Case study
Case study
Roofdec Ltd's Contracts Director Bob Richardson explains why the Protan Prefabricated system was installed on a number of brand new schools built in and around Telford.
Contact Protan (UK) Ltd by clicking the button below to find out which products were used in this Case study.
SINTEF Technical Approval 2008 for Protan G, GG and GT Membranes
Protan (UK) Ltd Vacuum System
Protan (UK) Ltd Green and Protected Systems
Why PVC Is Now a Top Green Roofing Solution