NBS Source
Olen tuotetoimittaja

DHL Supply Chain, Barming Depot in Aylesford

YHTEENVETO

210 Metres of Unifold Gutters was installed at the DHL Supply Chain, Barming Depot in Aylesford.

Installed by Blenheim Roofing, the project was a full strip & re-sheet of an asbestos cement roof.

During initial surveys it was discovered that historically, the existing asbestos gutters were prone to leaks and overflow issues into the building.

Unifold was not only used to line the gutters to cure the leaks but also increase the capacity.

Tässä esitellyt tuotteet case-tutkimus

Näytä kaikki tuotteet (2)
Unifold Gutter Lining System

Unifold Gutter Lining System

Lisää inspiraatiota kohteelta Ampteam Ltd

Katso inspiraatiota
Argos Distribution Centre, Castlegate, Wolverhampton

Argos Distribution Centre, Castlegate, Wolverhampton

Exxon Mobile

Exxon Mobile

HM Land Registry

HM Land Registry

Lisää inspiraatiota kohteelta Gutter linings

Katso inspiraatiota
First Bus Depot, Manchester

First Bus Depot, Manchester

Fortec Distribution Network, Daventry

Fortec Distribution Network, Daventry

Metal Roof and Gutter Coating - Well Lane, Wolverhampton

Metal Roof and Gutter Coating - Well Lane, Wolverhampton

Solihull - Metal Gutter Coating

Solihull - Metal Gutter Coating