Case study
This literature item is no longer available.
Case study
by H+H UK Ltd
Contractor Robert Bishop from RT Bishop, required a swift construction solution as a replacement for timber frame that his team could successfully use to deliver the project on time. H+Hs RĂ¥ Build method, using the Thin-Joint System and a combination of H+H Jumbo Bloks and Celcon Foundation Blocks provided the perfect solution.
Contact H+H UK Ltd by clicking the button below to find out which products were used in this Case study.
Structural Masonry
Cameron Close - Isle of White
Case Study - Chantry Hall: mixed use development
Case Study - Miller Zero, Basingstoke