NBS Source
I'm a manufacturer

"access hatch"

1,046 results found

Sort by:

Showing 73-108 of 108

Sponsored
Surespan provide access to space - Kielder Observatory

Surespan provide access to space - Kielder Observatory

Surespan

Kielder Observatory Surespan designed and manufactured two sets of bespoke double leaf hatch doors for the Kielder Observatory located in England’s largest forest in Northumberland.  The ProjectAs part of the Kielder Art and Architecture program, Charles Barclay Architects designed Kielder Observatory for the Forestry Commission. The all-timber observatory was constructed from Douglas fir with larch cladding, the pier-like building has rotating turrets that house two permanent telescopes and an observation deck. The turrets can be rotated through 360 degrees.The observatory generates its energy using a wind turbine and photovoltaic panels and includes a composting toilet. The observatory has received 2009 awards from the RIBA and The Civic Trust and featured in the inaugural World Architecture Festival.  The ProductSurespan design and manufactured two sets of bespoke double leaf hatch doors for the roof and the front of the Observatory’s two rotating turrets – one to house a 20” Pulsar manual telescope and the other for a small Mead 14” telescope.  FeaturesThese hatches are electrically operated and have been specially designed to open in a specific sequence using remote control via 24v dc actuators.      
Sponsored
AOV for Smoke and Fire Safety

AOV for Smoke and Fire Safety

Surespan

Product:Surespan 140° thermally broken aluminium smoke ventilator and roof hatch designed to EN12101-2. ]The AOV also offers push-button comfort ventilation in one package! This one-stop solution for smoke vent requirements to meet building control can achieve 1m² airflow and is available in standard stocked sizes or made to any size in between 900 x 900 and 1260 x 1260. Wind deflectors to improve airflow. RE 1,000 Ventilation 10,000 Vent Offset mechanism for Roof Access Snow Load SL500 Wind Load WL1500 Temperature Class T (-15°) Fire Resistance B300
Sponsored
New Product - Quadro DD wooden loft ladder with secondary upper loft hatch. Premier Loft Ladders

New Product - Quadro DD wooden loft ladder with secondary upper loft hatch. Premier Loft Ladders

Premier Loft Ladders Ltd

The Quadro DD is a highly insulated wooden loft ladder. It features a secondary upper loft hatch, which achieves an overall U-value of 0.46 W/m2K. The upper hatch can be closed immediately after entering the loft, therefore helping to lock the warmth in the home or building, and preventing moist air from flowing into the loft and condensing in the cold areas. Suitable for high ceilings (up to 3.44 m). Visit Premier Loft Ladders web site for further details.
Sponsored
Profab Access Ahead of the Curve with Fire Testing

Profab Access Ahead of the Curve with Fire Testing

Profab Access Ltd

Profab Access Ltd, part of the Access 360 portfolio, is prioritising fire safety in buildings with the introduction of fire testing for both sides of its 4000 Series riser door range. Established in 2001, Profab Access Ltd is a leading UK manufacturer of wall and ceiling access panels and riser doors. The company employs a team of 71 and operates from a 46,000 sq. ft. manufacturing and distribution facility in Atherstone, Warwickshire. All aspects of the design and manufacturing process are carried out onsite.
Sponsored
Plastic Access Panel in Small Domestic Bathroom

Plastic Access Panel in Small Domestic Bathroom

The Access Panel Company Ltd

Adding a white Plastic Access Panel into the ceiling of a petite bathroom to provide easy access to utilities without detracting from the aesthetic of the customer's bathroom. Prioritizing utility and visual appeal, the Plastic Access Panel is a cost-effective solution that grants homeowners easy entry to concealed utilities, seamlessly merging with the bathroom's ambience. The access panel's white textured surface adds a note of elegance to the surroundings, complementing any interior decor.The installation process for the plastic access panel is streamlined and straightforward. The accompanying images document each phase of the process, guiding you through the steps involved.Ultimately, this undertaking harmonizes practicality with style, underscoring how a modest addition can wield a significant impact. The white plastic access panel eradicates the need for unsightly makeshift access points. Balancing cost-effectiveness, inconspicuous aesthetics, and a dash of refinement, this installation transcends mere functionality elevating both the utility and visual charm of the compact bathroom.
Sponsored
The Shard

The Shard

Rapid Access Ltd

The Shard, 31 St Thomas Street, London SE1 9RYThe Shard is not simply an iconic building but represents a new approach to expanding the urban landscape. Offices, residences, and public spaces alike are all taken skyward.The Shard, an iconic skyscraper in London, represents one of the city's most prestigious architectural landmarks. Ensuring efficient utility access solutions within such a complex and monumental structure was a significant challenge. This case study highlights the successful collaboration between The Shard and Rapid Access Ltd, a leading supplier of FlipFix Access Panels that utilize the fast fitting FlipFix Clamps for secure and quick installation.Challenges:1. Utility Access Complexity: The Shard's unique architectural design made access to utility systems, including plumbing, electrical, HVAC, and telecommunications, particularly complex.2. Architectural Significance: The project demanded a high level of architectural integrity and minimal disruption to the building's aesthetics during the installation of access panels.3. Efficient Installation: With a building of this magnitude, an efficient and rapid installation process was crucial to minimize downtime and disturbance to occupants.Solution:Rapid Access Ltd, known for their expertise in access solutions, was chosen to address the specific requirements of The Shard. The solution included the installation of FlipFix Access Panels, which leverage the fast fitting FlipFix Clamps, designed to meet the following key criteria:1. FlipFix Access Panels: Rapid Access Ltd provided access panels that integrated seamlessly into the complex architecture of The Shard while offering secure access to utility systems.2. FlipFix Clamps: The use of FlipFix Clamps ensured quick and reliable installation, minimizing disruption and maintaining architectural integrity.3. Efficiency and Security: The access panels and FlipFix Clamps facilitated efficient access to utility systems while ensuring the security and safety of the building.Implementation:The installation of FlipFix Access Panels utilizing FlipFix Clamps by Rapid Access Ltd was executed with precision and expertise. The unique design of FlipFix Clamps enabled swift and secure installation, minimizing downtime and ensuring the structural integrity of The Shard.Conclusion:The collaboration between The Shard and Rapid Access Ltd demonstrated the successful integration of utility access solutions into a complex and iconic skyscraper. The installation of FlipFix Access Panels, using the fast fitting FlipFix Clamps, not only met functional needs but also contributed to the overall success of The Shard, ensuring efficiency and architectural harmony. This case study underscores the importance of selecting the right access solutions provider for complex architectural projects.
Sponsored
Three brands, one objective – safe access all areas

