete achievements of the past year. In 2021, Vandersanden was able to boast its first Great Place to Work certification in four countries, as well as ECO packaging with at least 30% recycled material and 80% less ink, which results in 400,000 kg less CO2 each year. In addition, Vandersanden also took further steps in the development of CO2-neutral bricks, the competence development of its employees was broadened, and the brick manufacturer opened a new showroom in Northern France and in Tolkamer (NL). As a true community builder, in 2021, Vandersanden also invested EUR 500,000 in charities at home and abroad. “Collective Well-being is definitely not window dressing”Whilst it is Vandersanden’s second Collective Well-being report, it is CEO Rudi Peeters’ first time to co-launch the report. For him, Collective Well-being was a deciding factor in joining Vandersanden: “In my first months at Vandersanden, I saw that Collective Well-being is definitely not window dressing. I immediately noticed that Collective Well-being truly is in the company’s DNA. It is present throughout the organisation, at all levels, among all employees,” says Rudi Peeters, CEO of Vandersanden. “Vandersanden has made tremendous efforts to become greener and more sustainable in recent years. I want to continue that approach. This ranges from baking CO2-neutral bricks to a fully electric fleet, including forklifts.”This year, Vandersanden highlights the various aspects of its ‘Collective Well-being’: for the environment, in the industry, at work and for the community. In addition to the initiatives taken and achievements made, special attention is also paid to the history of Collective Well-being, and how the concept itself, as well as the operations, have evolved from a deep-rooted conviction to a strategic priority. In addition, a separate chapter is devoted to training & coaching in the workplace and the report places particular emphasis on collaboration with partners in all areas of Collective Well-being. For example, several pages of the report are devoted to a double interview with NGO Cunina and Vandersanden.   Eddy Deconinck, Collective Well-being Director at Vandersanden comments: “It is thanks to the commitment of all our 800 colleagues and partners that Vandersanden can call itself a leader in Collective Well-being and sustainability. The shared belief in climate improvement and energy efficiency motivates us to keep raising the bar in our industry and, of course, the community to which we belong. Thanks to this broad view, Vandersanden is a leader in Collective Well-being today.”The full sustainability report and more information about Collective Well-being at Vandersanden can be found on the link below: 
Sponsored
Vandersanden Reduces Ecological Footprint With New Sustainable Packaging

Vandersanden Reduces Ecological Footprint With New Sustainable Packaging

Vandersanden Brick

Vandersanden, Europe's largest brick-producing family business, plans to reduce its ecological impact by 15 percent by 2023[1] and aims to be fully carbon neutral by 2050. To achieve this goal, the family business is making its packaging more sustainable, using recycled material and less ink. In this way, Vandersanden is taking an important step towards circular packaging. In 2022, Vandersanden will only use plastic sleeves and shrink-wrap that consists of at least 30 per cent recycled material. By the end of that year, a large proportion of the packaging will contain 50 per cent recycled material. This is one of the initiatives the family business is embarking on, to reduce its carbon footprint by 15 per cent by 2023, compared to the benchmark in 2019 and to be completely carbon neutral by 2050."By using covers and sleeves that consist of 30 per cent recycled materials, 400,000 kg less CO2 is emitted annually," explains Raf Jansen, Chief Operations Officer at Vandersanden. "That is equivalent to planting 17,000 trees. In time, we want to increase that share to 50 per cent recycled materials, which in environmental terms is the equivalent of 58 hectares of forest or 29,000 trees. These figures clearly show that the environmental benefits of recycling are enormous."Investing in generationsIn addition to increasing the use of recycled materials, Vandersanden is also ensuring that less ink is used for printing on its packaging. The brick manufacturer will introduce eco-printing at all its production sites during 2022, which means that only a maximum of 10 percent of the packaging surface will be printed. This has several advantages for the environment. The smaller print area requires up to 80 percent less ink, and eco-printed sleeves are also easier to recycle into high-quality material."By printing on a maximum of 10 percent of the packaging surface, we save on ink and our packaging becomes easier to recycle. This is an important step towards circular packaging and a contribution to our long-term goal of being completely CO2 neutral by 2050. I am proud of the efforts of all our employees and partners to make our production processes increasingly sustainable. As a family business, we think in terms of generations, not years," adds Raf Jansen.Innovation through repeated testingIn order to guarantee the quality of the new sustainable packaging, Vandersanden conducted several tests during its development in the past year. This is to ensure the strength of the recycled material packaging is guaranteed. These tests were so positive that further tests are currently underway to make the shrink wrap thinner as well, in order to use even less material.Vandersanden is taking action at all levels of its organisation to minimise its environmental impact and achieve the goal of CO2 neutrality by 2050. For instance, Vandersanden is currently examining how it can deal with pallets in a sustainable way and is taking steps to work with return pallets. Another recent example of sustainability initiatives undertaken by Vandersanden, is the introduction of the most energy-efficient brick kiln in Europe at Tolkamer. The family business also published its first sustainability report in 2021, the Collective Wellbeing 2020 report, with a full overview of all its sustainability initiatives and objectives.[1] compared to 2019
Sponsored
Multi-purpose space created for local community

