Case study
This literature item is no longer available.
Case study
by Sika Limited
Following decades of usage, the Gateshead Leisure Centre, Tyne and Wear, was suffering from age. To repair its badly leaking pool and restore the entire facility to its former glory, it was shut for a year so that a multi-million pound refurbishment scheme could be completed. A combination of the renowned Sika®-1 aterproofing System and Sikadur® Combiflex®, from global construction material producer Sika®, was chosen to ensure that following the remedial works, the swimming pool would remain watertight for decades to come.
Contact Sika Limited by clicking the button below to find out which products were used in this Case study.
Sikafloor 14 Pronto
Sika Joint Sealing Solutions in Stadia
Sikafloor 13 Pronto
Sikafloor 10 Pronto