Three brands, one objective – safe access all areas

Profab Access Ltd

Three of the UK’s leading access specialists have come together to form the Access 360 portfolio, providing a total manufacturing solution for roof, ceiling, wall and floor access products for the construction industry. Access 360 comprises Bilco UK, Profab Access and Howe Green. These well-established brands all have a strong reputation for delivering innovative solutions to address the challenges of safe access within a building or external environment.
Sponsored
Antibacterial Paint for Access Panels

Antibacterial Paint for Access Panels

Rapid Access Ltd

Our panels coated with Anti Bacterial powder coat are manufactured to meet the sanitary requirements of Hospitals, Labs and Clean Rooms.Our Antibacterial Powder Coat is available on all our Metal Faces Access Panels and features an effective Antibacterial agent which kills most species of bacteria including: MRSASALMONELLAE COLI C DIFFICILE
Sponsored
Introducing Our Germ Resistant Access Panel

Introducing Our Germ Resistant Access Panel

Trade Access Panels

As well as offering our customers a bespoke service in which we can offer any size and any shape access panel, we are now adding Antibacterial Powder Coating as an addition to our extensive range of products. It is available on all our Metal Faced Access Panels and features an effective antibacterial agent which kills fungi and most species of bacteria including the deadly MRSA, Salmonella, E coli and C difficile.
Sponsored
How to Choose Access Panels for Walls & Ceilings

How to Choose Access Panels for Walls & Ceilings

Trade Access Panels

This guide on the different variations of Access Panels, will help you decide which one is best for you.
Sponsored
Access Panels, A Clear Choice: Access Building Products grace the prestigious Old War Office refurbishment

Access Panels, A Clear Choice: Access Building Products grace the prestigious Old War Office refurbishment

Access Building Products Ltd

When it comes to refurbishing a landmark as historic and luxurious as the Old War Office, every detail counts. The selection of Access Building Products Access Panels for this prestigious project is a testament to the company’s commitment to quality, design, and functionality.The Project: A Blend of History and LuxuryFast forward to today, the Grade II listed Old War Office building, which has been closed to the public for more than a century, has undergone a magnificent transformation. The building has been re-imagined and redeveloped into a luxury hotel and residences, bringing a new lease of life to this historic site. This transformation demanded products that could match its grandeur while maintaining its historic charm.The Challenge: Balancing Aesthetics and FunctionalityEvery customer wants their access panels to seamlessly blend with the interior design, ensuring that the necessary utility access points don’t detract from the building’s aesthetic appeal. This was a critical consideration for such a historical building.The Result: A Seamless Fusion of History and ModernitySupplying a range of discreet steel and plaster in style access panels in the Old War Office refurbishment was a resounding success. These panels not only met the practical requirements but also added to the overall aesthetic, creating a harmonious blend of historic elegance and modern luxury.The Old War Office now stands as a shining example of how to preserve historical charm while incorporating modern necessities. This project has further cemented Access Building reputation as a reliable provider of high-quality access panels, capable of meeting the demands of even the most prestigious refurbishment projects.In conclusion, when history meets luxury, it’s essential to make the right choices. And in the case of the Old War Office refurbishment, Access Building Products Access Panels were the perfect choice.
Sponsored
Three Bridges Station

Three Bridges Station

A J Wells & Sons

AJ Wells designed, manufactured and installed just over 1000m2 of vitreous enamel wall cladding with a metal ceiling to modernise the public areas of Three Bridges Station and provide easy access to hidden electrical and telecommunication services.The metal soffit was designed and installed to act as both a water management system and create an aesthetically pleasing ceiling in the subway and platform access areas. The ceiling also incorporated inspection hatches so that the underside of the rail bridges could be inspected periodically by the relevant parties.AJ Wells carried out the installation work under extremely challenging conditions as Three Bridges station is open 24 hours a day throughout the year. As a result the majority of works could only be carried out during the evening and in the early hours of the morning when customer traffic flow was at a minimum.AJ Wells worked closely with the other trades on the project in order to ensure that all interfaces achieved their required purpose.KEY FEATURES:• Vitreous Enamel Cladding system• PM13 ceilingA.J WELLS SERVICES:• Design• Manufacture• Installation
Sponsored
The Cadet wooden loft ladder and hatch combines traditional style with modern engineering…

The Cadet wooden loft ladder and hatch combines traditional style with modern engineering…

Premier Loft Ladders Ltd

The result is an attractive and thermally-efficient loft ladder that is perfectly suited for residential/domestic applications. The Cadet is available as either a 3-part folding wooden loft ladder (shown here) or a 2-part sliding ladder. Key benefits at a glance… ? Well insulated (U-value 0.90 W/m2K) ? Airtight seal (Class 4 certified) ? Load capacity of 150kg per step ? Wide steps / treads with anti-slip profile for comfort and safety ? Hatch box trap door finished in white on both sides ? Supplied ready to install Visit our web site for more information about the Cadet loft ladder
Sponsored
Heathrow Airport

