NBS Source
I'm a manufacturer
Licata LicaPlan  Premixed Screed

Product data sheet

Licata LicaPlan Premixed Screed

by Licata Building Systems Ltd

Lica Plan is specifically for the realisation of traditional screeds in both indoor and outdoor environments, on existing and new slabs, as well as for small repairs and renovations of the screed. Ceramics can be applied after 24 hours. Natural stone after 48 hours | carpet – 4 days | wood – 7 days (with residual humidity <2%) | PVC – 7 days (with a residual humidity <2%) | linoleum – 7 days (with a residual humidity <2%) | parquet – 7 days (with a residual humidity <2%) | resins – 7 days (with a residual humidity <2%).

No related products in this Product data sheet

Contact Licata Building Systems Ltd by clicking the button below to find out which products were used in this Product data sheet.

More literature from Licata Building Systems Ltd

View all literature (86)
Licata EPS Grey Insulation

Licata EPS Grey Insulation

Licata Rock Wall Insulation

Licata Rock Wall Insulation

14/5120 GREUTHERM MW EXTERNAL WALL INSULATION SYSTEM

14/5120 GREUTHERM MW EXTERNAL WALL INSULATION SYSTEM

14/5120 GREUTHERM EPS EXTERNAL WALL INSULATION SYSTEM 1

14/5120 GREUTHERM EPS EXTERNAL WALL INSULATION SYSTEM 1