NBS Source
I'm a manufacturer

This case study is no longer available.

Ysgol Bae Baglan

OVERVIEW

The client and main design/build Contractor wanted Ysgol Bae Baglan to be truly outstanding in terms of quality and facilities, and the head teacher had a clear vision for the new academy. All of the fencing, gates and street furniture had to fit within the overall design concept and the fencing and gates had to be Secured by Design – yet the budget on the £40-million project was very tight.

No featured products in this case study

Contact Procter Contracts by clicking the button below to find out which products were used in this case study.