Heathrow Airport

Rapid Access Ltd

Heathrow Airport, Hounslow TW6 1QGHeathrow’s plans for expansion at the airport with a third runway to the north-west of the existing two are currently supported by Government policy through the Airports National Policy Statement. Expansion at the airport would create tens of thousands of jobs and billions in economic benefits to the UK.Heathrow Airport, one of the world's busiest and most prominent international airports, requires top-tier access solutions that balance security and aesthetics. Ensuring efficient maintenance and access to utility systems is essential for its seamless operation. This case study highlights the successful collaboration between Heathrow Airport and Rapid Access Ltd, a leading supplier of new flush lock Access Panels with a sleek, discreet finish and a spring-loaded locking mechanism.Challenges:1. Critical Infrastructure: Heathrow Airport is a vital transport hub, serving millions of passengers annually. Access solutions needed to support maintenance without compromising security or aesthetics.2. Efficient Maintenance: The project demanded access panels that allowed for quick and secure access to utility systems, reducing downtime and disruptions.3. Sleek Design: The access solutions had to align with the airport's modern and sleek architectural aesthetics, complementing the overall design.Solution:Rapid Access Ltd, known for their expertise in access solutions, was chosen to address the specific needs of Heathrow Airport. The solution included the supply and installation of new flush lock Access Panels with a discreet finish and a spring-loaded locking mechanism, designed to meet the following key criteria:1. New Flush Lock Access Panels: Rapid Access Ltd provided access panels with a sleek, discreet finish, ensuring functionality and a modern, unobtrusive design.2. Efficiency and Security: The access panels allowed for swift and secure access to utility systems, enhancing operational efficiency while maintaining stringent security standards.3. Architectural Integration: The access solutions seamlessly integrated into the airport's modern architectural design, complementing its aesthetic appeal.Implementation:The supply and installation of new flush lock Access Panels by Rapid Access Ltd were carried out meticulously, ensuring that the sleek and discreet design elements were in harmony with the airport's architectural aesthetics. The locking mechanism was integrated with precision to meet the highest security standards.Conclusion:The collaboration between Heathrow Airport and Rapid Access Ltd exemplified the successful integration of access solutions that balanced functionality, security, and aesthetics for a world-class transportation hub. The installation of new flush lock Access Panels not only met functional needs but also contributed to the airport's overall efficiency, security, and architectural appeal, enhancing the passenger experience. This case study underscores the importance of selecting the right access solutions provider for critical infrastructure projects with specific design requirements.
Sponsored
Bespoke Glazed Roof Access - The McLaren Technology Centre

Bespoke Glazed Roof Access - The McLaren Technology Centre

Surespan

The McLaren Technology Centre hosts a variety of diverse environments including; manufacturing facilities, a futuristic wind tunnel, restaurant, pool, gymnasium, museum, visitor centre, and exhibition and conference areas. Surespan was chosen to design and engineer the making of a 70m diameter glazed roof structure that would act as the roof for the visitor's centre. The structure has two fire escape hatches which would be used in the case of an emergency. The team at Surespan were proud to have been selected for such a project because of their superior engineering expertise and unique skills.
Sponsored
The Peninsula Hotel

The Peninsula Hotel

Rapid Access Ltd

The Peninsula London, 1 Grosvenor Pl, London SW1X 7HJ The Peninsula London offers 190 exquisitely styled guest rooms and suites by Architect and Designer of Interiors, Peter Marino. Superbly situated alongside Hyde Park Corner and Wellington Arch, The Peninsula London occupies one of the city's most prestigious addresses.The Peninsula Hotel London, renowned for its luxurious hospitality, sets high standards for safety, comfort, and tranquility. Ensuring secure utility access and acoustic comfort is essential for its distinguished clientele. This case study highlights the successful collaboration between The Peninsula Hotel London and Rapid Access Ltd, a leading Manufacturer of 2-hour fire rated Riser Doors with a 40DB acoustic rating.Challenges:1. Safety and Compliance: The Peninsula Hotel London demanded access solutions that met stringent fire safety and compliance standards, ensuring the safety of guests and staff.2. Acoustic Comfort: Maintaining a tranquil and peaceful atmosphere within the hotel's opulent surroundings was a top priority.3. Efficient Utility Access: The project required access solutions that facilitated efficient maintenance of utility systems without compromising safety or tranquility.Solution:Rapid Access Ltd, recognized for their expertise in access solutions, was chosen to address the specific needs of The Peninsula Hotel London. The solution included the supply and installation of 2-hour fire rated Riser Doors with a 40DB acoustic rating, designed to meet the following key criteria:1. 2-Hour Fire Rated Riser Doors: Rapid Access Ltd provided riser doors that met stringent fire safety standards, ensuring the safety of guests and staff.2. 40DB Acoustic Rating: The riser doors were equipped with an acoustic rating of 40DB to maintain a peaceful and quiet environment within the hotel.3. Efficiency and Security: The access solutions allowed for swift and secure access to utility systems, enhancing operational efficiency while upholding safety and tranquility.Implementation:The supply and installation of 2-hour fire rated Riser Doors with a 40DB acoustic rating by Rapid Access Ltd were carried out with meticulous attention to safety and acoustic comfort. The installation process was executed to meet the highest standards set by The Peninsula Hotel London.Conclusion:The collaboration between The Peninsula Hotel London and Rapid Access Ltd exemplified the successful integration of access solutions that met stringent safety, acoustic, and efficiency standards in a luxury hospitality setting. The installation of 2-hour fire rated Riser Doors with a 40DB acoustic rating not only met functional needs but also contributed to the overall safety and comfort of The Peninsula Hotel London, enhancing the guest experience. This case study underscores the importance of selecting the right access solutions provider for high-end establishments with specific safety and comfort requirements.
Sponsored
Waterproofing an Air Traffic Control Tower, Scotland

Waterproofing an Air Traffic Control Tower, Scotland

Newton Waterproofing Systems

Heavy rainfall on the Orkney Islands meant that the basement room of Kirkwall Air Traffic Control Tower suffered from frequent flooding, with water levels reaching 1.2m at their highest point. Newton Waterproofing and Specialist Contractor Wise Basement Systems were called in to remove the existing water and then waterproof the structure to protect it from future flooding, all in just one week.Kirkwall airport is located on the main island of the Orkneys, 10-miles off the North coast of Scotland. Presented with a logistically challenging location and a tight project timescale of just 1 week, Newton had no hesitation in recommending the expertise of Wise Basement Systems as the specialist contractor to Building Surveyor Pick Everard.Getting involved at the very start of the project, Wise were immediately able to design, advise on and install a system to remedy the 2 inches of water in the existing basement of the Air Traffic Control tower.Cavity Drain Waterproofing, or ‘Type C’ waterproofing as it is defined by BS 8102:2009 is often the most effective means of achieving a completely dry ‘Grade 3’ environment in an existing structure below ground. It was therefore no surprise that Wise Basement Systems designed a Newton CDM System for this existing basement area.To begin, Wise installed 120m2 of Newton 508 on the walls and 80m2 of the recycled Newton 520 eco to the floor, above the closed-cell Fibran XPS 500-C insulation. The drainage membranes were supplemented with a perimeter channel of Newton Basedrain, directed to a Titan-Pro sump chamber containing two NP400 Pumps to remove the water.Finally, to ensure that the system will continue to work in all eventualities, even in a complete power outage, Wise installed a backup system with dual Northstar batteries and a Victron Power Inverter.Even with a project located 10 miles from the mainland, and 1 week to waterproof a basement with only a 600mm wide access hatch, Wise Basement Systems delivered a completely dry space for the client that was also compliant with BS 8102:2009 and backed by their guarantee.
Sponsored
One Hyde Park