Multi-purpose space created for local community

Altro

IssueWavendon Community Hub has been created and designed to provide local residents with a place to meet and take part in physical and social activities. In keeping with surrounding properties, Wavendon Community Hub is constructed in red/buff brick, with pitched tiled roofs. The building comprises two separate halves: a community side with a vaulted hall space and a separate, large multi-purpose area with changing facilities. The floors needed to perform for different needs and uses, providing robust durability, safety from slips, but still provide welcoming good looks.ApproachThe project was designed by W E Architecture Ltd and the build was completed by Borras Construction Ltd, with flooring installed throughout by HC Coverings Ltd, using Mapei floor preparation products.SolutionResilient flooring was specified throughout the centre and installed over underfloor heating. Designs specified throughout the 500 square metre area included Altro Wood in the communal areas, Altro Aquarius in the toilets, showers and changing rooms and Altro Walkway 20 in corridors and back-of-house areas.
Sponsored
Warmth of red brick and terracotta

Warmth of red brick and terracotta

Powdertech (Corby) Ltd

Project OverviewMount Earl Gardens is a new residential development in Streatham, South London, built on a site formerly occupied by old garages. Modular construction has been used to create a building of one, two and three storeys, creating as little impact as possible on the views from existing houses. Walkways have been designed within the block, with 'modernist' screening which allows light and fresh air into these areas whilst still keeping them safe and secure for residents. The aluminium screening runs along the length of the buildings and is also utilised in sections, including garden division screens, throughout the entire block of thirty-two apartments. To achieve the design vision, the building needed an homogeneous appearance to blend with the external red brick facade.Off-site build and finishThe client selected the perfect shade from our Landscape™ Terrain range of powder coatings - 'Original Terracotta'. All of our architectural powder coating have excellent durability, requiring minimal maintenance. Powder coating as a process brings further benefits, particularly to a modular build. The apartments were entirely built in a factory, leading to a faster installation time, less time spent on site and a 90% reduction in on-site waste. Powder coating is also a factory controlled process, thereby reducing time spent, and waste generated on site, and not dependent on weather conditions as is the case with air drying wet paint.Powdertech Corby coated nearly 3000 linear metres of aluminium which was fabricated into screens off-site and delivered to site just in time for installation.BenefitsPowder coating is an offsite process. It is factory controlled leading to improved consistency, less wastage and reduced environmental impact.The powders have excellent weather resistance and colour stability.Powdertech's rigorous pre-treatment system will help to keep the facade elements free from corrosion for up to 40-years.Powdertech plant and the operational team have the capacity to process large quantities of material within a short time frame, with no compromise on quality.
Sponsored
Woodlands Glencoe Luxury Lodges | Commercial Non-Slip Decking Case study

