Case study
This literature item is no longer available.
Case study
We had a three week window to manufacture and deliver the stone from receiving the order. All the stone had to be installed before the grand opening of the store. The order comprised of a mixture of straight and radius copings. We provided various colour samples for the client to choose the suitable match. The order was fast tracked through the drawing department and following on from drawing approval, the units were manufactured and delivered to site on time.
Contact Procter Cast Stone by clicking the button below to find out which products were used in this Case study.