One Hyde Park

Rapid Access Ltd

One, Hyde Park, 100 Knightsbridge, London SW1X 7LJOne Hyde Park is a major residential and retail complex located in Knightsbridge, London.The development includes three retail units (Rolex, McLaren Automotive and Abu Dhabi Islamic Bank) and 86 residential properties, with prices starting at around £15 million, and penthouses selling for almost £200 million, it is generally considered the most exclusive apartment building in the world.Located at 100 Knightsbridge, London, stands as one of the city's most prestigious residential developments. Maintaining architectural excellence while ensuring efficient utility access was of paramount importance. This case study highlights the successful collaboration between One Hyde Park and Rapid Access Ltd, a leading supplier of Circular Ceiling Access Panels and Dual Access Panels.Challenges:1. Utility Access Excellence: One Hyde Park required access solutions that provided reliable and efficient access to utility systems, including plumbing, electrical, HVAC, and telecommunications, while upholding the luxury standards of the development.2. Architectural Significance: The project demanded the preservation of architectural integrity and minimal disruption to the building's aesthetics during the installation of access panels.3. Versatility Requirement: The development needed access solutions that catered to various spaces, from standard areas to circular ceiling installations.Solution:Rapid Access Ltd, renowned for their expertise in access solutions, was chosen to address the specific requirements of One Hyde Park. The solution included the installation of Circular Ceiling Access Panels and Dual Access Panels, designed to meet the following key criteria:1. Circular Ceiling Access Panels: Rapid Access Ltd provided access panels specially designed for circular ceiling installations, offering aesthetic and functional excellence.2. Dual Access Panels: Dual Access Panels were deployed to provide versatility, ensuring seamless access to utility systems across various spaces within the development.3. Architectural Harmony: The access panels were meticulously customized to blend with the architectural design of One Hyde Park, preserving the property's luxurious appeal.Implementation:The installation of Circular Ceiling Access Panels and Dual Access Panels by Rapid Access Ltd was executed with precision and expertise. The unique design of the panels ensured seamless integration, while the dual access panels provided versatility for various utility access points.Conclusion:The collaboration between One Hyde Park and Rapid Access Ltd demonstrated the successful integration of utility access solutions into a prestigious residential development. The installation of Circular Ceiling Access Panels and Dual Access Panels not only met functional needs but also contributed to the overall success of One Hyde Park, ensuring architectural excellence and operational efficiency. This case study underscores the importance of selecting the right access solutions provider for luxury architectural projects.
Sponsored
Fire Rated Access Panel Trust Pilot Review

Fire Rated Access Panel Trust Pilot Review

Trade Access Panels

Customer ordered our fire rated FlipFix panel. We dispatched the same day and the customer received their access panels the following day. Customer comments:-"Easy to order and delivery was quicker than expected which was a bonus for us as we were able to complete the job earlier than planned."
Sponsored
Battersea Power Station

Battersea Power Station

Rapid Access Ltd

Battersea Power Station, Circus Rd W, Nine Elms, London SW11 8DDThe iconic Grade II* listed Battersea Power Station is NOW OPEN as London’s most exciting new shopping and leisure destination! This legendary London landmark and surrounding area has been brought back to life as one of the most exciting and innovative mixed use neighbourhoods in the world – a place for locals, tourists and residents to enjoy a unique blend of shops, bars, restaurants, leisure and entertainment venues, parks and historical spaces. A place to shop, eat, drink, live, work and play; here life doesn’t feel ordinary, it feels extraordinary.The Battersea Power Station regeneration project stands as an iconic symbol of urban revitalization in London. Preserving the historic architectural character while modernizing utility access was a formidable challenge. This case study showcases the successful collaboration between the Battersea Power Station regeneration project and Rapid Access Ltd, a leading supplier of Plaster-In Access Panels and Dual Access Panels designed to seamlessly integrate with the development.Challenges:1. Historic Preservation: The project required utility access solutions that respected the historical significance of the Battersea Power Station while modernizing its functionality.2. Architectural Integrity: The development needed to uphold architectural integrity and ensure minimal disruption to the building's aesthetics during the installation of access panels.3. *Functional Versatility: The vast and diverse spaces within the regeneration project demanded access solutions that could cater to different utility access needs.Solution:Rapid Access Ltd, recognized for their expertise in access solutions, was chosen to address the specific needs of the Battersea Power Station regeneration project. The solution included the installation of Plaster-In Access Panels and Dual Access Panels, designed to meet the following key criteria:1. Plaster-In Access Panels: Rapid Access Ltd provided access panels that seamlessly integrated with the historic architecture, preserving the building's aesthetics.2. Dual Access Panels: Dual Access Panels were deployed to provide versatility, ensuring seamless access to utility systems across various spaces within the development.3. Architectural Harmony: The access panels were meticulously customized to blend with the architectural design of the Battersea Power Station, ensuring that they harmoniously integrated with the historic structure.Implementation:The installation of Plaster-In Access Panels and Dual Access Panels by Rapid Access Ltd was executed with precision and expertise. The unique design of the panels allowed for seamless integration, while the dual access panels offered versatile solutions for various utility access points.Conclusion:The collaboration between the Battersea Power Station regeneration project and Rapid Access Ltd exemplified the successful integration of utility access solutions into a historically significant and iconic development. The installation of Plaster-In Access Panels and Dual Access Panels not only met functional needs but also contributed to the overall success of the Battersea Power Station regeneration, ensuring architectural preservation and operational efficiency. This case study underscores the importance of selecting the right access solutions provider for historically significant architectural projects.
Sponsored
Lock Guide

