OVERVIEW
When Glendale Engineering Ltd embarked on the construction of a new sawmill facility in Glendale Engineering Ltd, the objective was clear: deliver a high-quality, energy-efficient building that would support long-term operational performance while staying on programme and within budget.
With a total roof area of 6,270sqm, the project required careful coordination between the building envelope and secondary steelwork to ensure smooth integration and efficient installation.
Precision Coordination for Programme Success:
From the outset, programme management was critical. The integration between the building envelope and the secondary steelwork needed to be seamless to maintain construction momentum.
Glendale Engineering Ltd explained:
“We needed a high-quality, solution delivered on time and within budget. The secondary steelwork was key to keeping the programme on track.”
By supplying the secondary steelwork, Steadmans ensured compatibility across systems, simplifying installation and reducing the risk of delays on site.
Why Steadmans?
Glendale Engineering Ltd selected Steadmans based on their strong industry reputation and proven reliability.
“We chose Steadmans for their strong reputation, proven product quality, and reliable service. Their experience gave us confidence from the outset.”
Several factors stood out during the specification process:
This combination allowed the project team to move from specification to delivery with clarity and confidence.
From Specification to Delivery:
The project was described as smooth and well-managed throughout.
“The process was smooth and well managed from start to finish. Communication was clear and delivery was exactly as scheduled.”
Steadmans worked closely with the build team to ensure delivery aligned precisely with installation phases – supporting efficient site progress and labour management.
The secondary steelwork system, including purlins, played a key role in supporting the structural performance and installation efficiency of the building.
The system provided:
The secondary steelwork integrated seamlessly with the main structure, ensuring structural alignment and installation efficiency across the 6,270sqm roof area.
The Outcome:
The completed sawmill facility delivers:
Client Feedback:
Sutcliffe Construction said:
“The quality and service fully met our expectations. The team kept us informed and delivered on time.
“Absolutely – we would recommend Steadmans. They provide reliable products backed by excellent support. We wouldn’t hesitate to work with them again.”
Lindsey Lovel, National Sales Manager, from Steadmans said:
“The Glendale Engineering Ltd sawmill project is a great example of how coordinated product supply can streamline large-scale industrial construction. By delivering both the secondary steelwork, we were able to support programme efficiency while ensuring structural performance.
It’s been a pleasure working with the Glendale Engineering Ltd team on such an impressive facility in the North East.”
Zed Section roof purlins - Zed Section Roof Purlins
Cee Section side rails - Cee Section Cladding Rails
Eaves Beam Sections - Eaves Beam Sections
AS13/3 Profiled Sheeting - Single Skin Steel Cladding Sheet
Steadmans - Rapid Roofing Solutions for a Live Operating Site
Steadmans - Strength, Space and Reliability for Modern Cattle Housing
Tailors Corner, Leeds
Landmark Pinnacle, Level 27
Thomas Keble School
Grangemouth – Scotland’s Largest Port
Circularity - Repurposing the Industrial Landscape
Barn Style Self-Build Project - The Black Barn
Steadmans - Rapid Roofing Solutions for a Live Operating Site