Case study
by H+H UK Ltd
A prestigious development of five luxury apartments constructed to Passivhaus principles using the H+H Thin-Joint System. Masonry Frame Systems specified H+H Jumbo Bloks primarily because it is what was needed to meet the demands of this Passivhaus construction. H+H Jumbo Bloks offer an advanced thermal performance which adheres to Passivhaus standards.
Contact H+H UK Ltd by clicking the button below to find out which products were used in this Case study.
BBA Certificate of Conformity F012i5-2
LABC Certification
01/3816 Celcon aircrete blocks and thin-joint system
05/4275 Celcon standard blocks for floor infill