Lock Guide

Rapid Access Ltd

Our access panels and riser doors are available with many different lock types for all your security needs. From low level security locks to high level security making any access panel as secure as the customers needs.
Sponsored
Overlay to Raised Access Floor - Knauf GifaFloor FHB18

Overlay to Raised Access Floor - Knauf GifaFloor FHB18

Access Floors Distribution

60 London Wall is an icon mixed use office & retail building in the dynamic heart of London’s City, with 328,500 sq ft of grade A office accommodation situated over ten stunning floors. It was recently completely renovated and Alliance Bernstein now occupy space within the building. The existing raised access floor was overlaid with Knauf GifaFloor FHB18 making it the ideal substrate to receive a combination of ceramic tiles & micro-screed cement
Sponsored
55 Whitehall, London - Knauf Hugo18 - Overlay to existing Raised Access Floor

55 Whitehall, London - Knauf Hugo18 - Overlay to existing Raised Access Floor

Access Floors Distribution

55 Whitehall was previously a Government occupied office space. This iconic building has undergone a complete re-design. There was existing steel encapsulated raised access flooring throughout. Rather than remove or replace the raised floor, it was retained. Hugo18 was specified here to use as an overlay solution to the raised access floor. It offers a non-combustible, high performance substrate for a range of finishes, in this case - ceramics
Sponsored
One Bishopsgate Plaza

One Bishopsgate Plaza

Profab Access Ltd

Profab Access proves its worth at One Bishopsgate Plaza Situated in the centre of the City of London, One Bishopsgate Plaza is one of the first high-rise residential and hospitality developments to be built in the capital for a number of years. Once construction has been completed, the flagship 43-storey tower will house London’s first luxury 5* Pan Pacific Hotel, which will comprise of 237 rooms, an indoor swimming pool and a 370 capacity Pacific Ballroom, Square Mile’s first dedicated ballroom. From levels 21 to 41, the development will house 160 luxury one, two and three bed residential apartments, or ‘Sky Residences’, which will boast panoramic views of some of London’s most iconic landmarks. As part of the construction process, over 200 steel riser doors from Profab Access in a range of door leaf configurations and sizes from its INTEGRA 4000 Series, combined with over 300 bespoke ceiling panels from its ECHO 7000 Series, are currently being installed throughout the entire tower by BDL Dry Lining. Specified due to their impressive seamless integration into masonry walls, shaft walls and drywall partitions, the riser doors provide discreet and secure access that won’t impact on the overall interior design scheme of the development, a main consideration for the public and private areas of the hotel.The INTEGRA 4000 Series’ third party CERTIFIRE bi-directional certification from Warrington Fire was also a leading factor for specification, as the riser doors are fire tested from both sides to two hours, providing the highest standard of evidence for fire safety performance.All of the doors were supplied with comprehensive CERTIFIRE accreditation documentation as evidence of Profab Access’ up to date fire testing, providing both the specifiers and contractors responsible for the development with absolute confidence in the performance of the critical fire integrity products.The INTEGRA 4000 Series is independently bi-directionally fire tested and certified by an accredited third party, to ensure legal compliance.A combination of one and two hour fire rated riser doors were chosen to be installed throughout all residential and communal areas of the building to not only achieve compliance with current regulations by eliminating the spread of fire throughout the building for the specified durations, but sufficiently future proof the building for years to come. The bespoke Profab Access ECHO 7000 Series Ceiling Access Panels have also been specified for installation throughout the hotel bedrooms and communal areas to provide concealed and maintenance free access to the ceiling shafts. Due to the significant size of the ceiling access panels, which span up to 1100mm x 1800mm, Profab Access developed a bespoke additional safety system that featured a one side lift out and one side swing/push latch mechanism. The innovative design assisted BDL Dry Lining’s team of engineers in stopping the heavy doors swinging from the ceiling, while also enabling the panel design to work within a reduced space. BDL Dry Lining is one of the largest specialist dry lining contractors in the UK and has been an installer of Profab Access riser doors and access panels on high profile commercial and residential projects for a number of years. Tony Grayson, Project Manager at BDL Dry Lining, said: “This is a standout development to be involved with and we knew from the very beginning that Profab Access would be our go to supplier for this project. “Over the last two years we have worked closely with Profab Access’ team of Specification Managers and Engineering experts to deliver and install the riser doors and ceiling access panels throughout the 41 storeys. The access solutions are extremely easy to install and offer the highest standards in performance, quality and compliance for unfaltering consistency across the entire site.”The riser doors are also 35dB acoustic rated, smoke sealed and airtight to Part L. In the event of a fire, the doors will maintain their frame and integrity for up to two hours, limiting the spread of fire and transmission of radiant heat for this period of time. The doors’ intumescent smoke seals also enables occupants to safely exit the building, whilst subsequently minimising potential damage to other areas of the construction. By specifying the CERTIFIRE bi-directionally fire tested INTEGRA 4000 Series Riser Doors, the development is actively future proofed as the comprehensive testing certification provides a complete and transparent audit trail of due diligence that evidences the products are not only fit for purpose, but meet the duty of care required to ensure legal compliance.  Marcus Parnham, Commercial Director at Profab Access, said: “As One Bishopsgate Plaza is such a unique building, it required a bespoke approach that ensured the access solutions we provided were not only fit for purpose, but superseded expectations. “That’s why every element of the ceiling and wall access products have been individually considered, from the additional safety systems on the ceiling access panels, to the Euro Cylinder locks on the riser doors to prevent unauthorised access. The result is a complementary suite of solutions that provide unobtrusive access, without compromising on aesthetics.”Profab Access’ comprehensive portfolio of access panels and riser doors are manufactured in-house at its headquarters in Atherstone and are supplied with impressive lead times throughout the UK. The products are supported by a wide range of BIM Level 2 and CAD files to aid the specification process and streamline the initial design stages.Manufactured in accordance with ISO 9001, the INTEGRA 4000 Series Riser Doors and ECHO 7000 Series Ceiling Access Panels can be specified and installed in a range of configurations to meet each project’s specific measurements and requirements.For further information on Profab Access and its range of riser doors, access panels, and steel doors, call +44(0)1827 719051 or visit www.profabaccess.com.
Sponsored
Fire Information

