Case study
This literature item is no longer available.
Case study
The relocation of the local waste and recycling centre to make way for the £357 million Emirates stadium at Ashburton Grove posed technical challenges. PUDLO waterproof systems worked with the project team to provide a solution for high abrasion, durable, waterproof concrete. Opened in 2004, the three-storey £60m facility provided a brand new, multipurpose waste transfer and recycling hub for the London borough of Islington and the North London Waste Authority (NWLA)
Contact PUDLO Waterproof Systems & Cemfree Zero-Cement Concrete, part of the DB Group Ltd by clicking the button below to find out which products were used in this Case study.