Dura Grating Riser Installation | Case Study


Shard Place is the third phase of the £3.5 billion redevelopment of the estate next to London Bridge station, known as Shard Quarter. 


Reinforced concrete frame and groundwork specialists Getjar were appointed as the formwork contractor by the principal contractor Mace and chose the Dura Composites Riser Install team to take on some of the complex install challenges of the service risers.


Dura’s unrivalled expertise and full install capabilities meant they could deliver a bespoke solution for a large triangular shaped riser on all 26 storeys that required the use of galvanized steel supports and bracketing in conjunction with GRP Dura Grating to allow for cutouts to be performed whilst maintaining the integrity of the riser.

Tässä esitellyt tuotteet case-tutkimus

Näytä kaikki tuotteet (32)
Post-Fix Dura Riser System - Steel-supported GRP riser flooring

Post-Fix Dura Riser System - Steel-supported GRP riser flooring

d² Dura Grating Standard Mesh - GRP heavy-duty floor grating

d² Dura Grating Standard Mesh - GRP heavy-duty floor grating

Lisää inspiraatiota kohteelta Dura Composites Ltd

Katso inspiraatiota
Offshore Technician Training Facility, Grimsby

Offshore Technician Training Facility, Grimsby

Isle of Wight Platform Stations, UK

Isle of Wight Platform Stations, UK

Robroyston Station, Glasgow

Robroyston Station, Glasgow

Kings Cross Station, London

Kings Cross Station, London

Lisää inspiraatiota kohteelta Glass fibre-reinforced plastics (GRP) moulded open mesh gratings

Katso inspiraatiota
Offshore Technician Training Facility, Grimsby

Offshore Technician Training Facility, Grimsby

Noss-on-Dart Marina, UK

Noss-on-Dart Marina, UK

Luxury Car Valeting Centre, Belfast

Luxury Car Valeting Centre, Belfast

IFA2 Converter Station - GRP Products

IFA2 Converter Station - GRP Products