Fire Information

Rapid Access Ltd

Product constituents: To meet UK fire standards the Access Panels manufactured have been tested by Warrington Fire and hold a 120-minute fire rating certificate.
Sponsored
Leighton House Museum - Junckers Black Oak flooring

Leighton House Museum - Junckers Black Oak flooring

Junckers Ltd

Following an £8m transformation, the Grade II listed Leighton House has reopened to the public. The former home of artist Frederick Leighton, a previous president of the Royal Academy, the building is famed for its opulent interiors, filled with art and treasures acquired by Leighton on his travels. Architects BDP restored and adapted the historic building to include a new entrance, gallery, learning centre and café with significantly improved, step-free access throughout the museum. The sensitive restoration has both preserved the original integrity of the house and transformed the way it is used by visitors, meeting the needs of a modern-day museum. The restoration and new additions to Leighton House sit in complete harmony with the original interiors. The use of high-quality design and materials throughout reflects the rich visual language created by Leighton. Junckers Black Oak flooring, specified for its rich, dark tones, forms a warm and tactile backdrop to several areas. David Artis, Architect Director, BDP described the design process: ‘It’s about subtle interventions that don’t detract from the overall legibility of the building.’ Junckers Approved Flooring Contractor PICA Floorings installed Black Oak Boulevard, a 185mm wide plank floor in several areas of the museum, including as treads and risers for the bespoke helical staircase spanning three flights. The staircase installation included stainless steel non-slip inserts on every tread and elsewhere the Black Oak flooring was fitted over underfloor heating which was incorporated within the subfloor after close consultation at the design stage. In addition, PICA Floorings made bespoke access hatches required by the museum to enable moving artworks from one area to another. To ensure minimal waste during the installation process, materials were delivered to site in stages. Restoring and adapting existing buildings forms an important part of designing and building in a more sustainable way. By upgrading older properties and making them net zero carbon ready, historic and heritage buildings are safeguarded and ensured a sustainable future. Junckers solid hardwood flooring, a material which is naturally low in embodied carbon, forms an integral part of the project with its proven long lifespan. Expected to last well over 60 years, the floor forms part of the design to future-proof the museum.The importance of high ethical standards is often a key objective for materials sourcing, particularly for publicly funded projects. BDP was able to rely on Junckers’ sustainably sourced and manufactured wood flooring complete with sustainability credentials including EPDs, FSC®, PEFCTM and Indoor Climate certification as well as a BRE Green Guide rating of A+.
Sponsored
Natural History Museum

Natural History Museum

Rapid Access Ltd

The Natural History Museum in London is a museum that exhibits a vast range of specimens from various segments of natural history. It is one of three major museums on Exhibition Road in South Kensington, the others being the Science Museum and the Victoria and Albert Museum. The Natural History Museum's main frontage, however, is on Cromwell Road. The Natural History Museum in London stands as a revered institution, renowned for its priceless collections and historical significance. Ensuring the protection of both its artifacts and the safety of its visitors is of paramount importance. This case study highlights the successful collaboration between the Natural History Museum project and Rapid Access Ltd, a trusted supplier of Riser Doors equipped with Fire Door Keep Lock Shut Signs and advanced 3-Way Locking Systems, bolstering fire safety and security.Challenges:1. Fire Safety and Security: Preserving the museum's invaluable collections and ensuring the safety of its visitors demanded robust fire safety measures and enhanced security.2. Architectural Sensitivity: The project necessitated access solutions that respected the museum's architectural and historical significance, ensuring minimal disruption to its aesthetics.3. Advanced Locking Systems: The museum sought advanced security measures to protect against unauthorized access and potential threats.Solution:Rapid Access Ltd, known for their expertise in access solutions, was selected to address the specific requirements of the Natural History Museum project. The solution included the installation of Riser Doors featuring Fire Door Keep Lock Shut Signs and advanced 3-Way Locking Systems, designed to meet the following key criteria:1. Riser Doors: Rapid Access Ltd provided riser doors that seamlessly integrated with the museum's architecture while offering secure access to utility areas.2. Fire Door Keep Lock Shut Signs: Prominent signage was installed to ensure that fire doors remained locked shut when not in use, promoting fire safety awareness within the museum.3. 3-Way Locking Systems: Advanced locking systems were incorporated to provide an extra layer of security, protecting against unauthorized access and potential security threats.Implementation:The installation of Riser Doors with Fire Door Keep Lock Shut Signs and 3-Way Locking Systems by Rapid Access Ltd was carried out meticulously, ensuring that the security measures were seamlessly integrated into the museum's architectural framework.Conclusion:The collaboration between the Natural History Museum project and Rapid Access Ltd exemplified the successful integration of fire safety and security measures into a historically significant and culturally important institution. The installation of Riser Doors with Fire Door Keep Lock Shut Signs and 3-Way Locking Systems not only met the museum's fire safety and security needs but also preserved its architectural integrity. This case study underscores the importance of selecting the right access solutions provider for projects that require a sensitive and integrated approach to safety and security in a historical setting.
Sponsored
St Lawrence Academy

St Lawrence Academy

Paxton Access Ltd

Paxton10 Provides Multi-Site Access Control for Academy TrustLocation:North Lincolnshire, UKType of site:EducationNumber of users/doors:166 users30 doorsThe St Lawrence Academy is a school for 11- to 16-year-olds, located in North Lincolnshire, UK. The school is currently undergoing an expansion, so they looked for an access control system that would provide an extra level of security for their pupils and staff, and could add new buildings and users to the system as the school grows.Advanced IT Services was approached by St Lawrence Academy with the requirements, and they suggested Paxton10, a forward-thinking access control and video management system.Advanced IT Services is an end-to-end IT solutions provider that has over 20 years of experience in the education sector and has installed Paxton security products for over 10 years. They support schools and councils nationwide, providing solutions from access control, video management, to IT support
Sponsored
Successful collaboration with NBS - Access 360

