Case study
Case study
by H+H UK Ltd
H+Hs Thin-Joint System has been used in the construction of a Passivhaus development of 16 semi-detached houses and 12 sheltered accommodation apartments at Cameron Close, Freshwater, on the Isle of Wight.
Contact H+H UK Ltd by clicking the button below to find out which products were used in this Case study.
Structural Masonry
Case Study - Chantry Hall: mixed use development
Case Study - Miller Zero, Basingstoke
Light Gauge Steel vs Thin-Joint masonry