Case study
This literature item is no longer available.
Case study
Having worked with architects Marshall and Kendon on the Clifton Lido, Fineline was askedto help with the development and design of the glazing to be installed on a listed spa buildingin Reading. Following the transfer of thebuilding and land from local authority to private ownership, the project took over three years to complete. The complex containing a new health spa, swimming pool and restaurant was opened in 2017 after extensive renovation and alterations that included design changes.
Contact Fineline Aluminium Ltd by clicking the button below to find out which products were used in this Case study.