Successful collaboration with NBS - Access 360

NBS

Christian Baker‐Smith, Divisional Specification Manager at Access 360 – manufacturer of roof, ceiling, wall and floor access products – describes how NBS platforms are helping to reduce workloads and support successful collaboration with specifiers.Access 360 is a division of Tyman plc, comprising Bilco UK, Profab Access and Howe Green. It provides a total manufacturing solution for roof, ceiling, wall and floor access products – both fire-rated and non‐fire-rated – to the construction industry. Those products and technical data can be found on NBS Source. Access 360 works closely with specifiers to support the initial design and specification stages through the supply of technical documentation, digital (BIM) object models and complete specification clauses. By also working in conjunction with clients to handle the technical drawings and full manufacturing design elements from the initial stages of a project through to delivery, all necessary information is provided in the clearest and most accessible format possible.As part of a recent webinar on Collaborative Specification Writing, Access 360’s Divisional Specification Manager, Christian Baker‐Smith, explained how the three businesses are benefitting from NBS platforms, namely manufacturer product platform NBS Source and cloud‐based specification platform NBS Chorus.“NBS Source offers Access 360 a readily available source of technical data for our customers. When coupled with NBS Chorus, we can provide architects and specifiers with a complete suite of technical information to help them specify their projects”, Christian said.Each of the three divisional companies can create specification documents using NBS Chorus and track each project independently. When working with an architect that is specifying access solutions from one or more of its brands, Chorus enables Access 360 to compile this into a single project pack for the architect in the format they require."As Chorus enables us to easily access our projects and subsequent clauses, it makes updating specifications extremely quick and easy.”Another benefit of Chorus is the level of consistency it provides. Christian continued:“Before using NBS Chorus, documentation may not have been updated, leading to a risk of incorrect data being issued. This required a significant amount of time to check standard documents. The format of the documents would also look different, depending on which of the business divisions created it. Now, NBS Chorus has removed the requirement to review and update our clauses, as this happens automatically within the software and allows us to present documents to the marketplace in a uniform format, which is really important.”For every new product launch or upgrade which changed performance of existing products, it would require a significant amount of work to set up the documentation. However, with Chorus, Christian says that writing specification documents is significantly easier, as all products are easily located under the Uniclass reference on NBS Source and within NBS Chorus.We used to have a review period every quarter to check that all the documentation was correct and check everyone’s laptops were up to date. Using NBS Chorus has led to a considerable cost saving for the business in this area as we know that we can totally rely on Chorus to be up to date with the latest information our clients require."Christian also highlighted the feature in Chorus Revisions as an additional factor for boosting Access 360’s efficiency:“It’s much easier to make revisions on Chorus. Previously, you could easily lose a specification set when a client changed something, whereas all of the information is now held on a centralised system, which makes it quick and easy to update. I can’t stress enough how great of a benefit NBS Chorus has been to the business."
Sponsored
Sixty London Wall

Sixty London Wall

Profab Access Ltd

Located within the epicentre of central London, Sixty London Wall delivers high quality Grade A office accommodation combined with superior retail opportunities, all housed within a visually striking contemporary development that stands apart from neighbouring buildings.Delivering 325,000 sq. ft of premium office space over 10 floors, the extensively renovated property offers collaborative working areas, bolstered by first class end of journey facilities for commuters, including 380 cycle spaces and lockers and 38 showers and changing rooms.As part of the construction process, almost 500 Profab Access high quality riser doors and access panels have been installed throughout the entire building by specialist carpentry, joinery and fit-out contractors, JJ Sweeney.Specified in a range of sizes and configurations for installation throughout the communal areas and washrooms on every floor, Profab Access’ robust and resilient INTEGRA 4000 Series and VISION 8000 Series fire-rated Riser Doors provide concealed access to mechanical and electrical services.
Sponsored
Humberside Fire and Rescue Service

Humberside Fire and Rescue Service

Paxton Access Ltd

PaxLock Pro, Net2 and Entry Provide Robust, Wireless Access ControlHumberside Fire and Rescue Service is responsible for the fire and rescue service across the East Riding of Yorkshire, Kingston upon Hull, and North and North East Lincolnshire, serving a population of almost one million people. Providing a professional and skilled emergency response service; 24 hours a day, 365 days a year, Humberside Fire and Rescue Service also offer a range of other services and functions, including assistance with animal rescue, dangerous chemical spillages, local and wide area flooding, road traffic collisions, aircraft and railway incidents.RequirementThe Fire and Rescue Service required an access control solution that could secure multiple sites on a single system. The system needed to be robust and reliable, to maintain the security of the premises whilst allowing ease of entry and exit when responding to an emergency. Flexible access permissions across 12 of the fire stations in the region were also essential.Humberside Fire and Rescue Service worked with Delta Security Systems Ltd to recommend an access control solution that could meet their requirements. Based in Hull, Delta Security Systems supply electronic security systems for domestic and commercial use. They recommended Paxton’s flagship access control system; Net2, with PaxLock Pro; wireless access control in a door handle, and Entry; IP video door entry.Type of sitePublic Sector; Emergency Response LocationHull, UK Number of sites/doors/users12 sites260 doors300+ users Solution requiredManage and control access to all fire stations in the regionFlexible access permissions for short term site accessPin and token authentication for increased site security ResultRead in/read out access control providing fullaudit trail of who is on siteSecure fully manned and on-call stations withcentralised access managementRobust, multi-site access control solutionCentral management with remote access capabilities Paxton products usedPaxLock ProNet2 Plus ControllersNet2Air BridgeNet2 SoftwareEntry Standard panelEntry Standard MonitorP50 ReadersKP75 Readers
Sponsored
Parkgate Hotel, Cardiff

