Telford Schools' Protan Prefabricated Systems

Case study

Telford Schools' Protan Prefabricated Systems

by Protan (UK) Ltd

Roofdec Ltd's Contracts Director Bob Richardson explains why the Protan Prefabricated system was installed on a number of brand new schools built in and around Telford.

Preview

No featured products in this Case study

Contact Protan (UK) Ltd by clicking the button below to find out which products were used in this Case study.

More literature from Protan (UK) Ltd

View all literature (32)