Waterproofing Gateshead Leisure Centre Case Study

Case study

Waterproofing Gateshead Leisure Centre Case Study

by Sika Limited

Following decades of usage, the Gateshead Leisure Centre, Tyne and Wear, was suffering from age. To repair its badly leaking pool and restore the entire facility to its former glory, it was shut for a year so that a multi-million pound refurbishment scheme could be completed. A combination of the renowned Sika®-1 aterproofing System and Sikadur® Combiflex®, from global construction material producer Sika®, was chosen to ensure that following the remedial works, the swimming pool would remain watertight for decades to come.

No featured products in this Case study

Contact Sika Limited by clicking the button below to find out which products were used in this Case study.

More literature from Sika Limited

View all literature (49)
Waterproofing Hugo Boss Case Study

Waterproofing Hugo Boss Case Study

Waterproofing Ashmolean Case Study

Waterproofing Ashmolean Case Study

Waterproofing Crystal Palace Case Study

Waterproofing Crystal Palace Case Study

Sikafloor 14 Pronto

Sikafloor 14 Pronto