Woodlands Glencoe Luxury Lodges | Commercial Non-Slip Decking Case study

Gripsure (UK) Ltd

Woodlands is a family-run resort located in the breathtaking landscape of Glencoe, Scotland. In addition to a whole host of activities on offer, including "the best 9 hole course in Scotland" as described by Bunkered Magazine, Woodlands give you the opportunity to experience pure indulgence during a stay in one of their spectacular cabins. Our Premier deck boards were specified for RiverBeds, their set of ‘Luxury Wee Lodges’, where guests can nestle themselves into nature with everything one could possibly need for a magical and memorable escape from reality. Decking was installed on the private verandas of each cabin, overlooking the river, and around the hot tub. Individual decking boardwalks and steps were also incorporated, weaving guests through the trees and safely up to their accommodation. Gripsure non-slip timber decking offered the perfect solution for this project being both a practical and attractive choice. Whereas the safety of guests is of the most importance, especially during the winter months where the cabins offer a snowy, and some times icy, retreat, Woodlands also needed a modern-looking product which could blend in with the luxurious look and feel of the lodges, as well as its natural surroundings. “We looked long and hard for a product that was tough, durable and beautiful. Gripsure was the obvious choice, and is used extensively in our RiverBeds Luxury Wee lodges with Hot Tubs. 5 years on, it seems that this was a good decision – the decking is easy to maintain, still looks wonderful and the support, advice and service from the Gripsure team has been amazing! A professional company with a brilliant product.” – James Young, Managing Director, Woodlands Glencoe.
Sponsored
Water bottling plant - anti slip floor coating/ line marking paint

Water bottling plant - anti slip floor coating/ line marking paint

Watco UK Ltd

Our client, the world’s second largest producer of bottled water, was looking for industrial floor paints to renovate and maintain indoor walkways and create seamless traffic flows in its factories. And that’s no mean feat as the area to paint was over 2500 m2!"The objective of the refurbishment was to improve the visibility of the walkways in the production area to enhance employees’ safety."As the factory hadn’t been renovated for some years, floor markings were no longer visible and cracks were appearing throughout thus increasing the risk of trips and falls.In a food processing plant, there are strict environmental and safety regulations to comply with. It was therefore important that the paints and coatings used in the refurbishment conform to those regulations, but also have a rapid curing times to minimise downtime.Our client’s organisation relies heavily upon the dynamism of its teams. It was therefore only natural that employees themselves – from the accounting department to the technical teams - rolled up their sleeves and got on with the refurbishment project. The idea was to raise awareness of safety issues in the factory. For us, it meant we needed to supply user-friendly paints and coatings that could be applied easily by staff. Our solutionOur client researched various solutions and suppliers for their refurbishment project. Watco products, which are long lasting and user-friendly, stood out from the competition. Three products were applied: Safety Grip: A heavy duty anti slip, two pack epoxy resin coating designed for dangerous areas. Epoxyline: A heavy duty, fast drying, line marking paint. Epoxy Gloss Coat: An extremely tough floor coating that is virtually solvent free, and therefore ideal for a food processing plant.
Sponsored
REEMA Properties, Swindon