Parkgate Hotel, Cardiff

Profab Access Ltd

Profab Access adds a five star finish to Cardiff’s newest luxury hotelLeading riser door and access panel solution supplier, Profab Access, has proven its first-class credentials once again as part of the recent completion of a major specification at Cardiff’s new 5-star Parkgate hotel. Located next to the Welsh Capital’s famous Principality Stadium, the Parkgate hotel has been designed to provide a luxurious experience for rugby fans, in addition to city dwellers visiting the country all year round. Widely coined as Cardiff’s most lavish new location, the hotel includes 170 guest bedrooms and suites, a signature restaurant and bar, a traditional tea lounge and a rooftop spa overlooking the city skyline. As part of the prestigious build, a unique collaboration between the Welsh Rugby Union, property developer, Rightacres, and The Celtic Collection, the hotel required an extensive riser door specification, with safety, high performance and aesthetic appeal key considerations.In total, 310 Profab Access VEGA 1500 Fire Rated Riser Doors were specified for installation by Hazelwood Carpentry throughout every part of the building, including communal areas and the hotel’s vast range of luxury guest rooms and suites.The VEGA 1500 Series Riser Doors offer the highest standards of fire safety, extensively tested by Efectis in France and Ireland to provide a bi-directionally fire tested product that is available in both single and double door configurations.  This means the riser door sets are fire tested from both sides to 60 minutes, providing the specifiers, contractors and hotel guests residing within the building with confidence the critical fire integrity products offer the highest standard and most up to date evidence for fire safety performance.The range also features a slimline, neat construction, whilst its proven technology ensures permanent, safe access to mechanical and electrical services housed within the riser core. This provides first class functionality and safety, without compromising the overall interior concept.The steel riser doors also streamlined the installation process, as the quick release pivot hinge and light weight enabled easy handling, allowing Hazelwood Carpentry to complete the job quickly and optimise overall project efficiencies.Jamie Homer, Senior Site Supervisor at Hazelwood Carpentry, said: “As a remarkably impressive build designed to bring a new age of modern luxury to Cardiff’s historic setting, it was important we used the most innovative, highest quality products.“From the start it was clear that there was no contender to Profab Access and its unrivalled capabilities when it comes to high performance, quality fire rated riser doors.“The Profab Access team recommended the VEGA 1500 Series, which proved a fantastic choice, as it was incredibly easy to install and offers a superb finish, whilst ensuring the highest standard of fire integrity. Plus, being manufactured in the UK ensured quick lead times, which was essential in keeping the project on track for its opening this autumn.“As usual, the team, who we have worked with many times before, were incredibly helpful and quick to respond to any queries. Needless to say, we look forward to working with Profab Access again on future projects to come.”In the event of a fire, the VEGA 1500 Series Riser Door sets will maintain the frame and integrity for up to 60 minutes, preventing the spread of fire throughout the property for this period of time.The riser doors are 31dB acoustic rated, smoke sealed and airtight to Part L, whilst also featuring intumescent smoke seals that enable occupants to safely exit the building. By specifying bi-directionally fire tested VEGA 1500 Series Riser Doors, the development is actively future proofed as the comprehensive testing certification provides a complete and transparent audit trail of due diligence that evidences the products are not only fit for purpose but meet the duty of care required to ensure legal compliance.Marcus Parnham, Commercial Director at Profab Access, said: “At a time when the hospitality sector has been subject to so much disruption, the Parkgate hotel will play a key role in attracting rugby fans during the peak international season and revitalising the city’s appeal to visitors looking for the ultimate luxury stay.“The pedigree of our VEGA 1500 Series fit the brief perfectly. Combining functionality and visual appeal, the specification has enabled great performance without comprising aesthetics. More importantly, the specification of our bi-directionally fire tested line ensures the building features the highest levels of riser shaft fire protection currently available on the Irish and UK markets.” Profab Access’ diverse portfolio of riser doors and access panels are supported by a wide range of BIM Level 2 and CAD files to aid the specification process and streamline the initial design stages.Manufactured at Profab Access’ Atherstone headquarters in accordance with ISO 9001, the 1500 Series Riser Doors can be specified and installed in a range of configurations to meet each project’s specific measurements and requirements. For further information on Profab Access and its range of access panels, riser doors and steel doors, call +44(0)1827 719051 or visit https://www.profabaccess.com.
Sponsored
Fixed utilitarian access system - permanently-fixed vertical access ladder to Museum of Science & Industry - Manchester

Fixed utilitarian access system - permanently-fixed vertical access ladder to Museum of Science & Industry - Manchester

Safety Fabrications Limited

The Ascent Aluminium fixed ladder system was specified to create a permanent safe access route to the roof for maintenance personnel. As the fixed access ladder was to be installed in a prominent location adjacent the buildings front entrance there was a requirement to ensure that access was restricted with the specification of an anti-climb ladder guard & bottom hoop cover. Hoops were provided throughout for fall protection. The ladder was designed in accordance with BS EN 4211:2005 + A1 2008 and was manufactured in accordance with CE 1090 factory production control procedures.
Sponsored
Sixty London Wall - Podcast

Sixty London Wall - Podcast

Profab Access Ltd

Profab Access sets the standard for specification at Sixty London Wall’ . In this podcast you will learn how, as part of the construction process, almost 500 Profab Access high quality riser doors and access panels have been installed throughout the entire building, specified in a range of sizes and configurations for installation throughout the communal areas and washrooms on every floor.
Sponsored
Perimeter protection and access control for storage facility

Perimeter protection and access control for storage facility

Jacksons Fencing

Access Self Storage is one of the largest self storage companies in the UK with over 20 years experience and 50 stores nationwide. Access Self Storage Twickenham is situated on Rugby Road and serves the storage needs of Twickenham, Richmond upon Thames, West London and Surrey. The site offers 24 hour access, large vehicle access and customer parking; as such it is important that site has a secure perimeter with controlled gated access. Jacksons were specified to install Barbican Imperial® fencing and gates combined with EuroGuard® Regular Mesh in order to improve access control and perimeter security at the site.
Sponsored
Access Flooring for Cheltenham Offices

Access Flooring for Cheltenham Offices

Bathgate Flooring Ltd

Access flooring once again was selected for this major £12 million building in Cheltenham. Bathgate Flooring manufactured and installed over 5600m2 of Panels to ensure that this Grade A office space offered the maximum flexibility. Products Used BGM 600 Steel Encapsulated Panels Constructing this Office Development is well recorded with a time lapse video of the entire project available through the Gloucestershire Live news story. Access Flooring is used in buildings like this to ensure that there is easy access to the services if needed. Simply lift up the floor panels and all the cabling is visible beneath.

Showing 73-108 of 108

Feedback