OVERVIEW
Alperton Bus Depot is a mixed-use new development which includes commercial space aimed at supporting start-ups alongside 461 new homes, of which 40 percent will be affordable in the London Borough of Brent. The former Metroline bus garage is being transformed into three blocks, one of which is 27-storey, linked at the ground and first floors for community use and industrial floorspace. The development is due to be completed mid 2025.
Terrain FUZE Stax - HDPE Above Ground Drainage System
Terrain FUZE HDPE - HDPE Above Ground Drainage System
Water supply system installation within Towers D1 and D2 of Trinity Island Development.
Off-site prefabrication delivers off-the-scale results
New drainage system and stack replacement to residential flats in Birmingham.
Handling the pressure of a prestigious Manchester development.
Off-site prefabrication delivers off-the-scale results
Handling the pressure of a prestigious Manchester development.
A clear focus on customer requirements delivers ideal drainage solution for film factory development.