OVERVIEW
The iconic Television Centre is undergoing a major redevelopment to deliver hundreds of new homes. Phase 2 introduces a new building containing over 150 apartments, with Klasse C-Board specified as the external sheathing board. Constructed offsite, the project placed increased emphasis on materials capable of withstanding handling, transportation and prolonged exposure to the elements. With construction running over an extended period, Klasse C-Board’s high impact strength and durability provided confidence that performance would be maintained throughout the build.