OVERVIEW
When delivering The Octagon, the world’s first pure octagonal high-rise residential building, the project required an acoustic flooring system capable of combining damp proofing, acoustic isolation and installation efficiency across 49 storeys.
Working alongside high-rise specialist Midgard, CMS Danskin Acoustics supplied a complete REGUPOL system comprising REGUPOL barrier 99-201 moisture vapour suppressant, REGUPOL adhesive 43-105 and REGUPOL sonus multi 3 acoustic underlay. The system was derived to meet the acoustic requirements of this landmark Build-to-Rent development while supporting the practical demands of a large-scale residential fit-out.
This approach provided a fast-drying, low VOC flooring solution that delivered damp proofing and impact sound control as part of a coordinated installation system across the building.
The Octagon is a 49-storey Build-to-Rent residential tower, requiring a flooring system capable of delivering consistent acoustic and
moisture control performance at scale.
Primary risks included:
units
storeys
installations
structure
A solution was needed that could:
THE SOLUTION
CMS Danskin Acoustics supplied a complete REGUPOL flooring system to deliver both moisture control and acoustic performance.
Moisture Vapour Control
1REGUPOL barrier 99-201
Applied directly to the subfloor
Two-part epoxy resin moisture vapour suppressant
Fast curing, low VOC formulation
Provides a stable substrate for floor finishes
Acoustic Floor Isolation
REGUPOL sonus multi 3
Installed above the barrier
layer
High-performance acoustic
underlay.Designed to reduce impact sound transmission
Installed using REGUPOL adhesive 43-105
By combining moisture suppression and acoustic isolation within a coordinated system, the solution simplified installation while ensuring consistent performance across all residential units.
THE RESULT
Following installation across all 49 storeys, the REGUPOL system
delivered consistent acoustic and moisture control performance
throughout the development.
The use of REGUPOL barrier 99-201 provided a reliable moisture
vapour suppressant, protecting floor finishes and enabling efficient
progression of follow-on trades.
Combined with REGUPOL sonus multi 3, the system achieved effective impact sound reduction while maintaining a streamlined installation process across multiple floors.
The coordinated system approach improved installation efficiency and ensured consistent performance, supporting delivery of a high-quality residential environment at scale.
Technical Excellence.
EXCLUSIVELY DELIVERED.
REGUPOL Barrier 99-201 - Moisture Vapour Suppressant
REGUPOL adhesive 43-105 - Acrylic Flooring Adhesive
REGUPOL Sonus Multi 3 (REGUPOL 4515 Multi 3 mm) - Acoustic Underlay
SuperLag Quietslab used at ExxonMobil Oil Refinery
Sound Absorption Solution for CCGT Power Station at Landivisiau in Brittany
Nine Elms Parkside Case Study: Under Screed Acoustic Layer
Regupol Vibration Case Study: Gainsborough’s House
SuperLag Quietslab used at ExxonMobil Oil Refinery
Sound Absorption Solution for CCGT Power Station at Landivisiau in Brittany
Nine Elms Parkside Case Study: Under Screed Acoustic Layer
The Gateway, Leeds, Regupol 4515 (REGUPOL sonus eco) Acoustic Underlay Case Study
Walsall Manor Hospital - Case Study
The Kingsmead Academy, Taunton, Somerset
The Grange University Hospital - Cwmbran, Wales
Katherine Warington School - Harpenden - Hertfordshire
London Aquatic Centre - Olympic Pool
DAVID LLOYD LEISURE CLUB
Single Storey House, Fife
The Kingsmead Academy, Taunton, Somerset