Case study
Case study
Currently one of the largest open loop installations in the UK, capable of drawing 30 litres per second from the ground. Vinci Constructions UK approached Ecovision to design a renewable energy system that could allow the new building to benefit from the huge aquifer below the ground as the Daresbury site is located on the unconfined Triassic Sandstone, a major UK aquifer, which in this location is in excess of 500m in thickness.
Contact Glen Dimplex Heating and Ventilation by clicking the button below to find out which products were used in this Case study.
3. Commercial Brochure
A. Q-Rad Electric Radiator
1. Quantum High Heat Retention Storage Heater
F. Opti-V Brochure