Case study
This literature item is no longer available.
Case study
We have particularly damp and humid conditions in our Rainforest Biome at the Eden Project, Cornwall. This results in the degrading of even high quality treated timber very quickly. Since its installation last winter the product has performed well with no sign of rotting or wear. The non slip inserts have remained 100% in place.
Contact Gripsure (UK) Ltd by clicking the button below to find out which products were used in this Case study.
Gripsure Standard Detail Drawings
Gripsure Non-Slip Decking Warranty Brochure
Gripsure SHERA Fire Rated Decking Brochure
Gripsure Accoya® Decking Brochure