Case study
by H+H UK Ltd
Celcon blocks with Thin-Joint technology were chosen for ease of use. Balfour Beatty project manager Steve Penwill has used the system on an extension to his home and was very pleased with the results.
Contact H+H UK Ltd by clicking the button below to find out which products were used in this Case study.
BBA Certificate of Conformity F012i5-2
LABC Certification
01/3816 Celcon aircrete blocks and thin-joint system
05/4275 Celcon standard blocks for floor infill