NBS Source
Olen tuotetoimittaja

Thames Tideway Tunnel central section, London

YHTEENVETO

Overview

Heidelberg Materials has supplied the concrete used to cast the (precast) tunnel segments and provide the in-situ lining of the tunnel structure in the central section of the Thames Tideway project. Heidelberg Materials also supplied the concrete for other areas of the works in central section, not covered in this case study.

Tässä esitellyt tuotteet case-tutkimus

Näytä kaikki tuotteet (10)
FibreCrete - Fibre-Reinforced Concrete

FibreCrete - Fibre-Reinforced Concrete

Lisää inspiraatiota kohteelta Heidelberg Materials UK

Katso inspiraatiota
Uskmouth Substation

Uskmouth Substation

PowerCrete® - Offshore Inch Cape Wind Farm Landfall

PowerCrete® - Offshore Inch Cape Wind Farm Landfall

Broughty Ferry coastal walkway

Broughty Ferry coastal walkway

Guildford New Sewage Treatment Works

Guildford New Sewage Treatment Works

Lisää inspiraatiota kohteelta Valmisbetonituotteet

Katso inspiraatiota
Exposa - Royal Portrush Golf Club

Exposa - Royal Portrush Golf Club

Zircon - Private Dwelling

Zircon - Private Dwelling

PowerCrete® - Offshore Inch Cape Wind Farm Landfall

PowerCrete® - Offshore Inch Cape Wind Farm Landfall

Guildford New Sewage Treatment Works

Guildford New Sewage Treatment Works