Fully drained and back-ventilated rainscreen facade system, with a choice of integrated panels which are fitted to the adjustable PSP Matrix-T carrier system.
For fixing to a structural wall.
Only for installation by competent design/ installation contractors.
Please ensure to accommodate for deviations in the primary support structure.
Fully drained and back-ventilated rainscreen facade system, with a choice of integrated panels which are fitted to the adjustable PSP Matrix-T carrier system.
Features and benefits:
PSP Architectural have passed the following tests which are required by the CWCT for rainscreen systems:
Consult manufacturer for further details.
Applications:
For fixing to a structural wall.
Only for installation by competent design/ installation contractors.
Please ensure to accommodate for deviations in the primary support structure.
Uniclass 2015 | |
CAWS | H92/120 Rainscreen cladding |
Product Reference | PSP Matrix IP Interlocking Panel System |
Design | Insert drawingInsert reference |
Support | - |
Primary structure/ substrate | Concrete framingDense concrete blockwork/ brickworkLightweight steel framingStructural steel framingTimber frame |
Secondary support/ frame | Metal rail Matrix-T adjustable carrier system |
Panel | - |
Panel Type | CNC pressedRolled |
Material | Aluminium substrate of 1000 series alloyAluminium substrate of anodizing quality (i.e. J57S)Consult manufacturer for details. Galvatite substrate of hot-dipped zinc coated steel to BS EN 10147ZINCCopperStainless Steel |
Finish | HPS200AnodizedNatural pre-weatheredPolyvinylidene Fluoride (PVDF)Post powder-coatedConsult manufacturer and insert colour requirement. Prisma®Insert colour requirement. |
Thickness | 0.7 mm0.8 mm0.9 mm1.0 mm1.2 mm2.0 mm |
Vapour control layer (VCL) | - |
Type | Polyethylene with reinforced high-density polyethylene (HPDE) gridMinimum vapour resistance of 530 MNs/g. |
Penetrations and abutments | Seal to vapour control layer. If necessary prime substrates to achieve full bond |
Sheet laps | Not less than 150 mm, seal with tape |
Sheet tape | - |
Type | Double sided sealant with vapour resistivity not less than the vapour control sheet |
Thermal insulation | - |
Material | Consult manufacturer and insert requirements. |
Thickness | Consult manufacturer and insert requirements. |
Installation method | Consult manufacturer and insert requirements. |
Breather membrane | - |
Type | Spun bond polypropylene membrane |
Penetrations and abutments | Attach to breather membrane with tape. Achieve full bond |
Laps | Not less than 150 mm, bond with tape. Achieve full bond |
Tape | As recommended by breather membrane manufacturer |
Joint | - |
Joint type | Reveal jointsNo sealant to be used. |
Joint width | 5 mm (horizontal and vertical reveals)10 mm (horizontal and vertical reveals)15 mm (horizontal and vertical reveals)20 mm (horizontal and vertical reveals) |
Cavity fire barrier | Consult manufacturer and insert requirements. |
Mechanical fixings | AluminiumCompliant with BS 1474 and BS EN 755. Mild steelTo BS 4190, suitable for galvanizing or other protective coating. Consult manufacturer for details. Stainless steelTo BS EN ISO 3506 grade A2 generally, grade A4 when used in severely corrosive environments. |
Fasteners | Stainless steelConsult manufacturer recommendations and details. |
Sealant | One part polysulfide to BS 5215One part polyurethaneSilicone to BS 5889Two part polysulfide to BS 4254Two part polyurethane |
Accessories/ Other requirements | Not requiredStainless steel fixing clipsFor panels over 1800 mm long. |
Standard product features | Aluminium framing sections: Manufactured in accordance with BS EN 755 alloy EN AW-6063, and suitable for the specified finish. Structural members to comply with BS 8118. Air gap: ≥38 mm. |
Product Options | Design: Required information includes:
Support: - Secondary support/ frame: Includes 3 mm-thick aluminium brackets with 2 mm-thick aluminium vertical ‘T’ and ‘L’ rails, extruded to BS 1474 Vapour control layer (VCL): To be installed with no breaks and minimum joints. Thermal insulation: Exact thickness can be determined by thermal analysis of complete wall build up. Consult manufacturer for details. Breather membrane: Junctions at flashings, sills, and gutters. Overlap and allow free drainage to exterior. Accessories/ Other requirements: A range of other accessories is available. Consult manufacturer for details and insert requirements. |