Case study
This literature item is no longer available.
Case study
by ecodek
The updated terraced area has been specifically designed so visitors can enjoy uninterrupted views across the lake. Additional anti-slip inserts were used as this was a high traffic public area in wetlands. The Centre had major refurbishment in 2012 to become a dedicated information and advice point, welcoming visitors and showcasing the wonderful wildlife of the reserve and its sister site at Lodmoor and of the wider borough. The installation of ecodek® with additional anti-slip inserts has also increased the accessibility for visitors in wheelchairs or with prams.
Contact ecodek by clicking the button below to find out which products were used in this Case study.