REEMA Properties, Swindon

K Systems Insulated Facades

BackgroundK Systems’ retrofit of the REEMA non-traditional construction Properties in Swindon, South-West England, is a stellar example of the company’s ability to harness years of expertise with forward-thinking innovation to meet the needs of its clients.Swindon Borough Council had a development of 50+ properties in Upper Stratton all with aged facades and poor thermal qualities, some with U-values as inadequate as1.59W/m ² K.K Systems supported Swindon Borough Council, led by Projects Surveyor John Black, to completely refurbish this residential development and deliver on five primary objectives:- Improve the thermal performance rating of each home (SAP rating)- Deliver greater thermal comfort for residents- Choose a solution with acoustic benefits and non-combustable benefits- Reduce tenants’ energy consumption- Deliver an attractive aesthetic that would uplift the areaHaving a good reputation for matching systems with finishes to deliver its clients’ visions, K Systems partnered with approved installer, Rateavon Ltd, to scope out theproject and specification in fine detail, with particular focus on insulating properties and aesthetic.Our ServiceK System worked in collaboration with Swindon Borough Council and Rateavon Ltd to upgrade these poorly insulated houses and deliver a total revamp of the properties, resulting in thermally efficient homes.One of the primary requirements was to improve the performance rating of each home, with a target U-value of 0.30W/m²K. In fact, K Systems exceeded that in the project delivery by achieving a U-value of 0.29W/m²K.The project was completed with minimal disruption to existing residents, and due to forward planning and regular site visits by an experienced K Systems project manager, where processes and progress were monitored and evaluated, the project was completed within the agreed timescale.Digital technology was deployed from the very beginning to produce models and CGIs (Computer Generated Imagery) to not only assure Swindon Council the finished project would meet its specific requirements, but to also guide the design process and ensure compliance with all health and safety regulations.Regular inspections and site audits were carried out alongside Swindon Council to ensure the same level of care and attention to detail that applied when specifying theproject was being applied during its implementation and delivery.Technical Project DetailsOn initial inspection, K Systems found a problematic substrate. The REEMA hollow panel non-traditional construction properties are constructed of a concrete frame with thin concrete panels to the exterior façade. This type of thin panel construction created a significant challenge for the team to find a suitable EWI fixing, but with the help from Rawlplug, one of our EWI fixings suppliers a robust and safe fixing solution was found, without compromising the existing REEMA construction.Harnessing years of EWI system design knowledge and unrivalled expertise in this field, K Systems worked closely with Rawlplug and a structural engineer to identify a suitable fixing detail and pattern which would not only be robust but also suitable for this type of substrate.With a structurally strong solution agreed, focus then turned to the appropriate insulation solution.After a comprehensive scoping process taking into consideration client requirements, project objectives, budgets and timeframes, K Systems specified the industry proven K Systems M, Mineral Wool EWI system to not only significantly boost thermal performance of the buildings but also reduce noise pollution for the tenants.K Systems 100mm Mineral Wool insulation has an industry-leading ability to generate exceptional thermal performance. That made it the perfect choice for the refurbishment as it would combat the increased heating costs faced by residents whilst retaining the solid foundations of the existing building and reducing the risk of condensation or mould damage.Other technical benefits which made the K Systems Mineral Wool system the ideal specification for this refurbishment include:- non-combustibility, A2-s1,d0 fire rated- its excellent acoustic properties, reducing noise pollution- its environmentally friendly composition as the insulation is free from gases with ODP (ozone depletion properties) or GWP (global warming potential)- its workability and easy to cut format, reducing labour time across the board for the team.Having identified solutions that improved structure and thermal performance, K Systems then offered the best quality finish for the properties – an aesthetically pleasing, cost effective combination of VBriQ+ clay brick slips and Silkolitt+ silicone render that both Swindon Council and the residents would be proud of.VBriQ+ is a lightweight, highly durable, clay brick slip system and a more cost-effective finish option in comparison to tradition brick systems without compromising on quality, weather resistance, workability and durability. This made it perfect for a project of this scale – a project which required maximum and long-lasting impact without incurring maximum costs.The Silkolitt+ silicone render finish rejuvenated the properties’ exteriors and massively enhanced the area’s overall aesthetic, making it a much more appealing place to set up home.Yet again going the extra mile for clients to ensure unrivalled workmanship and longevity, K Systems finished all 52 properties with K Pro - a water-based protective treatment used to provide long term enhanced water repellent properties to external render and other masonry surfaces, helping combat the problems associated with water intrusion including efflorescence, frost, water-soluble pollutants and algae growth meaning the substrate will stay clean and dry for longer.K Systems and approved installer Rateavon Ltd delivered an excellently designed and expertly executed refurbishment, that exceeded the expectations and requirements of the client, Swindon Council, and the residents of the newly improved homes.John Black, Projects Surveyor at Swindon Borough Council, said:“Throughout the project K Systems have supported Swindon Borough Council agreeing all detailing to ensure current day Building Control Regulations were met. They supported resolutions throughout the project lifecycle and were really reactive, visiting site and supporting when required. They carried out weekly detailed spot check reports with photographic evidence and also checked batch numbers of materials. They delivered a great service. A really successful project.”

Showing 145-157 of 157

Feedback