NBS Source
I'm a manufacturer
Bloor Homes Case Study

Case study

Bloor Homes Case Study

by Calor Gas Ltd

When Biminster Homes began developing the Woodlands site at Edney Common in Essex on behalf on William Thompson Homes, mains gas was not available in the village. Biminster considered the range of alternative fuel options available for heating and hot water and selected LPG from Calor. As a regional house builder with a small project team, Biminster Homes needed an option that was viable from a cost and ease-of-installation perspective. This was the first time the company had developed an off-grid site, so it was important it made the right decision to encourage prospective buyers.

No related products in this Case study

Contact Calor Gas Ltd by clicking the button below to find out which products were used in this Case study.

More literature from Calor Gas Ltd

View all literature (20)
Linden Homes Case Study

Linden Homes Case Study

Muir Homes Case Study

Muir Homes Case Study

The Specifiers Guide to LPG

The Specifiers Guide to LPG

Holiday Parks

Holiday Parks