Cameron Close - Isle of White

Case study

Cameron Close - Isle of White

by H+H UK Ltd

H+Hs Thin-Joint System has been used in the construction of a Passivhaus development of 16 semi-detached houses and 12 sheltered accommodation apartments at Cameron Close, Freshwater, on the Isle of Wight.

No featured products in this Case study

Contact H+H UK Ltd by clicking the button below to find out which products were used in this Case study.

More literature from H+H UK Ltd

View all literature (33)
BBA Certificate of Conformity F012i5-2

BBA Certificate of Conformity F012i5-2

LABC Certification

LABC Certification

01/3816 Celcon aircrete blocks and thin-joint system

01/3816 Celcon aircrete blocks and thin-joint system

05/4275 Celcon standard blocks for floor infill

05/4275 Celcon standard blocks for floor infill