Development is underway at Frasers Tower, Singapore with many offices being snapped up by major worldwide companies.
Shiseido, the Japanese cosmetics group have taken 50,000 sq ft, Arup engineering and environmental consultancy company have taken 40,000 sq ft, Microsoft have taken 125,000 sq ft and French energy giant, Total have leased over 100,00 sq ft at the Tower in Singapore.
The Genesis stair nosing, NHD24 has been specified to be used on all stair cases within the Total Oil floors. NHD24 is a rakeback nosing that provides excellent slip resistance whilst looking smart and stylish.
Ingen utvalgte produkter i denne nyheten
Kontakt Genesis Global Systems Limited ved å klikke på knappen under for å finne ut hvilke produkter som ble brukt i denne casen.
Mer inspirasjon fra Genesis Global Systems Limited