Case study
Case study
City Tower, a private apartment tower block located in Canary Wharf required a new high performance waterproofing system as the existing single ply roof had been damaged beyond repair due to a fire.
Contact Proteus Waterproofing by clicking the button below to find out which products were used in this Case study.
CS_Pro-BW Plus_Knolly's House
CS_Proteus Pro-Cold_BMI The Blackheath Hospital
CS_Proteus Pro-Felt_CO-OP Wembley
CS_Pro-System Plus_Bloomsbury Mansions Russell Square